| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹7.5 L+₹10,679 (1.45%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical HOUSE NO 5 1 JALALIPATTI VARANASI BHULLANPUR VARANASI VARANASI UTTAR PRADESH 221108 | VARANASI | UTTAR PRADESH | 221108 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | JMC Enterprises L2 | KARTIKAY CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 0.00The work of Instalation of New Pole To Reduce Long Span, Straightening of tilted poles, Replacement of Damage & Jarjar Conductor/Pin Insulator/Clamp/X-Arm/Pole of 33 KV Line on 11 Mtr. Long ST Poles with ACSR Dog conductor for Strengthning of 33 KV Jaspura/Beera/Pakharauli Line, Place At ''33 KV Line from Rehuta to Jaspura, Near Nahar Patti 33 KV Line from Murwal to Pakharauli'' under BUSINESS PLAN SCHEME 2025-26 under EDD Banda, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | |||||
| 1.00Supply of following materials :- | |||||
| 1.01 | M.S. T-off Channel as per RESSPO manual. | 12 | No. | 1,416 ₹16,992 | 118 ₹1,416 Lowest |
| 1.02 | Channel Clamp with N/B as per RESSPO manual. | 12 | No. | 531 ₹6,372 | 59 ₹708 Lowest |
| 1.03 | 33 KV Cross arm holding clamp as per RESSPO manual. | 57 | No. | 413 ₹23,541 | 59 ₹3,363 Lowest |
| 1.04 | 33 KV F-Clamp as per RESSPO manual. | 53 | No. | 413 ₹21,889 | 59 ₹3,127 Lowest |
| 1.05 | Alluminium Jointing Sleeves as per RESSPO manual. | 24 | No. | 531 ₹12,744 | 59 ₹1,416 Lowest |
| 1.06 | Alluminium Paint as per RESSPO manual. | 57 | Ltr. | 649 ₹36,993 | 59 ₹3,363 Lowest |
| 1.07 | Red Oxide Paint as per RESSPO manual. | 57 | Ltr. | 531 ₹30,267 | 59 ₹3,363 Lowest |
| 1.08 | Number Plate with N/B as per RESSPO manual. | 44 | No. | 413 ₹18,172 | 59 ₹2,596 Lowest |
Tender Value
₹7.5 L
EMD Value
₹8,000
Closing Date
29 Sept 2025, 3:00 pmClosed
SE, EDC, BANDA
Chilla Road, Indira Nagar, Banda
The work of 33 KV Line Augmentation under EDD, Banda-Rural (Business Plan 2025-26)
2025_DVVNL_1070239_1
EDCBNDA-16/2025-26
Open Tender
Electrical Works
Item Rate
180 days
Banda
As per annexured
2 documents required · 2 mandatory
₹1,180
DVVNL
₹8,000
SE, EDC, BANDA
13 Jan 2026
1 Sept 2025
29 Sept 2025
1 Sept 2025
29 Sept 2025
1 Sept 2025
25 Sept 2025
The work of Instalation of New Pole To Reduce Long Span, Straightening of tilted poles, Replacement of Damage & Jarjar Conductor/Pin Insulator/Clamp/X-Arm/Pole of 33 KV Line on 11 Mtr. Long ST Poles with ACSR Dog conductor for Strengthning of 33 KV Jaspura/Beera/Pakharauli Line, Place At ''33 KV Line from Rehuta to Jaspura, Near Nahar Patti 33 KV Line from Murwal to Pakharauli'' under BUSINESS PLAN SCHEME 2025-26 under EDD Banda, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;-
Supply of following materials :-
M.S. T-off Channel as per RESSPO manual.
Channel Clamp with N/B as per RESSPO manual.
33 KV Cross arm holding clamp as per RESSPO manual.
33 KV F-Clamp as per RESSPO manual.
Alluminium Jointing Sleeves as per RESSPO manual.
Alluminium Paint as per RESSPO manual.
Red Oxide Paint as per RESSPO manual.
Number Plate with N/B as per RESSPO manual.
Nut/Bolts with warsher of all sizes as per RESSPO manual.
Danger Board with clamp & N/B as per RESSPO manual.
Erection/Instalation/Fixing of following :-
Safe cartage of 11 Mtr. long ST poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.
Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of its dragging.
Erection of single support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge.
Grouting of single support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each).
Erection and grouting of stay set with nozelling & binding as per norms.
Fixing of earthing rod as per RESSPO manual.
Laying, sagging, stringing, binding and jumpering etc. of ACSR Dog Conductor on the newly/old erected pole as per direction of supervising engineer/RESSPO manual due to replacement of old and damage/jarjar conductor.
Painting of ST poles as single/double poles structure with Alluminium Paint as per RESSPO manual.
Painting of ST poles as single/double poles structure with Red Oxide Paint as per RESSPO manual.
Fixing of T-off Channel with all accessories as per RESSPO manual.
Fixing of Number Plate with all accessories as per RESSPO manual.
Fixing of Danger Board with all accessories as per RESSPO manual.
Fixing of Alluminium Jointing Sleeves with all accessories as per RESSPO manual.
Resagging of loose conductor of 33 KV Lines at various places.
Straightening of tilted support as PCC/ST Pole at various places
Replacement of damaged/misplace "V" Type Cross Arm 33 KV
Replacement of damaged/misplace pin insulator with pin 33 KV
Chopping of Tree Branches coming in the vicinity of the lines during the execution of above work (One Job means one site of work).
Note: Any quantity of item from sl no. 1.00 to sl no. 2.18 may vary to any limit within the financial value of agreement against this tender.
JMC Enterprises (BID ID -5569096)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .