Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹33.9 L+₹34,004 (1.01%)Accepted-AOC 1ST FLOOR SAI COMPLEX BESIDES ADITYA VIP CONCLAVE NEAR GANESH MANDAP CHHAK JHARPADA BHUBANESWAR | BHUBANESWAR | KHORDHA | ODISHA | 751006 | L2 | Accepted-AOC The work is awarded to Ms AADYA URJA SOLUTIONS PRIVATE LIMITED | |
| 2 | L1₹33.5 LRejected-Finance AT TALASAHI PO DISTRICT KHORDHA | KHORDHA | ODISHA | L1 | Rejected-Finance Amount quoted is more than 14.99 percent less | |
| 3 | L3₹43.8 L+₹10.3 L (30.7%)Rejected-Finance 8TH FLOOR IDCO TOWER BHUBANESWAR 751022 ODISHA INDIA | KHORDHA | ODISHA | 751022 | L3 | Rejected-Finance Highest amount quoted bidder. |
Tender Value
₹39.8 L
EMD Value
₹39,846
Closing Date
2 Apr 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CGM PC IDCO
IDCO Tower Janpath, Bhubaneswar
Construction of 11kV OH Line and UG Line for Power Supply to Gramadiha IE, under SDO Jatani, Khordha
2024_IDCO_102454_1
PC/EST/E-212/2023-24
National Competitive Bid
Electrical Works
Item Rate
90 days
Gramadiha, Jatani
Please refer tender documents
2 documents required · 2 mandatory
₹7,080
₹39,846
Yes
20 Jan 2025
12 Mar 2024
3 Apr 2024
12 Mar 2024
2 Apr 2024
15 Mar 2024
12 Mar 2024 - 14 Mar 2024
Amount
Part A- Cost of Materials for 11KV DP with AB Switch
Supply and erection of 11mtr long 160 x 152 WPB pole (GI) (30.44KG/Mtr.). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.
Supply and installation of Top G.I. Channel 100 x 50 x 6mm, 9.56 Kg/Mtr., each G.I. Channel length 3 mtr,2no's G.I. Channel required ( 2x9.56x3=57.36Kg) .Complete in all respect as per the technical specification and direction of EIC.
Supply fabrication and installation of Fish plate 50 x 6mm 2.36Kg/mtr each 0.280mtr length 6 no's required=(6x2.36x0.280) .Complete in all respect as per the technical specification and direction of EIC.
Supply fabrication and installation of AB switch Mounting G.I. Channel 75x40x4.8 mm,7.14 Kg/Mr. each G.I. Channel length 3mtr 2 no's G.I. Channel required =(7.14x3x2) .Complete in all respect as per the technical specification and direction of EIC.
Supply fabrication and installation of AB switch side support G.I. Channel 100x50x6 mm,9.56 Kg/mtr each G.I. Channel length 0.35mtr 2 no's G.I. Channel required =(9.56x2x0.35) .Complete in all respect as per the technical specification and direction of EIC.
Supply fabrication and installation of G.I. Channel support for down pipe 75x40x4.8 mm,7.14 Kg/mtr each G.I. Channel length 0.8mtr 1no's G.I. Channel required =(7.14x0.8x1).Complete in all respect as per the technical specification and direction of EIC.
Supply febrication and installation of Double Pole Belting Channel (GI) 75X40X 4.8mm., 7.14Kg/Mtr., each channel length 3.00 Mtr.,4 nos channel required =( 4x7.14x3.00)Kg . Complete in all respect as per the direction and specification of EIC.
Supply febrication and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512mtr., 4 nos angle required = (4*4.5*3.512)Kg. Complete in all respect as per the direction and specification of EIC.
Supply & installation of Danger Plate 2 Nos. (Each DP) Complete in all respect as per the direction and specification of EIC.
Supply & installation of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 nos = (2x0.59x0.510)Kg. Complete in all respect as per the direction and specification of EIC.
Supply of H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.511 Mtr. Length, 2 no's qty. required ( 1 Pair)
Supply of H.T. Stay set (Complete )
Supply of H.T. Stay Insulator Type-C (2 No's.)
Supply of 7/10 SWG Stay Wire 15Kg /stay
Supply of Gi Pipe Earthing 40mm. 3 Mtr. Long
Supply and installation of 50x6mm GI Flat for earthing, 2.36Kg/mtr., (12.5mtr for LA,3mtr for AB switch body,2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36Kg. Complete in all respect as per the direction and specification of EIC.
Supply and installtion of GI barbed wire anticlimbing device 3 Kg. Per support 2 Quantity required =(2x3Kg). (each DP) Complete in all respect as per the direction and specification of EIC.
Supply and installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 Nos = (8x0.59x0.510)Kg. Complete in all respect as per the direction and specification of EIC.
SITC of Lightening Arrester (12kv,10kA) (Station Class-2).Complete in all respect as per the technical specification and direction of EIC.
SITC of AB Switch (11KV 400A 3pole, 50 Hz) as per technical specifications and direction of EIC.
SITC of 11KV pin insulator polymor as per technical specifications and direction of EIC.
SITC of H W fitting (B&S) 70KN 3Bolt as per technical specifications and direction of EIC.
SITC of Disc insulator (B&S) 70 KN polymer as per technical specifications and direction of EIC.
SITC of PG Clamp for 100 sqmm AAA conductor as per technical specifications and direction of EIC.
SITC of GI Nut, Bolt & washer of different sixes (13.718 Kg each DP with AB Switch) as per technical specifications and direction of EIC.
Supply and painting of Black Paint as required and as per the direction of EIC.
Supply and painting of Yellow Colour Paint for Background as required and as per the direction of EIC.
Part A- Cost of Civil & Service Work
Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0,5Cum cement concrete foundation 1:2:4 size (500rnmx 500mmx 800rnm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X 500X1500 mm.). Complete in all respect as per the specification and direction of EIC.
Mass Concreting of Pole pit wit Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0 45Cu.mtr.Complete in all respect as per the specification and direction of EIC.
Couping with ratio 1:1.5:3 with dimension( 500X500X450)= 0.1125 Cu mtr. Complete in all respect as per the specification and direction of EIC.
Construction Earthing chamber including installation of earthing pipe Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .Complete in all respect as per the technical specification and direction of EIC.
Part B- Cost of Materials for 11KV Cut point with 180 Degree angle.
Supply and erection of 13mtr long 160 x 152 WPB pole (GI) (30.44KG/Mtr.). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.
Supply, fabrication and installation of Straight Cross Arm 100 x 50 x 6mm, 9.56 KG/Mtr., each channel length1.2 mtr, 2no's channel required =( 2x9.56x1.2). Complete in all respect as per the specification and direction of EIC.
Supply fabrication and installation of Fish plate 50 x 6mm 2.36kg/mtr each 0.280 mlength 8no's required=(8x2.36x0.306). Complete in all respect as per the specification and direction of EIC.
Supply fabrication and installation of Straight Cross Arm 100 x 50 x 6mm, 9.56 KG/Mtr., each channel length0.306 mtr,4no's channel required =( 4x9.56x0.306). Complete in all respect as per the specification and direction of EIC.
Supply and installation of Danger plate. Complete in all respect as per the specification and direction of EIC.
Supply fabrication and installation of Back clamp for danger plate 25x3 mm flat, 0.59 kg/mtr , Flat of 0.510 mtr length 1 nos=(1x0.59x0.510). Complete in all respect as per the specification and direction of EIC.
Supply and installation of GI barbed wire anticlimbing device(3Kg/ support). Complete in all respect as per the specification and direction of EIC.
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 no's = (4x0.59x0.510). Complete in all respect.
SITC of 11 KV pin insulator polymer. Complete in all respect as per the specification and direction of EIC.
supply and installation of HW fitting (B&S) 70KN, 3Bolt . Complete in all respect as per the specification and direction of EIC.
SITC of Disc insulator (B&S) 70KN. Complete in all respect as per the specification and direction of EIC.
Supply ,installation & commissioning of Earthing of Support ( Coil Type ). Complete in all respect as per the specification and direction of EIC.
Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the specification and direction of EIC.
Supply and installation of PG Clamp for 100 sq.mm AAA conductor. Complete in all respect as per the specification and direction of EIC.
Supply and fixing of GI nut, bolt & washer, 3.55kg each cut pole of different size. As per the requirement.
Supply and painting of Black paint as required and direction of EIC.
Supply and painting of Yellow colour paint as required and direction of EIC.
Part B- Cost of Civil & Service Work
Mass Concreting of Pole pit wit Concreting ratio 1:1.5:3 (500mmX500mmX2200mm) = 0 55Cu.mtr.Complete in all respect as per the specification and direction of EIC.
Couping with ratio 1:1.5:3 with dimension( 500X500X450)= 0.1125 Cu mtr. Complete in all respect as per the specification and direction of EIC.
Part C- Cost of Materials for 11KV Cut point with 90 Degree angle.
Supply and erection of 11mtr long 160 x 152 WPB pole (GI) (30.44KG/Mtr.). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.
Supply, fabrication and installation of Straight Cross Arm 100 x 50 x 6mm, 9.56 KG/Mtr., each channel length1.2 mtr, 4no's channel required =( 4x9.56x1.2). Complete in all respect as per the specification and direction of EIC.
Supply fabrication and installation of Fish plate 50 x 6mm 2.36kg/mtr each 0.280 mlength 16no's required=(16x2.36x0.306). Complete in all respect as per the specification and direction of EIC.
Supply fabrication and installation of Straight Cross Arm 100 x 50 x 6mm, 9.56 KG/Mtr., each channel length0.306 mtr,4no's channel required =( 4x9.56x0.306). Complete in all respect as per the specification and direction of EIC.
Supply and installation of Danger plate. Complete in all respect as per the specification and direction of EIC.
Supply fabrication and installation of Back clamp for danger plate 25x3 mm flat, 0.59 kg/mtr , Flat of 0.510 mtr length 1 nos=(1x0.59x0.510). Complete in all respect as per the specification and direction of EIC.
Supply and installation of GI barbed wire anticlimbing device(3Kg/ support). Complete in all respect as per the specification and direction of EIC.
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 no's = (4x0.59x0.510). Complete in all respect.
SITC of 11 KV pin insulator polymer. Complete in all respect as per the specification and direction of EIC.
supply and installation of HW fitting (B&S) 70KN, 3Bolt . Complete in all respect as per the specification and direction of EIC.
SITC of Disc insulator (B&S) 70KN. Complete in all respect as per the specification and direction of EIC.
Supply ,installation & commissioning of Earthing of Support ( Coil Type ). Complete in all respect as per the specification and direction of EIC.
Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the specification and direction of EIC.
Supply and installation of PG Clamp for 100 sq.mm AAA conductor. Complete in all respect as per the specification and direction of EIC.
Supply of HT stay clamp.50x8 mm, flat,3.14Kg/Mtr, 0.551mtr length , 2 no'sqty required(1 Pair)
Supply of HT stay set complete.
Supply of HT stay insulator Type-C
Supply of 7/10SWG stay wire 15 kg/stay
Supply and fixing of GI nut, bolt & washer (7.433 Kg each cut pole) of different size. As per the requirement.
Supply and painting of Black paint as required and direction of EIC.
Supply and painting of Yellow colour paint as required and direction of EIC.
Part C- Cost of Civil & Service Work
Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0,5Cum cement concrete foundation 1:2:4 size (500rnmx 500mmx 800rnm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X 500X1500 mm.). Complete in all respect as per the specification and direction of EIC.
Mass Concreting of Pole pit wit Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0 45Cu.mtr.Complete in all respect as per the specification and direction of EIC.
Couping with ratio 1:1.5:3 with dimension( 500X500X450)= 0.1125 Cu mtr. Complete in all respect as per the specification and direction of EIC.
Part D- Cost of Materials for 11 KV Pin Points with WPB.
Supply and erection of 11mtr long 160 x 152 WPB pole (GI) (30.44KG/Mtr.). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.
Supply and erection of 13mtr long 160 x 152 WPB pole (GI) (30.44KG/Mtr.). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.
Supply and installation of 11kV V cross Arm(10.2 Kg each). Complete in all respect as per the specification and direction of EIC.
Supply and installation of Top bracket 100x50x6 mm GI channel (2Kg each). Complete in all respect as per the specification and direction of EIC.
Supply and installation of Danger plate. Complete in all respect as per the specification and direction of EIC.
Supply fabrication and installation of Back clamp for danger plate 25x3 mm flat, 0.59 kg/mtr , Flat of 0.510 mtr length 1 nos=(1x0.59x0.510). Complete in all respect as per the specification and direction of EIC.
Supply and installation of GI barbed wire anticlimbing device(3Kg/ support). Complete in all respect as per the specification and direction of EIC.
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 no's = (4x0.59x0.510). Complete in all respect.
SITC of 11 KV pin insulator polymer. Complete in all respect as per the specification and direction of EIC.
Supply ,installation & commissioning of Earthing of Support ( Coil Type ). Complete in all respect as per the specification and direction of EIC.
Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the specification and direction of EIC.
Supply and fixing of GI nut, bolt & washer (1.45Kg/Pin point) of different size. As per the requirement.
Supply, paving and Stringing of 100mm2 AAA Conductor. Complete in all respect as per the specification and direction of EIC.
Supply and painting of Black paint as required and direction of EIC.
Supply and painting of Yellow colour paint as required and direction of EIC.
Part D- Cost of Civil & Service Work
Mass Concreting of Pole pit wit Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0 45Cu.mtr.Complete in all respect as per the specification and direction of EIC.
Mass Concreting of Pole pit wit Concreting ratio 1:1.5:3 (500mmX500mmX2200mm) = 0 55Cu.mtr.Complete in all respect as per the specification and direction of EIC.
Couping with ratio 1:1.5:3 with dimension( 500X500X450)= 0.1125 Cu mtr. Complete in all respect as per the specification and direction of EIC.
Part E- Cost of Materials for Supply and Laying of 3C×400 sqmm UG Cable for road crossing.
Supply of 11KV, 3C×400 sqmm UG Cable
Supply of 11kV, 3Core, 400sqmm XLPE insulation armoured UG Cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA-15kA) as per the technical specifications and deirection of E-I-C.
Supply of Outdoor tennination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG Cable kits for 3Core as per the technical specifications and deirection of E-I-C.
Supply of materials for High Density Polyethelene (HDPE) pipe 160mm diameter, PE 80- PN8 for laying of 11kV UG cable as per the technical specifications and deirection of E-I-C.
Cost of Erection of 11KV, 3C×400 sqmm UG Cable
Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, Aluminum XLPE insulated armoured (extruted type) UG cable by open trench method.
Erection of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm. HT UG cable kits.
Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, XLPE by HDD method with HDPE pipe (160mm dia, PN8 PE8O) inside open trench.
Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench.
Civil Portion of 11KV, 3C×400 sqmm UG Cable
Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG cable Trench.
Earth work excavation of soil (1mtr. Width × 1 mtr depth) Route Length as required and as per the direction of EIC.
Earth work excavation of soil as required and as per the direction of EIC.
Earth work excavation of hard soil as required and as per the direction of EIC.
Back filling with excavation soil outside and above the trench as per the direction of EIC.
Supply and erection of GI Pipe of dia 150mm, class-B (8mtr) as per the technical specifications and direction of EIC.
Supply and erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works.
AADYA URJA SOLUTIONS PRIVATE LIMITED
T.RABIN KUMAR PATRO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .