Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical TECHNICAL QUALIFIED |
| 2 | Accepted-Technical GHAZIABAD NAGAR NIGAM | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | Accepted-Technical TECHNICAL QUALIFIED |
| 3 | Accepted-Technical 5 361 AWAS VIKAS MAINPURI | MAINPURI | UTTAR PRADESH | 205001 | Accepted-Technical TECHNICAL QUALIFIED |
Tender Value
₹6.7 L
EMD Value
₹13,380
Closing Date
7 May 2026, 5:00 pmClosed
APAR MUKHYA ADHIKARI
ZILA PANCHAYAT VRANASI
GRAM SABHA AKODA ME PANCHAYAT BHAVAN SE ANANT SINGH KE KHET TAK SICHAI NALI KARYA
2026_UPPRD_1141211_55
45/ZPV/2026-27
Open Tender
Civil Works
Percentage
ZILA PANCHAYAT VRANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
APAR MUKHYA ADHIKARI
₹13,380
22 Jun 2026
25 Apr 2026
8 May 2026
25 Apr 2026
7 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in black cotton soil/kankar mixed (load clay or sand) including lift up to 1.5m and lead up to 30m. and includind filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in chargeup to a distance of 30m from the foundation trenches including all T & P phowrah and basket etc. complete S.I No. 252. | 56.25 | M³ | 150 | ₹8,437.5 |
| 2 | Concrete with 4cm. Gauge brick ballast, sand stone of 1.25 F.M and cement in proportion of 1:6:12 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work.S.N-273. | 14.06 | M³ | 4,060 | ₹57,083.6 |
| 3 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 In 1:4 Cement mortar | 66.07 | M³ | 6,990.7 | ₹4,61,875.55 |
| 4 | Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204. | 637.5 | Sqm | 214.2 | ₹1,36,552.5 |
| 5 | Supply and fixing of Sign board | 1 | JOB | 5,000 | ₹5,000 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2132215.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].