Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.1 LAccepted-Finance | ₹42.1 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹42.6 LRejected-Finance | ₹42.6 L | L2 | Rejected-Finance Upper |
Tender Value
₹42.1 L
EMD Value
₹4.1 L
Closing Date
30 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD LONI GHAZIABAD
Construction work In Npp Loni Work No 19
2026_DOLBU_1139998_19
129/NPPLONI/2026-27 DATE 20-04-2026
Open Tender
Civil Works
45 days
NAGAR PALIKA PARISHAD LONI GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,956
EXECUTIVE OFFICER
₹4.1 L
11 May 2026
21 Apr 2026
1 May 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Site clearance ( AOR) | - | HRS | - | - | - |
| 2 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift up to1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 4 | Brick masonry work in cement mortar (1:4) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 5 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technicalspecification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge. | - | QTL | - | - | BI01010001010000000000000515BI0100001113 |
| 6 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4") guage approved stone ballast in proportions of 1:1.5:3 in R.C.C,COLUMN excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 289new item slab | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 7 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4") guage approved stone ballast in proportions of 1:1.5:3 in Ligther beam excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 285 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 8 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4") guage approved stone ballast in proportions of 1:1.5:3 in haviear beam excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 286 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 9 | Brick masonry work in cement mortar (1:4) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 613, 4 & 1204 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 10 | Plastering with cement mortar (1:4), 15 mm thick on brick work in substructure as per technical specification Clauses 613.4 & 1204 | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_2128767.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid