Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Finance | -6.70% | ₹8.9 L | L1 | Admitted-Finance |
| 2 | L2₹9.0 LAdmitted-Finance | -5.10% | ₹9.0 L | L2 | Admitted-Finance |
| 3 | L3₹9.3 LAdmitted-Finance | -2.65% | ₹9.3 L | L3 | Admitted-Finance |
| 4 | L4₹11.4 LAdmitted-Finance | +20.00% | ₹11.4 L | L4 | Admitted-Finance |
| 5 | L5₹12.2 LAdmitted-Finance | +28.00% | ₹12.2 L | L5 | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹19,068
Closing Date
19 May 2026, 3:00 pmClosed
EE, MID, APWD, Hut Bay
EE, MID, APWD, Hut Bay
Installation of Open Air Gym equipments at Chidambaram Park Hut Bay, Little Andaman under MPLADs
2026_APWD_22982_1
NIT No.05/DB/MID/2026-27
Open Tender
Civil Works - Others
180 days
Hut Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹19,068
19 May 2026
11 May 2026
19 May 2026
11 May 2026
19 May 2026
11 May 2026
11 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), ncluding dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 1.1 | All kinds of soil. | 5.6 | cum | 335 | ₹1,876 | 1 |
| 2Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | ||||||
| 2.1 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.8 | cum | 21,976.85 | ₹61,535.18 | 2 |
| 2.2 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.8 | cum | 18,879.6 | ₹15,103.68 | 3 |
| 3Centering and shuttering including strutting, propping etc. and removal of form for | ||||||
| 3.1 | Foundations, footings, bases of columns, etc. for mass concrete | 5.6 | sqm | 415.2 | ₹2,325.12 | 4 |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 152.1 | kg | 128.7 | ₹19,575.27 | 5 |
| 5 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 34.5 | kg | 99.55 | ₹3,434.48 | 6 |
| 612 mm cement plaster of mix: | ||||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
NIT05.pdf
Tender Documents • 8.46 MB
ITB.pdf
Other Documents • 0.33 MB
BOQ_24355.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid