Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.2 Laccepted-finance | ₹4.2 L | accepted-finance |
Tender Value
₹4.2 L
EMD Value
₹10,700
Closing Date
26 Mar 2026, 10:00 pmClosed
Public Works Department
Repairs to Road From BB-BT to Kyathanahalli-Haravu-Chaluvarasanakoppalu-Byatethimmanakoppalu road at Ch.0.94 km in Pandavapura Taluk.
PWD/2025-26/RD/WORK_INDENT34830
PWD/2025-26/RD/WORK_INDENT34830
Open
Roads
PWD Division Office Mandya
5 documents required · 5 mandatory
₹500
₹10,700
17 Mar 2026
17 Mar 2026
25 Mar 2026
Repairs to Road From BB-BT to Kyathanahalli-Haravu-Chaluvarasanakoppalu-Byatethimmanakoppalu road at Ch.0.94 km in Pandavapura Taluk.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Painting on concrete surface - Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and apply...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work. Ref to MoRT&H : IRC - 301 ---- All items in the tender include cost of hire ...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
FormWork for Box culverts -Add 20 Percentage on finished rate of concrete per m3 I,e, 20% of 6336 = 1245.40 ---- All items in the tender include cost of hire charges of machineries and equipments with...
FormWork for earth retaining structures -Add 10 Percentage on finished rate of concrete per m3 I,e, 10% of 6227 = 622.70 ---- All items in the tender include cost of hire charges of machineries and eq...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-1 - general New-2025-26-34830-Pvp.doc
Tender Document • 2.69 MB
General condition-Maintenance.pdf
Tender Document • 0.19 MB
Download all tender documents and submit your bid