Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.3 L+₹20,580.09 (9.91%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.4 L+₹27,760.59 (13.4%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.4 L+₹28,962.34 (13.9%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.6 L+₹47,619.63 (22.9%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
13 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Fencing of Primary School Baggain W.No. 6 Pyt Dhaman Block Duggan
2026_RDPR_319901_7
e-NIT No.175/REW/K of 2026-27 Dated 07/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
DUGGAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹6,000
5 Sept 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed in All Kind of soil =100% and 1 m from cutting Edge.Hard Rock 20% | 1.7 | Cum | 2,173 | ₹3,694.1 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed in All Kind of soil =100% and 1 m from cutting Edge.AKOS 80% | 6.8 | Cum | 479.3 | ₹3,259.24 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1cement:3 coarse sand:6 graded stone aggregate 20 mm nominal size) 20% plum boulder | 20.54 | Cum | 4,774.6 | ₹98,070.28 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1cement:2 coarse sand:4 graded stone aggregate 20 mm nominal size). | 3.33 | cum | 6,591.25 | ₹21,948.86 |
| 5 | Providing and Fixing GI chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2mm dia wire or nuts , bolts and washers as required. Complete as per the direction of Engineer incharge, Made of GI wire of dia 4mm, PVC Coated to achieve outer dia not less than 5mm in required shade and colour. | 55.76 | sqm | 852.05 | ₹47,510.31 |
| 6 | Structural steel in B/up x-section , all complete. Welded. | 467.19 | kg | 138.2 | ₹64,565.66 |
| 7 | Carriage of construction material Sand, Upto 95km by MT , 500M AT | 11.06 | Cum | - | - |
| 8 | Carriage of construction material Aggregates , Upto 95km by MT , 500M AT | 17.69 | Cum | - | - |
| 9 | Carriage of construction material Stones, Upto 500m by AT | 4.25 | Cum | 698.68 | ₹2,969.39 |
| 10 | CIB & Photos | 1 | No | 3,000 | ₹3,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_1061476.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .