Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -0.21% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹302 (0.21%)Admitted-Finance 34E SUREN SARKAR ROAD KOLKATA KOLKATA WB 700010 | KOLKATA | WEST BENGAL | 700010 | +0.00% | ₹1.4 L+₹302 (0.21%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹1,902 (1.32%)Admitted-Finance | +1.11% | ₹1.5 L+₹1,902 (1.32%) | L3 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹2,900
Closing Date
12 Sept 2026, 11:00 amClosed
EE/WS/GRWW
GRWW, BIDHANGARH, KOL -66
REPLACEMENT OF DEFECTIVE THRUST BEARING HOUSING (TBH) WITH OTHER ALLIED WORKS OF THE WPIL MAKE V.T. PUMP NO- 2 INCLUDING REASSEMBLY AND ALIGNMENT AT LOW LIFT PUMPING STATION UNDER GRWW.
2026_KMC_1040063_1
KMC/WS/GRWW/PH-I/eT-14/2026-27
Open Tender
MECHANICAL
Percentage
GRWW
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,900
15 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
12 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING OF MOTOR FROM THE EXISTING SOLE PLATE BY REMOVAL OF POWER CABLE COUPLING BOLTS AND FOUNDATION BOLTS AND AS PER SPECIFICATION &
DIRECTION OF EIC. | 1 | ITEM | 18,025 | ₹18,025 |
| 2 | REMOVAL OF THE MOTOR STOOD AND TBH UNIT AND STACKING THEM IN REPAIRING BAY AS PER DIRECTION OF THE EIC. | 1 | ITEM | 10,918 | ₹10,918 |
| 3 | REMOVAL OF THE GLAND PACKING BOX ASSEMBLY AND STACKING THE SAME ON THE SUITABLE PLACE AS PER DIRECTION OF THE EIC. | 1 | ITEM | 4,635 | ₹4,635 |
| 4 | DISMANTLING OF THE SPARES WITH RELATED ACCESSORIES OF WPIL MAKE PUMP CAREFULLY WITH THE ARRANGEMENT OF PROPER TOOLS & TACKLES.I) GLAND PACKING SET -1 SET. | 1 | ITEM | 2,524 | ₹2,524 |
| 5 | SUPPLY OF TBH OIL (SERVO SYSTEM 68 OIL ), MAKE-IOCL | 30 | LITER | 210 | ₹6,300 |
| 6 | REINSTALLATION OF THE MOTOR STOOL WITH PROPER ALIGNMENT WITH LINE SHAFT AND MAKING CONNECTION OF THE COOLING PIPE, PRESSURE GAUGE (CONTRACTOR'S
SUPPLIED) ETC. ALL COMPLETE AS PER DIRECTION OF THE EIC. | 1 | ITEM | 74,366 | ₹74,366 |
| 7 | TRIAL RUN OF THE PUMP FOR 30 HRS AND EXECUTING NECESSARY RECTIFICATION/ADUUSTMENT AS PER DIRECTION OF THE EIC. | 1 | ITEM | 4,120 | ₹4,120 |
| 200 | Estimated amount | - | - | - | - |
| 201 | Add: 9%SGST | - | LS | 13,091.41 | - |
| 202 | Add: 9%CGST | - | LS | 13,091.41 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
TBID.pdf
Tender Documents • 0.52 MB
BOQ_2554116.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .