| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC FIRDOUS ABAD BATMALOO SRINAGAR PIN 190004 J K | SRINAGAR | SRINAGAR | J K | 190004 | L1 | Accepted-AOC Awarded being lowest as per NIT | |
| 2 | L2₹15.6 L+₹1.7 L (12.2%)Rejected-Finance 29 IQBAL COLONY SONWAR SRINAGAR 190004 J K | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190004 | L2 | Rejected-Finance Rejected being L2 bidder | |
| 3 | L3₹18.2 L+₹4.3 L (30.9%)Rejected-Finance | L3 | Rejected-Finance Rejected being L3 bidder | |
| 4 | L4₹18.4 L+₹4.5 L (32.1%)Rejected-Finance | L4 | Rejected-Finance Rejected being L4 bidder | |
| 5 | L5₹20.0 L+₹6.1 L (43.6%)Rejected-Finance | L5 | Rejected-Finance Rejected being L5 bidder |
| Sl No | Description | Qty | Unit | M/S TAHIRA ENTERPRISES L2 | M/S Sky Engineers L3 | M/S GHULAM RASOOL LONE L6 | M/S JIWANRISAM SERVICES PRIVATE LIMITED L4 | VEDA INFRASTRUCTURE L1 | Concept Engineering & Constructions L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Disconnecting defective out door/indoor transformers of following various capacity upto 630 KVA to 750 KVA from HT/LT side, taking out complete transformer oil, storing the same in suitable container (to be arranged by the contractor) opening the top cover and lifting the core assembly by means of tripod and chain pulley block carefully to check its condition, refilling the transformer oil after complete dehydration/filtration if required (to be paid separately) and necessary repairs re fixing complete core assembly and complete core assembly fixing the top cover and re-installation complete all as specified and directed by Engr-in- Charge. | 2 | Each Job | 15,000 ₹30,000 | 5,000 ₹10,000 | 2,000 ₹4,000 Lowest | 16,000 ₹32,000 | 6,000 ₹12,000 | 15,000 ₹30,000 |
| 2.00 | -Ditto- all as per Item No 1 above but distribution transformer of capacity 400 to 500 KVA complete all as specified and directed by Engr-in- Charge. | 2 | Each Job | 13,000 ₹26,000 | 8,000 ₹16,000 | 2,000 ₹4,000 Lowest | 13,000 ₹26,000 | 6,000 ₹12,000 | 14,000 ₹28,000 |
| 3.00 | -Ditto- all as per Item No 1 above but distribution transformer of capacity 250 KVA to 350 KVA complete all as specified and directed by Engr-in- Charge. | 3 | Each Job | 12,000 ₹36,000 | 6,000 ₹18,000 | 2,000 ₹6,000 Lowest | 11,000 ₹33,000 | 5,000 ₹15,000 | 12,000 ₹36,000 |
| 4.00 | -Ditto- all as per Item No 1 above but distribution transformer of capacity 160 KVA TO 200 KVA complete all as specified and directed by Engr-in- Charge. | 3 | Each Job | 10,000 ₹30,000 | 4,000 ₹12,000 | 2,000 ₹6,000 Lowest | 11,000 ₹33,000 | 4,000 ₹12,000 | 11,000 ₹33,000 |
| 5.00 | Ditto all as per Item No 1 above but distribution transformer of capacity 63 KVA to 100 KVA complete all as specified and directed by Engr-in- Charge.
Note: (For item No 1 to 5)
(a) Pole mounted transformer lowering and taking down the same from pole structure to ground carefully if required shall be paid separately under relevant items. (b) In case of major repairs/replacement in transformer which can not be undertake at site the transformer shall be shifted to civil workshop and the cost shall be paid separately under relevant items (c) Cost of dehydration/filtration and other necessary repairs shall be measured and paid separately under relevant item (d) Contractor shall bring the mechanic at site for first inspection of the transformer after that transformer shall be shifted to civil workshop | 3 | Each Job | 9,000 ₹27,000 | 4,000 ₹12,000 | 5,000 ₹15,000 | 11,000 ₹33,000 | 3,000 ₹9,000 Lowest | 10,000 ₹30,000 |
| 6.00 | Dismantling and taking down out door transformer from two pole /four pole/hard standing structure lowering the same carefully by means of chain pulley block and all other required T&P and re-installation after repairs complete all as specified and directed by Engr-in- Charge. | 6 | Each Job | 4,000 ₹24,000 | 4,000 ₹24,000 | 4,000 ₹24,000 | 4,500 ₹27,000 | 1,000 ₹6,000 Lowest | 40,000 ₹2,40,000 |
| 7.00 | -Ditto- all as per Item No 1 above but distribution transformer of capacity 63 KVA to 100 KVA complete all as specified and directed by Engr-in- Charge.
Note: (For item No 1 to 5)
(a) Pole mounted transformer lowering and taking down the same from pole structure to ground carefully if required shall be paid separately under relevant items. (b) In case of major repairs/replacement in transformer which can not be undertake at site the transformer shall be shifted to civil workshop and the cost shall be paid separately under relevant items (c) Cost of dehydration/filtration and other necessary repairs shall be measured and paid separately under relevant item (d) Contractor shall bring the mechanic at site for first inspection of the transformer after that transformer shall be shifted to civil workshop | 580 | Kg | 500 ₹2,90,000 | 10 ₹5,800 Lowest | 300 ₹1,74,000 | 500 ₹2,90,000 | 500 ₹2,90,000 | 500 ₹2,90,000 |
| 8.00 | Material & labour for rewinding transformers if required while repairing) of HT side coil with supper enamelled Copper wire/strip matching with existing size/ gauge, fixing the coil in position in core assembly and making connection as per existing pattern including providing insulation, varnish complete all as specified and directed by Engr-in- Charge.
Notes :
1. The cost of coil shall be inclusive of varnish sleeve and insulating material etc. no extra payment shall be made for the same.
2. Actual weight of wire (used for rewinding) will be measured and paid for each transformer mentioned above. | 680 | Kg | 550 ₹3,74,000 | 900 ₹6,12,000 | 500 ₹3,40,000 Lowest | 550 ₹3,74,000 | 600 ₹4,08,000 | 500 ₹3,40,000 Lowest |
| 9.00 | Renewal of cracked/worn out synthetic rubberized cork gasket 6mm thick for HT/LT bushes of various size etc complete all as specified and directed by Engr-in- Charge. | 13 | Each | 650 ₹8,450 | 1,000 ₹13,000 | 300 ₹3,900 | 800 ₹10,400 | 50 ₹650 Lowest | 6,000 ₹78,000 |
| 10.00 | M&L for painting the outer surface of the transformer / Servo Voltage stabilizer with two coats of synthetic enamelled paint after preparing the surface dust and oil free and cleaning the bushes, name plate etc paint free after painting including writing MES/ SM No with enamelled paint for fransformer of rating 50 KVA to 630 KVA (Indoor/ outdoor type) complete all as specified and directed by Engr-in- Charge. | 6 | Each Job | 4,000 ₹24,000 | 1,000 ₹6,000 | 1,500 ₹9,000 | 4,000 ₹24,000 | 800 ₹4,800 Lowest | 4,000 ₹24,000 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
18 Jul 2025, 6:00 pmClosed
CWE, HQ 133 WORKS ENGRS
HQ 133 WORKS ENGRS, C/O 56 APO, PIN- 914133
CWEK/TOKEN-27/864 EWS/2025-26- REPAIR- MAINTENANCE OF DISTRIBUTION TRANSFORMER, LT VOLTAGE STIBILZER OF DIFFERENT CAPACITY INCL ALLIED WORK UNDER GE 864 EWS, TPP 2025-26
2025_MES_715791_1
CWEK/TOKEN-27/864 EWS/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE 864 EWS
Class E and above and Category b ii
7 documents required · 7 mandatory
₹500
GE 864 EWS
₹50,000
HQ 133 WORKS ENGRS
14 Aug 2025
20 Jun 2025
26 Jul 2025
20 Jun 2025
18 Jul 2025
5 Jul 2025
20 Jun 2025 - 23 Jun 2025
25 Jun 2025
Amount
Disconnecting defective out door/indoor transformers of following various capacity upto 630 KVA to 750 KVA from HT/LT side, taking out complete transformer oil, storing the same in suitable container (to be arranged by the contractor) opening the top cover and lifting the core assembly by means of tripod and chain pulley block carefully to check its condition, refilling the transformer oil after complete dehydration/filtration if required (to be paid separately) and necessary repairs re fixing complete core assembly and complete core assembly fixing the top cover and re-installation complete all as specified and directed by Engr-in- Charge.
-Ditto- all as per Item No 1 above but distribution transformer of capacity 400 to 500 KVA complete all as specified and directed by Engr-in- Charge.
-Ditto- all as per Item No 1 above but distribution transformer of capacity 250 KVA to 350 KVA complete all as specified and directed by Engr-in- Charge.
-Ditto- all as per Item No 1 above but distribution transformer of capacity 160 KVA TO 200 KVA complete all as specified and directed by Engr-in- Charge.
Ditto all as per Item No 1 above but distribution transformer of capacity 63 KVA to 100 KVA complete all as specified and directed by Engr-in- Charge. Note: (For item No 1 to 5) (a) Pole mounted transformer lowering and taking down the same from pole structure to ground carefully if required shall be paid separately under relevant items. (b) In case of major repairs/replacement in transformer which can not be undertake at site the transformer shall be shifted to civil workshop and the cost shall be paid separately under relevant items (c) Cost of dehydration/filtration and other necessary repairs shall be measured and paid separately under relevant item (d) Contractor shall bring the mechanic at site for first inspection of the transformer after that transformer shall be shifted to civil workshop
Dismantling and taking down out door transformer from two pole /four pole/hard standing structure lowering the same carefully by means of chain pulley block and all other required T&P and re-installation after repairs complete all as specified and directed by Engr-in- Charge.
-Ditto- all as per Item No 1 above but distribution transformer of capacity 63 KVA to 100 KVA complete all as specified and directed by Engr-in- Charge. Note: (For item No 1 to 5) (a) Pole mounted transformer lowering and taking down the same from pole structure to ground carefully if required shall be paid separately under relevant items. (b) In case of major repairs/replacement in transformer which can not be undertake at site the transformer shall be shifted to civil workshop and the cost shall be paid separately under relevant items (c) Cost of dehydration/filtration and other necessary repairs shall be measured and paid separately under relevant item (d) Contractor shall bring the mechanic at site for first inspection of the transformer after that transformer shall be shifted to civil workshop
Material & labour for rewinding transformers if required while repairing) of HT side coil with supper enamelled Copper wire/strip matching with existing size/ gauge, fixing the coil in position in core assembly and making connection as per existing pattern including providing insulation, varnish complete all as specified and directed by Engr-in- Charge. Notes : 1. The cost of coil shall be inclusive of varnish sleeve and insulating material etc. no extra payment shall be made for the same. 2. Actual weight of wire (used for rewinding) will be measured and paid for each transformer mentioned above.
Renewal of cracked/worn out synthetic rubberized cork gasket 6mm thick for HT/LT bushes of various size etc complete all as specified and directed by Engr-in- Charge.
M&L for painting the outer surface of the transformer / Servo Voltage stabilizer with two coats of synthetic enamelled paint after preparing the surface dust and oil free and cleaning the bushes, name plate etc paint free after painting including writing MES/ SM No with enamelled paint for fransformer of rating 50 KVA to 630 KVA (Indoor/ outdoor type) complete all as specified and directed by Engr-in- Charge.
Supply and renewal of silica gel only with fresh blue coloured complete all as specified and directed by Engr-in- Charge.
Supply and fixing in renewal Tap changer switch suitable for Transformer 63 KVA to 200 KVA complete all as specified and directed by Engr-in- Charge.
Supply and fixing in renewal Tap changer switch suitable for Transformer of capacity 250 KVA to 630 KVA complete all as specified and directed by Engr-in- Charge.
Supply and renewal HT/LT side cable box cover plate made out of MS sheet of 16 SWG complete with nuts, bolts washers suitable for indoor / outdoor type transformer of capacity 63 KVA to 400 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of HT 11 KV bush insulator suitable for distribution transformer of any type and of size upto 200 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of HT 11 KV bush insulator suitable for distribution transformer of any type and capacity 250 KVA to 630 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of LT bush insulator suitable for distribution transformer of any type and of size upto 200 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of LT bush insulator suitable for distribution transformer of any type and capacity 250 KVA to 630 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of HT bush rod made out of brass with nut bolt and washer suitable for distribution transformer of any type and of size upto 200 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of HT bush rod made out of brass with nut bolt and washer suitable for distribution transformer of any type and capacity 250 KVA to 630 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of LT bush rod made out of brass with nut bolt, rubber packing and washer suitable for distribution transformer of any type and of size upto 200 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of LT bush rod made out of brass with nut bolt, rubber packing and washer suitable for distribution transformer of any type and capacity 250 KVA to 630 KVA complete all as specified and directed by Engr-in- Charge.
M&L for renewal of transformer oil for topping up or for renewal in burnt Transformers oil / Servo voltage stabilizer complete all as specified and directed by Engr-in- Charge. Note: Oil shall be in company sealed barrel having BDV not less than 40KV and Transformer oil topping up or replacement should be done on existing installation place on same days)
Material & labour cleaning sprarked/old transformer oil and all other foreign materials from external surface of transformer of capacity 63 to 315 KVA (incl voltage stablizer of different capacity) and preparing the surface to paint the transformer body one coat of synthetic enamel while paint, including writing MES No & SM No withsmooth gray paint on back base incl replacement of outlived silica gel with new silica gel ‘A’ grade complete for transformer of capacity 63 to 315 KVA complete all as specified and directed by Engr-in- Charge. Note: Transformer oil filteration & dehyration by Ultra High Vaccum double stage machine should be done on existing installation place on same days and report of the same be obtained from the vendor).
Material & labour cleaning sprarked/old transformer oil and all other foreign materials from external surface of transformer of capacity 350 to 750 KVA and preparing the surface to paint the transformer body one coat of synthetic enamel while paint, including writing MES No & SM No withsmooth gray paint on back base incl replacement of outlived silica gel with new silica gel ‘A’ grade complete for transformer of capacity 350 to 750 KVA complete all as specified and directed by Engr-in- Charge. Note: Transformer oil filteration & dehyration by Ultra High Vaccum double stage machine should be done on existing installation place on same days and report of the same be obtained from the vendor).
M&L for plain cement concrete, 1:2:4, type B-2 using 40 mm graded stone aggregates as in foundation, filling, mass concrete and copings and the like including necessary form work complete all as specified and directed.
Excavation in trenches n. exc. 1.5 mtr in wide and n. exc. 1.5 mtr in depth for laying of underground cable and getting out in soft/loose soil complete all as specified and directed.
Returning, filling in excavated soil in trenches including spreading, leveling, watering and well ramming in layers n. exc. 25 cm thick complete all as specified and directed.
Removing of excavted soil to a distance n. exc. 50 mtr and deposited where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed.
M&L local sand dry, filling in trenches around under ground cable complete all as specified and directed.
Supply and laying unreinforced precast concrete cable cover on the cable in the trench, class HV, Type-I, flat size 300mm X180mmX40mm (for 11KV HT cable) complete all as specified and directed.
Supplying, laying or fixing, jointing and testing in repair/renewal of unserviceable HT under ground electric power cable, XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, (conforming to ISI-7098), ISI Marked, with aluminium conductor multi stranded, heavy duty, 11000 Volts grade (earthed), 185 sqmm 3 core laid in trenches/laid under floor, roads, paths or fixed on walls /on poles/in ducts etc. complete all as specified and directed.
Supply, laying, jointing, testing and commissioning of High Tension (HT) XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, heavy duty, earthed electric power cable, cross sectional area 300 Sqmm 3.0 core aluminum conductor 33000 Volts grade under ground cable including both side connection with cable lugs etc, laid in trenches, along poles or passing through pipes or laid under floor or through roads etc, complete all as specified and as directed.
Supply and fix in renewal of cross arms bracings, supports, clamps and back plates fabricated from structural steel sections including nuts, bolts, washers, welding, bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of aluminium paint after preparation of surface, complete all as specified and directed.
Demolation of cement concrete in any description and in any position not otherwise specifically provied for complete all as specified and as directed.
M/S TAHIRA ENTERPRISES (BID ID -3353586)
M/S Sky Engineers (BID ID -3363395)
M/S JIWANRISAM SERVICES PRIVATE LIMITED (BID ID -3363471)
Concept Engineering & Constructions (BID ID -3363532)
M/S GHULAM RASOOL LONE (BID ID -3353708)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .