| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC DOOR NO 43 2 BESIDES VIZAG DEFENCE ACADEMY 104 AREA KAPPARADA VISAKHAPATNAM 530013 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530013 | ₹2.7 Cr Quoted ₹2.8 Cr | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹2.8 Cr+₹2.9 L (1.03%)Rejected-AOC | ₹2.8 Cr+₹2.9 L (1.03%) | L2 | Rejected-AOC NOT BEING L1 |
| 3 | L3₹2.9 Cr+₹9.5 L (3.43%)Rejected-AOC | ₹2.9 Cr+₹9.5 L (3.43%) | L3 | Rejected-AOC NOT BEING L1 |
| 4 | L4₹3.1 Cr+₹31.0 L (11.1%)Rejected-AOC SECUNDERABAD | WARANGAL | TELANGANA | 506350 | ₹3.1 Cr+₹31.0 L (11.1%) | L4 | Rejected-AOC NOT BEING L1 |
| 5 | L5₹3.2 Cr+₹46.7 L (16.8%)Rejected-AOC 39 40 DASHMESH MARKET CIVIL GURUDWARA LINE PORT BLAIR 744 101 | PORT BLAIR | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹3.2 Cr+₹46.7 L (16.8%) | L5 | Rejected-AOC NOT BEING L1 |
| Sl No | Description | Qty | Unit | STANDARD AGENCIES L5 | Mavee Syndicate L1 | SAI RUPA CONSTRUCTIONS L4 | Sri Associates L3 | Saiansh Associates L2 |
|---|---|---|---|---|---|---|---|---|
| .50SCHEDULE 'A' PART - I (B/R Portion) | ||||||||
| 1.00 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 64.53 | Cubic metre | 333 ₹21,488.49 | 500 ₹32,265 | 720 ₹46,461.6 | 300 ₹19,359 Lowest | 400 ₹25,812 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 1,144 | Square metre | 39 ₹44,616 | 50 ₹57,200 | 63 ₹72,072 | 25 ₹28,600 Lowest | 50 ₹57,200 |
| 3.00 | Dismantling of stone slabs of any description or thickness in floors and aprons etc, laid, bedded and pointed in any mortar complete all as specified and as directed. | 7.75 | Ten Square metre | 480 ₹3,720 | 500 ₹3,875 | 450 ₹3,487.5 | 250 ₹1,937.5 | 200 ₹1,550 Lowest |
| 4.00 | Dismantling of existing PVC 500-1000 ltrs water tank complete and removing to store complete all as specified and as directed. | 20 | Each | 300 ₹6,000 | 300 ₹6,000 | 450 ₹9,000 | 500 ₹10,000 | 100 ₹2,000 Lowest |
| 5.00 | Material and labour for Demolition of Brickwork or stone/ boulder masonry, built in cement mortar, manholes including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed. | 14.49 | Cubic metre | 330 ₹4,781.7 | 500 ₹7,245 | 630 ₹9,128.7 | 300 ₹4,347 Lowest | 400 ₹5,796 |
| 6.00 | Demolition and breaking up drain pipes (salt glazed stone ware) set in cement mortar of internal dia of pipe 150 mm and disposing of broken pipes complete all as specified and as directed. | 100 | Running Metre | 15 ₹1,500 | 100 ₹10,000 | 18 ₹1,800 | 9 ₹900 | 5 ₹500 Lowest |
| 7.00 | All as per item No. 6 above but of size 200 mm dia. | 50 | Running Metre | 19 ₹950 | 110 ₹5,500 | 27 ₹1,350 | 9 ₹450 | 5 ₹250 Lowest |
| 8.00 | Taking down any type of Chowkhats or frames with shutters of size not exceeding 1.5 sqm without taking off shutters from the frame complete all as specified and as directed. | 454 | Each | 160 ₹72,640 | 100 ₹45,400 | 180 ₹81,720 | 90 ₹40,860 | 80 ₹36,320 Lowest |
| 9.00 | Taking down any type of Chowkhats or frames with shutters of size exceeding 1.5 sqm but not exceeding 4 sqm each without taking off shutters from the frame complete all as specified and as directed. | 330 | Each | 180 ₹59,400 | 100 ₹33,000 | 225 ₹74,250 | 90 ₹29,700 Lowest | 100 ₹33,000 |
Tender Value
₹3.3 Cr
EMD Value
₹4.0 L
Closing Date
12 Mar 2026, 6:00 pmClosed
CE(AF) Bangalore
HQ CE (AF) Bangalore
Special repair to Cadets trainee officers accommodation Ahuja block Pundir Block at AFS Hakimpet
2026_MES_750407_2
801697/AF/E8
Open Tender
Civil Works
Item Rate
Hakimpet
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
Yes
₹4.0 L
Yes
13 May 2026
27 Feb 2026
19 Mar 2026
27 Feb 2026
12 Mar 2026
5 Mar 2026
28 Feb 2026 - 3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.5 | SCHEDULE 'A' PART - I (B/R Portion) | - | - | - | - |
| 1 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 64.53 | Cubic metre | - | - |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 1,144 | Square metre | - | - |
| 3 | Dismantling of stone slabs of any description or thickness in floors and aprons etc, laid, bedded and pointed in any mortar complete all as specified and as directed. | 7.75 | Ten Square metre | - | - |
| 4 | Dismantling of existing PVC 500-1000 ltrs water tank complete and removing to store complete all as specified and as directed. | 20 | Each | - | - |
| 5 | Material and labour for Demolition of Brickwork or stone/ boulder masonry, built in cement mortar, manholes including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed. | 14.49 | Cubic metre | - | - |
| 6 | Demolition and breaking up drain pipes (salt glazed stone ware) set in cement mortar of internal dia of pipe 150 mm and disposing of broken pipes complete all as specified and as directed. | 100 | Running Metre | - | - |
| 7 | All as per item No. 6 above but of size 200 mm dia. | 50 | Running Metre | - | - |
| 8 | Taking down any type of Chowkhats or frames with shutters of size not exceeding 1.5 sqm without taking off shutters from the frame complete all as specified and as directed. | 454 | Each | - | - |
| 9 | Taking down any type of Chowkhats or frames with shutters of size exceeding 1.5 sqm but not exceeding 4 sqm each without taking off shutters from the frame complete all as specified and as directed. | 330 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
801697TENDER.pdf
Tender Documents • 2.47 MB
BOQ_845212.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .