| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC LER |
| 2 | L2₹5.3 LRejected-Finance | ₹5.3 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Kannan Construction L1 | GAJENDIRA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00NAME OF WORK :DETAILED PROJECT REPORT FOR THE WORK OF STRENGTHENING OF ROAD FROM PEIRYAKILAMBADI TO MASHAR ROAD KM 0/0 – 1/1700 IN PERIYAKILAMPADI PANCHAYAT AT THURINJAPURAM BLOCK OF THIRUVANNAMALAI DISTRICT. (R160) | |||||
| 1.01Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 1.02 | Km.0/0 - 0/1700m | 612 | M2 | 5.15 ₹3,151.80 | 5.15 ₹3,151.80 |
| 1.03Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.04 | Km.0/0 - 0/1700m | 80.53 | M3 | 1,868 ₹1.5 L | 1,868 ₹1.5 L |
| 1.05Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | |||||
| 1.06 | Km.0/0 - 0/1700m | 805 | M2 | 74.45 ₹59,932.25 | 95 ₹76,475 |
| 1.07Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg / 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | |||||
| 1.08 | Km.0/0 - 0/1700m | 805 | M2 | 17.4 ₹14,007 | 17.4 ₹14,007 |
| 1.09Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete | |||||
Tender Value
₹5.4 L
EMD Value
₹5,400
Closing Date
7 Jul 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT) THURINJAPURAM
BLOCK DEVELOPMENT OFFICE THURINJAPURAM
DETAILED PROJECT REPORT FOR THE WORK OF STRENGTHENING OF ROAD FROM PEIRYAKILAMBADI TO MASHAR ROAD KM 0/0 1/1700 IN PERIYAKILAMPADI PANCHAYAT AT THURINJAPURAM BLOCK OF THIRUVANNAMALAI DISTRICT. (R160)
2023_RDTN_334108_1
Roc.No 496/2023/A3DATE .04.2023
Open Tender
Civil Works - Roads
90 days
THURINJAPURAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,400
Yes
5 Mar 2026
1 Jul 2023
7 Jul 2023
1 Jul 2023
7 Jul 2023
1 Jul 2023
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg / 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete
Providing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GAJENDIRA CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid