Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Finance | -40.97% | ₹13.8 L | L1 | Admitted-Finance |
| 2 | L2₹15.5 L+₹1.7 L (12.0%)Admitted-Finance | -33.90% | ₹15.5 L+₹1.7 L (12.0%) | L2 | Admitted-Finance |
| 3 | L3₹15.5 L+₹1.7 L (12.0%)Admitted-Finance | -33.88% | ₹15.5 L+₹1.7 L (12.0%) | L3 | Admitted-Finance |
| 4 | L4₹17.5 L+₹3.7 L (27.1%)Admitted-Finance | -24.99% | ₹17.5 L+₹3.7 L (27.1%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹23.4 L
EMD Value
₹46,760
Closing Date
17 Aug 2026, 4:00 pmClosed
ER Mohd Iqbal Ganie
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_318147_7
NIT 33 of 2026-27 Dated 27-07-2026
Open Tender
Civil Works
Percentage
60 days
Executive Engineer PWD RnB Division Banihal
Refer to SBD
2 documents required · 2 mandatory
₹800
Executive Engineer PWD RnB Division Banihal
₹46,760
Executive Engineer PWD RnB Division Banihal
27 Aug 2026
27 Jul 2026
18 Aug 2026
28 Jul 2026
17 Aug 2026
28 Jul 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 405.54 | cum | 256.85 | ₹1,04,162.95 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 19.98 | cum | 4,826.5 | ₹96,433.47 |
| 0.0 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge | 570.24 | cum | 3,093.3 | ₹17,63,923.39 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% boulders | 16.2 | cum | 4,774.46 | ₹77,346.25 |
| 0.0 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | 10.8 | sqm | 562.15 | ₹6,071.22 |
| 0.0 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 43.2 | sqm | 283.8 | ₹12,260.16 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 43.2 | sqm | 286.35 | ₹12,370.32 |
| 0.0 | Dumping stone including cost of stone in Horizontal on level | 32.4 | cum | 937.9 | ₹30,387.96 |
| 0.0 | Carriage of Material by Mechnical Transport including Loading, including stacking
1. Cement for ana vg lead of 03 Km | 2.6 | tonne | 147.41 | ₹383.27 |
| 0.9 | 2. Sand for an avg lead of 55 Km | 9.39 | cum | 796.3 | ₹7,477.26 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1046555.xls
BOQ • 0.32 MB
ITIExtensionbanihal.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .