Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹17.3 L
EMD Value
₹17,250
Closing Date
21 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
BDO BP
BDO,Gummidipoondi
CONSTRUCTION OF ANGANWADI IN PUDUPALAYAM IN PUDUPALAYAM PANCHAYAT
2026_RDTN_711135_1
RC/947/2026/A2
Open Tender
Civil Works - Buildings
Item Rate
BDO, Gummidipoondi
REFER TENDER DOCUEMNTS
5 documents required · 5 mandatory
₹0
₹17,250
Yes
6 Oct 2026
6 Oct 2026
21 Oct 2026
6 Oct 2026
21 Oct 2026
6 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | CONSTRUCTION OF ANGANWADI BUILDING IN PUDUPALAYAM IN PUDUPALAYAM PANCHAYAT | - | - | - | - |
| 3 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. | 44.34 | CUM | 263.78 | ₹11,696.01 |
| 4 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc., complete as per standard specification. | 6.09 | CUM | 6,093.6 | ₹37,110.02 |
| 5 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification. | 10.03 | CUM | 6,278.14 | ₹62,969.74 |
| 6 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification. | 23.19 | CUM | 6,371.01 | ₹1,47,743.72 |
| 7 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc., complete as per standard specification. | 9.78 | CUM | 9,860.76 | ₹96,438.23 |
| 8 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc., complete as per standard specification. | 13.54 | CUM | 10,001.83 | ₹1,35,424.78 |
| 9 | Supplying and erecting for sides & soffits including supports and strutting for plane surface in all floors including cost and conveyance and all labour charges etc., complete as per standard specification.up to basemnet | 55.61 | SQM | 547.5 | ₹30,446.48 |
| 10 | Supplying and erecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc., complete as per standard specification.above Basement | 129.94 | SQM | 1,095 | ₹1,42,284.3 |
| 11 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc., complete as per standard specification. | 1.9 | MT | 92,027.62 | ₹1,74,852.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
PriceBid.pdf
Additional Documents • 0.40 MB
TechBid.pdf
Tender Documents • 0.83 MB
BOQ_854364.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .