Tender Value
₹3.7 Cr
EMD Value
₹8.8 L
Closing Date
7 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
GM JAL
Sector-5, Noida
Strengthening of Sewerage (Replacement of Old Chocked and Damaged Sewer and Water line in Village-Barolla Noida.
2026_NOIDA_1163481_1
19/SM-JAL-III/2026-27
Open Tender
Civil Works - Others
365 days
NOIDA
Please refer to tender document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹8.8 L
24 Jun 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of E/I. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3,098 | Cum | 923.42 | ₹28,60,755.16 |
| 2 | Earth work in excavation by mecanical means (hydraulic excavater)/manual means in over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) i/c disposal of excavated earth, lead up to 50 m and lift up 1.5, disposed earth to be levelled and neatly dressed in all kind of soil.The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of E/I. | 16,327 | Cum | 136 | ₹22,20,472 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. | 16,327 | Cum | 93 | ₹15,18,411 |
| 4Extra for every additional lift of 1.5 or part thereof in all kind of soil. | |||||
| 4.01 | a) 1.50 - 3.00 m | 6,087 | Cum | 15.8 | ₹96,174.6 |
| 4.02 | 3.00-4.50m | 1,040.4 | Cum | 31.6 | ₹32,876.64 |
| 5Centring and shuttering including strutting, propping etc. and removal of form for:- | |||||
| 5.01 | a) Foundation, footings, bases of columns etc. for mass concrete. | 1,414 | Sqm | 181.64 | ₹2,56,838.96 |
| 6Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | |||||
| 6.01 | As in item 279 above but in proportions of 8:4:1 | 910 | Cum. | 5,820 | ₹52,96,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
TD19.pdf
Tender Documents • 1.94 MB
C19.xls
Additional Documents • 0.03 MB
BOQ_2181158.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid