| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | IST₹11.4 LAccepted-AOC CIRCULAR ROAD PATHANKOT 145001 | PATHANKOT | PUNJAB | 145001 | ₹11.4 L | IST | Accepted-AOC IST RANK |
| 2 | 2ND₹13.9 LRejected-AOC | ₹13.9 L | 2ND | Rejected-AOC 2ND RANK |
| Sl No | Description | Qty | Unit | J.S Irrigation L1 | Oasis Farm Solutions L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation by Mechanical Means (JCB or Hydraulic excavator in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade,cutting ,joint holes,refilling consolidation,including the cost of diversion for treaffic,crossing over trenches for access to the houses watching ,fencing etc and removal of surplus soil out side/inside the town involving lead upto 15 meter complete all respect. | 1,859.68 | Cum | 99 ₹1.8 L | 105 ₹2.0 L |
| 2.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 107.55 | Cum | 196 ₹21,079.80 | 210 ₹22,585.50 |
| 3.00 | First class brick laid in cement sand mortar 1.6 in foundation and plinth. . | 61.12 | Cum | 7,750 ₹4.7 L | 8,200 ₹5.0 L |
| 4.00 | 10mm thick cement plaster 1.4 on sides walls | 174.91 | Sqm | 185 ₹32,358.35 | 195 ₹34,107.45 |
| 5.00 | 10mm thick cement plaster 1:4 on floor | 37.9 | Sqm | 155 ₹5,874.50 | 142 ₹5,381.80 |
| 6.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 2.05 | cum | 9,850 ₹20,192.50 | 9,800 ₹20,090 |
| 7.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 11.82 | Cum | 5,650 ₹66,783 | 5,945 ₹70,269.90 |
| 8.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 18.09 | Cum | 4,750 ₹85,927.50 | 4,755 ₹86,017.95 |
| 9.00 | Laying and jointing of UPVC pipe 250 mm dia of 2.5 kg/ sq cm pressure ISI Marked UPVC Pipes as per ISI- 4985 along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointingand testing complete as per specifications. " | 1,572.69 | Metre | 54.5 ₹85,711.61 | 68 ₹1.1 L |
| 10.00 | Proving Laying fixing,testing and commissioning of class heavy duty MS pipe
confoming to indianstandard IS:1239/3589 including fitings lik tees,bends ,sockets, elbows, flanges,tapers,nutsbolts, gaskets etc,fixing the pipe on
the wall/celing with suitable clamp sandpainting with two or more coats of synthetice paint of required shade complete in all respects.(d) 50mm internal diameter | 5.25 | Metre | 696 ₹3,654 | 700 ₹3,675 |
Updated dates
Tender Value
₹10.5 L
EMD Value
₹20,929
Closing Date
9 Apr 2026, 12:00 pmClosed
Xen Gurdaspur UBDC
Executive Engineer/Gurdaspur Canal and Ground Water Division WRD,Punjab,Gurdaspur
Estimate for Laying UPVC U/G Pipe line for outlet RD 21225/L of Nanonanagal Disty under jurisdiction of Tibri Sub division
2026_WR_157484_3
56/110A
Open Tender
Civil Works - Canal
90 days
GURDASPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹20,929
7 May 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation by Mechanical Means (JCB or Hydraulic excavator in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade,cutting ,joint holes,refilling consolidation,including the cost of diversion for treaffic,crossing over trenches for access to the houses watching ,fencing etc and removal of surplus soil out side/inside the town involving lead upto 15 meter complete all respect. | - | Cum | - | - | Item 1 |
| 2 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | - | - | Item 2 |
| 3 | First class brick laid in cement sand mortar 1.6 in foundation and plinth. . | 1 | Cum | - | - | Item 3 |
| 4 | 10mm thick cement plaster 1.4 on sides walls | 1 | Sqm | - | - | Item 4 |
| 5 | 10mm thick cement plaster 1:4 on floor | 1 | Sqm | - | - | Item 5 |
| 6 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | cum | - | - | Item 6 |
| 7 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | - | Cum | - | - | Item 7 |
| 8 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | - | - | Item 8 |
| 9 | Laying and jointing of UPVC pipe 250 mm dia of 2.5 kg/ sq cm pressure ISI Marked UPVC Pipes as per ISI- 4985 along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointingand testing complete as per specifications. " | - | Metre | - | - | Item 9 |
| 10 | Proving Laying fixing,testing and commissioning of class heavy duty MS pipe
confoming to indianstandard IS:1239/3589 including fitings lik tees,bends ,sockets, elbows, flanges,tapers,nutsbolts, gaskets etc,fixing the pipe on
the wall/celing with suitable clamp sandpainting with two or more coats of synthetice paint of required shade complete in all respects.(d) 50mm internal diameter | - | Metre | - | - | Item 10 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_335076.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid