| 1 | 2₹18.6 LAccepted-Finance | ₹18.6 L | 2 | Accepted-Finance less |
| 2 | 1₹18.8 LRejected-Finance | ₹18.8 L | 1 | Rejected-Finance more |
| Sl No | Description | Qty | Unit | A SAKTHIVEL H1 | D KARUNANITHI H2 |
|---|---|---|---|---|---|
| 1.00 | Valve Chamber :Construction of masonry valve chamber: Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum, Plain Cement Concrete 1:4:8 using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification, Brick work in CM 1:5(one cement & five sand) using ground moulded country bricks of size 8.75 inch X 4.25 inch X 2 3/4 inch standard specification including finishing, curing, etc., complete complying with standard specification - 100cft, Plastering with cement mortar (1:3) 12 mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309), RCC (M20) Precast Slab of 0.15m thickness using 20mm thick hard broken stone jelly and river sand excluding the cost of reinforcement grills and fabrication charges but including moulding, curing, finishing charges and fixing in position neatly complying with standard specification and as directed by the Departmental Engineer etc. complete-, Supply and Fixing of Cut Stone Slab all faces dressed including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification, CI surface box at a of size 100x125x150 mm conforming to IS 3950 having hinged and weighting not less than 33 kg.The surface box shall be fixed on top of the RCC cover slab during the casting of slab for key rod operation. The surface box shall be painted with 3 coats of black bitumastic paint, Refilling the trenches with suitable excavated earth available in layers of 150 mm thick, watering, ramming & consolidation complete as directed by the Engineer in charge,Conveyance of excess earth to a distance not exceeding 5km as directed by the Corporation Engineer including cost of loading, transportation and unloading charges etc complete (Total Earthwork Quantity - Refilling Quantity)Valve Chamber Size 1 m x 1.3 m x 1.5 m | 36 | Nos | 29,000 ₹10,44,000 | 28,748 ₹10,34,928 Lowest |
| 2.00 | Valve Chamber Size 1.2 m x 1.0 m x 1.2 m | 12 | Nos | 25,000 ₹3,00,000 | 24,716 ₹2,96,592 Lowest |
| 3.00 | Valve Chamber Size 1.6 m x 1.1 m x 1.4 m | 4 | Nos | 33,000 ₹1,32,000 | 32,571 ₹1,30,284 Lowest |
| 4.00 | Valve Chamber Size 1.8 m x 1.2 m x 1.6 m | 3 | Nos | 38,659 ₹1,15,977 Lowest | 38,659 ₹1,15,977 Lowest |
| 5.00 | GST 18% | 1 | Nos | 2,86,555 ₹2,86,555 | 2,84,000 ₹2,84,000 Lowest |
Tender Value
₹19.1 L
EMD Value
₹19,100
Closing Date
5 Feb 2026, 3:00 pmClosed
Commissioner Thiruvathipuram Municipality
Commissioner Thiruvathipuram Municipality
Construction of valve chamber at ward 1 to27 inThiruvathipuram Municipality
2026_MAWS_649606_1
1088/2025/E1-6
Open Tender
Civil Works - Water Works
Works
Thiruvathipuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,100
Yes
17 Mar 2026
31 Jan 2026
5 Feb 2026
31 Jan 2026
5 Feb 2026
31 Jan 2026
Valve Chamber :Construction of masonry valve chamber: Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum, Plain Cement Concrete 1:4:8 using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification, Brick work in CM 1:5(one cement & five sand) using ground moulded country bricks of size 8.75 inch X 4.25 inch X 2 3/4 inch standard specification including finishing, curing, etc., complete complying with standard specification - 100cft, Plastering with cement mortar (1:3) 12 mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309), RCC (M20) Precast Slab of 0.15m thickness using 20mm thick hard broken stone jelly and river sand excluding the cost of reinforcement grills and fabrication charges but including moulding, curing, finishing charges and fixing in position neatly complying with standard specification and as directed by the Departmental Engineer etc. complete-, Supply and Fixing of Cut Stone Slab all faces dressed including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification, CI surface box at a of size 100x125x150 mm conforming to IS 3950 having hinged and weighting not less than 33 kg.The surface box shall be fixed on top of the RCC cover slab during the casting of slab for key rod operation. The surface box shall be painted with 3 coats of black bitumastic paint, Refilling the trenches with suitable excavated earth available in layers of 150 mm thick, watering, ramming & consolidation complete as directed by the Engineer in charge,Conveyance of excess earth to a distance not exceeding 5km as directed by the Corporation Engineer including cost of loading, transportation and unloading charges etc complete (Total Earthwork Quantity - Refilling Quantity)Valve Chamber Size 1 m x 1.3 m x 1.5 m
Valve Chamber Size 1.2 m x 1.0 m x 1.2 m
Valve Chamber Size 1.6 m x 1.1 m x 1.4 m
Valve Chamber Size 1.8 m x 1.2 m x 1.6 m
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_778799.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].