Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L₹8.7 LAccepted-AOC NO 9 R C COMPLEX KUMBAKONAM SALAI PANRUTI TK | CUDDALORE | TAMIL NADU | 605007 | L | Accepted-AOC L1 | |
| 2 | L2₹10.2 LRejected-AOC SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S PRABHU SELVARAJ CONTRACTOR L2 | S P CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 130 | M3 | 32,500 ₹32,500 | 23,776 ₹23,776 Lowest |
| 2.00 | Plain cement concrete 1:4:8 mix ( One Part of Cement,Four Part of M- Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 22 | M3 | 1,29,800 ₹1,29,800 | 1,13,080 ₹1,13,080 Lowest |
| 3.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. TNDSS NO: 24 | 62 | M3 | 4,16,330 ₹4,16,330 | 4,03,945 ₹4,03,945 Lowest |
| 4.00 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 | 450 | M2 | 2,24,550 ₹2,24,550 | 2,06,051 ₹2,06,051 Lowest |
| 5.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one part of cement, two part of M-sand and four part of aggrigate) using 10 to 12mm stone chips – 25mm tk etc., including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. | 72 | M2 | 12,168 ₹12,168 | 11,383 ₹11,383 Lowest |
| 6.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 560 | Kg | 1,40,000 ₹1,40,000 | 50,277 ₹50,277 Lowest |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part of cement, one and half part M-sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 7 | M3 | 62,293 ₹62,293 | 62,083 ₹62,083 Lowest |
Tender Value
₹10.8 L
EMD Value
₹10,750
Closing Date
5 Dec 2024, 3:00 pmClosed
Executive Officer
Palayam Town Panchayat office Guziliamparai
Construction Drainage with culvert at 4th ward Muslim Street in Palayam Town Panchayat
2024_DTP_506238_1
729/2/2024/A1
Open Tender
Civil Works
Item Rate
Palayam TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,750
4 Oct 2025
2 Dec 2024
5 Dec 2024
2 Dec 2024
5 Dec 2024
2 Dec 2024
Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Plain cement concrete 1:4:8 mix ( One Part of Cement,Four Part of M- Sand and Eight Part of aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. TNDSS NO: 24
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one part of cement, two part of M-sand and four part of aggrigate) using 10 to 12mm stone chips – 25mm tk etc., including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Reinforced Cement Concrete 1:1½:3 Mix (One part of cement, one and half part M-sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.
S PRABHU SELVARAJ CONTRACTOR (BID ID -1201668)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .