Tender Value
₹21.7 Cr
EMD Value
₹43.3 L
Closing Date
13 Jul 2026, 2:00 pm4d left
General Manager, UPPCL, Zone-6 Noida
K-2, Sector-116, Noida Gautambudha Nagar
Construction Work of C.M. Model Composite School (Pre-Primary to Class-12th) Primary School-1 at Village Kakor Kalan Block Chhaproli in District Baghpat
2026_UPPRC_1164915_1
34/PCL/GM/Zone-6/Noida/2026-27 Dt 17.06.2026
Open Tender
Civil Works
545 days
Village Kakor Kalan Block Chhaproli in District Ba
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹43.3 L
30 Jun 2026
30 Jun 2026
13 Jul 2026
30 Jun 2026
13 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | - | CUM | 190.66 | - |
| 2 | In all kind of soil upto 1.5m to 3.0m. depth | 1 | CUM | 283.53 | ₹283.25 |
| 3 | In all kind of soil upto 3.0m to 4.5m. depth | - | CUM | 376.41 | - |
| 4 | Prepration and consolidation of sub grade with power road roller of 8 to12 tonne capacity after excavating earth to an average of 22.5 cm depth , dressing to camber and consolidating with road roller including making good undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead up to 50 meters. | - | SQM | 160.33 | - |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 0.2 | CUM | 513.09 | ₹102.62 |
| 6 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. | - | CUM | 4,989.45 | - |
| 7 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | - | CUM | 1,555.54 | - |
| 8 | Construction of drain along with apron. 150X150MM | 1 | RM | 810.42 | ₹809.61 |
| 9 | Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete.(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | 1 | SQM | 227.1 | ₹226.87 |
| 10 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in above plinth levle all floors | 0.8 | CUM | 7,222.25 | ₹5,777.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tender34.pdf
Tender Documents • 3.58 MB
dwg34.pdf
Additional Documents • 6.83 MB
BOQ_2184590.xls
BOQ • 0.89 MB
Download all tender documents and submit your bid