| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC PEER TAKIYA KOKERNAG ANANTNAG | ANANTNAG | JAMMU AND KASHMIR | 192101 | ₹4.7 Cr Quoted ₹4.0 Cr | L1 | Accepted-AOC NTP Issued |
| 2 | L2₹4.0 Cr+₹7.4 L (1.86%)Rejected-Finance KHANDAY PLANT NH 44 NIPORA DISTRICT ANANTNAG JAMMU KASHMIR UT INDIA 192102 PH NO 91 7006355099 | ₹4.0 Cr+₹7.4 L (1.86%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.5 Cr+₹49.8 L (12.6%)Rejected-Finance | ₹4.5 Cr+₹49.8 L (12.6%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹5.9 Cr
EMD Value
₹11.7 L
Closing Date
10 Jun 2026, 4:30 pmClosed
Office of Superintending Engg, Pmgsy Circle Sgr
Office of Superintending Engg, Pmgsy Circle Srinagar, Ground Floor Engineering Complex, Rajbagh
Refer to BOQ
2026_KSRRD_147703_1
JK014016
Open Tender
CIVIL
Percentage
549 days
Sagam Anantnag
Refer to Technical Bid / SBD
21 documents required · 21 mandatory
₹10,000
₹11.7 L
Yes
Office of Superintending Engg, Pmgsy Circle Sgr
22 Jul 2026
18 May 2026
11 Jun 2026
19 May 2026
10 Jun 2026
26 May 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part "A" Site Clearance | - | - | - | - |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.Lead upto 100 M | - | - | - | - |
| 3 | 300 to 600mm | 26 | No. | 426.38 | ₹11,085.88 |
| 4 | 600-900mm | 22 | No. | 693.9 | ₹15,265.8 |
| 5 | 900to 1800mm | 14 | No. | 1,445.4 | ₹20,235.6 |
| 6 | Part "B" Earthwork | - | - | - | - |
| 7 | Excavation in Soil in hilly areas by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5m and a lead upto 20m as per technical specification clause 1603.1. | 3,734.64 | Cum | 165.81 | ₹6,19,240.66 |
| 8 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5(Item No 3.3 Page No 9 of SOR ) | 3,454.15 | Cum | 75.32 | ₹2,60,166.58 |
| 9 | Constructio of embankment with approved material obtained from borrow pits with a lift upto 1.50 m, transporting to site, spreadind, grading to required slope and compacting to meet the requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Soecifications Clause 301.5 | 1,651.51 | Cum | 363.6 | ₹6,00,489.04 |
| 10 | Part "C" PCC Protection Work | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.67 MB
BOQ_230533.xls
BOQ • 0.45 MB
BidData.pdf
Additional Documents • 0.65 MB
Jk014016a.pdf
Tender Documents • 1.98 MB
extensionNIT3.pdf
PDF • 0.12 MB
Corrigendum.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .