Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance RANIPATHAR MAYNADAL KHAYRASOLE PANDAVESWAR 731133 WEST BENGAL INDIA | PANDAVESWAR | BIRBHUM | WEST BENGAL | 731133 | L1 | Admitted-Finance | |
| 2 | L2₹1.9 L+₹6,614.48 (3.70%)Admitted-Finance NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical COLLEGE PARA PANDAVESWAR BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical Rejected as per TC |
| Sl No | Description | Qty | Unit | ENERGY ENGINEERING L2 | RADHAKANTA ENTERPRISE L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | Supply of 63 A, 4 Pole, 415 V MCCB | 1 | Nos | 53,000 ₹53,000 | 52,000 ₹52,000 Lowest |
| 3.00 | Supply of 200 Amps, ICTP Switch, 4 Pole, 415V | 5 | Nos | 12,000 ₹60,000 | 11,500 ₹57,500 Lowest |
| 4.00 | Supply of 10Sqmm cable. | 200 | M | 145 ₹29,000 | 139 ₹27,800 Lowest |
| 5.00 | Supply of 1 sqmm copper wire for earthing. | 12 | Roll | 1,450 ₹17,400 | 1,400 ₹16,800 Lowest |
| 6.00 | Supply of 63 A MCB | 3 | Nos | 3,800 ₹11,400 | 3,700 ₹11,100 Lowest |
| 7.00 | Fitting Charges. | 1 | LS | 12,900 ₹12,900 | 12,000 ₹12,000 Lowest |
| 8.00 | EPF @ 12% on Labour Cost. | 1 | LS | 1,640.88 ₹1,640.88 | 1,526.4 ₹1,526.4 Lowest |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
30 Aug 2025, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
Supply and fitting of difference electrical accessories and MCCB at various locations of Kenda Area
2025_ECL_341843_1
GM/KND/AE(ENM)/55(TN)/25-26/08
Open Tender
Miscellaneous Works
Item Rate
10 days
Kenda Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,700
27 Nov 2025
20 Aug 2025
1 Sept 2025
20 Aug 2025
30 Aug 2025
20 Aug 2025
20 Aug 2025 - 25 Aug 2025
Amount
Item Description/ Heading
Supply of 63 A, 4 Pole, 415 V MCCB
Supply of 200 Amps, ICTP Switch, 4 Pole, 415V
Supply of 10Sqmm cable.
Supply of 1 sqmm copper wire for earthing.
Supply of 63 A MCB
Fitting Charges.
EPF @ 12% on Labour Cost.
Total impact of GST for the purpose of CTC
ENERGY ENGINEERING (BID ID -1179119)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .