Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.0 Cr+₹23.2 L (6.15%)Admitted-Finance | ₹4.0 Cr+₹23.2 L (6.15%) | L2 | Admitted-Finance |
| 3 | L3₹4.9 Cr+₹1.2 Cr (31.1%)Admitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹4.9 Cr+₹1.2 Cr (31.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIVAM ENTERPRISES L3 | Rama Power construction L1 | Jyoti Engineering Works L2 |
|---|---|---|---|---|---|---|
| 1.00 | (Supply) Supply of 220 KV D/C Tower Including Stub extension, Gantry and Stub setting template for above structure as per drawing. (A) Tower | 5.84 | MT | 97,000 ₹5,66,480 | 90,000 ₹5,25,600 | 85,000 ₹4,96,400 Lowest |
| 2.00 | Hot Dip Galvanized hexagon round head transmission tower Nut Bolt and Washer. | 0.31 | MT | 1,20,000 ₹37,200 | 1,10,000 ₹34,100 | 95,000 ₹29,450 Lowest |
| 3.00 | Tower Accessories. (A) Number Plate | 119 | Nos. | 200 ₹23,800 Lowest | 220 ₹26,180 | 250 ₹29,750 |
| 4.00 | (B) Phase Plate | 238 | Nos. | 200 ₹47,600 Lowest | 250 ₹59,500 | 300 ₹71,400 |
| 5.00 | (C) Danger Plate | 119 | Nos. | 200 ₹23,800 Lowest | 260 ₹30,940 | 300 ₹35,700 |
| 6.00 | 70 KN Disc Insulator | 4,497 | Nos. | 626 ₹28,15,122 | 405 ₹18,21,285 Lowest | 475 ₹21,36,075 |
| 7.00 | 160 KN Disc Insulator | 15,126 | Nos. | 1,050 ₹1,58,82,300 | 680 ₹1,02,85,680 | 603 ₹91,20,978 Lowest |
| 8.00 | Hardware Suitable for ACSR Zebra Conductor. (A) Single Tension Fitting. | 539 | Nos. | 2,850 ₹15,36,150 | 2,050 ₹11,04,950 Lowest | 2,500 ₹13,47,500 |
| 9.00 | (B) Single Suspension Fitting. | 161 | Nos. | 1,600 ₹2,57,600 | 1,050 ₹1,69,050 Lowest | 1,460 ₹2,35,060 |
| 10.00 | (C) Double Tension Fitting. | 101 | Nos. | 5,750 ₹5,80,750 | 4,200 ₹4,24,200 Lowest | 4,500 ₹4,54,500 |
Tender Value
₹4.4 Cr
EMD Value
₹5.3 L
Closing Date
21 Mar 2023, 12:00 pmClosed
SE ETC UPPTCL GREATER NOIDA
400 KV SUB STATION PALI GAUTAM BUDH NAGAR GREATER NOIDA
FOR CONSTRUCTION OF BALANCE WORK OF 220 KV D/C SIKANDRABAD (400 KV) - IITGNL (220 KV) TRANSMISSION LINE ON DEBITABLE BASIS UNDER ELECTRICITY 400 KV SUB STATION DIVISION GREATER NOIDA
2023_UPTCL_766539_2
T-45/2022-23ETC/GN
Open Tender
Electrical Works
Item Rate
120 days
GREATER NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
EE ELECTRICITY 400 KV SUB STATION GREATER NOIDA
₹5.3 L
3 Apr 2023
6 Mar 2023
21 Mar 2023
6 Mar 2023
21 Mar 2023
6 Mar 2023
Amount
(Supply) Supply of 220 KV D/C Tower Including Stub extension, Gantry and Stub setting template for above structure as per drawing. (A) Tower
Hot Dip Galvanized hexagon round head transmission tower Nut Bolt and Washer.
Tower Accessories. (A) Number Plate
(B) Phase Plate
(C) Danger Plate
70 KN Disc Insulator
160 KN Disc Insulator
Hardware Suitable for ACSR Zebra Conductor. (A) Single Tension Fitting.
(B) Single Suspension Fitting.
(C) Double Tension Fitting.
(D) Vibration Damper.
(E) Mid Span Compressor Joint.
(F) Repair Sleeve.
(G) PA Rod.
24 Fiber OPGW. 24 Fiber (DWSM) OPGW Fiber optic cable.
Supply and installation of Hardware set for 24 F OPGW.
Joint Box 24 Fiber
FODP 48 Fiber
Supply and Installation of hardware set for 48 F (DWSM G652 D) fiber optic approach cable.
(Work) Survey including preparation of schedule of material, marking of locations, GPS Survey of line with coordinate of each tower.
Cost of excavation of 220 KV D/C Tower Foundation pits including all earth work, back filling. Dewatering and levelling etc.
Setting of stubs including all foundation work but excluding the cost of concreting and Reinforcement. A type.
B type.
C type.
Cost of concreting for all type of 220 KV D/C Tower foundation including the cost of cement, Shuttering, shorting but excluding the cost of Reinforcement. (A) M10
Erection of superstructure of tower and their extension weather required including all work above ground level but excluding hosting of insulator, Hardware and accessories but including fixing of number plate, phase plate, danger plate etc.
Tack Welding of all the bolt upto the height of 5 meter or first section of tower whichever is higher with three tacks of 120 degree separation of minimum 10 mm thickness with 10/12 mm electrode and application of zinc rich Al paint.
Laying, Stringing, Tensioning, Clamping and Jointing of ACSR Zebra Conductor including hosting of insulator fitting of all necessary hardware and accessories.
Laying, Stringing, Tensioning, Clamping and Jointing and Fitting of all necessary accessories of OPGW and of AC Termination at S/S End.
Grounding work including earth work etc for pipetype grouding material including cost of coke and salt.
Installation of steel reinforcement bar in RCC foundation including cost of steel reinforcement bars with cutting bending and placing them in foundation pits.
Jyoti Engineering Works
SHIVAM ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
T45.pdf
Tender Documents • 1.41 MB
BOQ_1298379.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .