Tender Value
₹4.6 Cr
EMD Value
₹3.8 L
Closing Date
3 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
With the submission of the certificate/affidavit as mentioned, the practice of verification of tenderer's documents by the Railway dispensed with. Instruction for bidders, in this regards are:
Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification of lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit (EMD),Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 (five) years.
With such a system of self-certification of credentials, tender finalization should also be speeded up. The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender.
144 conditions · 1 needing a document upload
Any payment required for E-Tendering is accepted through Net Banking or Payment Gateway only.
Credentials in support of fulfillment of eligibility criteria ( Without these documents the offer is liable to be rejected) as per details stipulated in Tender documents. Each and every pages of the supporting documents should be signed with proper seal and date.
Details of technical personnel with qualification and experience employed by the firm.
Details of special equipments , tools and plants, machinery etc available with the firm for execution of contract works.
If working through contract labour , the contractor must resgister with Labour Commissioner and necessary license to be submitted with tender or to be produced before signing of contract agreement.
Partnership deed, if any, constitution of the firm and copies of power of attorney and other connected legal documents to be submitted.
Submission of requisite information for Financial Eligibility criteria as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All required documents duly attested as per Para 14.0 of IRGCC must be submitted.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Execution of Signaling & Telecommunication work in connection with: (1) Construction of RUB at Manned Level crossing No. RV-6 (Shankar Nagar Gate) at Km 4/10-11 in Raipur-Lakholi section, (2) Construction of RUB in lieu of LC RV-7 between RVH-MNDH of Raipur-Titlagarh section of Raipur Division, (3) Construction of RUB (Twin Box) on Km. 827/3-5 in lieu of LC No. 417 (Khamtarai Gate) across NGP-HWH main line (4) Construction of RUB in lieu of Non LC trespassing location on workshop road at Km RSD/31-32 between URK-RSD station of Raipur Division, (5) Overage Asset Replacement of Signalling Items [Point Machine & LED Signal] over Raipur Division, SECR, (6) Provision for Upgradation of War Room at Raipur Division of SECR, (7) Provision of voice recording facility of Conversation made by Station Master on Driver/Guard communication channel through VHF over Raipur Division.
SNT-R-2026-03~SECR
SNT-R-2026-03
Open
Works - General
9 Months
Raipur, Chhattisgarh
₹0
₹3.8 L
3 Mar 2026
4 Feb 2026
17 Feb 2026
137 items across 3 schedules · ₹4,61,66,159.41 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trench Depth 1.0 Mtr. & width 0.3 Mtr andclearing of roots of trees, bushes, ballast andreconditioning etc., including bailing out water and disposal of extra soil in all soils including soft rocky area. | Kilometre | 2.00 | 76,590 | 1,53,180 |
| 2 | Excavation of trench in all kinds of soils including soft rockyarea and clearing of roots of trees, bushes, rocks, ballastetc., to a depth of 1 Mtr. & width 0.3M for track/pucca road/Platform crossing/ level crossing and any other place asadvised by the Engineer- incharge including supply,transportation and laying of RCC pipe with collars (forjointing pipe) 150mm nominal dia to Spec.No:IS-458 intrench and drawing of Signalling/ Power/ Quad cablesthrough pipe including back filling and ramming after cablelaying as specified in Technical Circular No.2 of 1988issued by CSTE/S.E.Rly. This includes repairing andplastering of platform/pucca road after cable laying. RCCpipe shall be inspected by the Rep.of Sr. DSTE /R beforelaying. NOTE:- Power cable,signalling cable, Quad cable asmentioned above,where required shall be laid in the same trench as signalling cable but in a separate pipe. | Metre | 170.00 | 775 | 1,31,750 |
| 3 | Laying and Fixing of galvanised iron pipe (GI Pipe) with threadedcollars (for jointing pipe) of 80 mm nominal dia Spec.No.IS-1239medium grade, on bridges, culverts, drains including supply andtransportation of GI pipes and all other materials required forfixing the pipe to Drg.No.Con/SK/T/2 and drawing ofSignal/Power/Quad cables inside the pipe with masonary worksover the entire length of the bridge and at entry and exit of theculvert and curing for 72 hrs, drilling of holes on the pipe at 10 cmapart to be clamped 2 Mtrs apart on culvert, for the Signalling,quad, power cable. | Metre | 270.00 | 761 | 2,05,470 |
| 4 | Excavation of trench and clearing of roots of trees, bushes, ballastand reconditioning etc., including bailing out water and disposal ofextra soil in Hard rocky area including concreting. Chase cuttingand smoothening of inside surface of sizes 0.08 m deep and 0.17m width at platform and cemented floor area. | Metre | 40.00 | 115 | 4,600 |
| 5 | Excavation of trenches including clearing of roots of treesetc. in hard rocky soil by chiseling up to a depth of 0.5m to0.8 Mtr. At the bottom, supply and placing half round RCCpipe on sieved soil of 30 mm over cable and concretingthroughout the lenght upto a layerof 75 mm approximately(1:2:4) , as advised by the site engineer & Guide lines onSignalling cable Laying issued by Signal DirectorateResearch,Design & Standards organisation Ministry ofRailways Manak Nagar Lucknow- 226011,Version-1.0,Effective from dt 31.10.2011 . Then digging and backfillingthe trench by digging and carrying earth from a lead ofmaximum 30Mtrs and then ramming the soil after cablelaying. This includes supply of half round RCC pipe. | Metre | 500.00 | 372 | 1,86,000 |
| 6 | Excavation of trench and clearing of roots of trees, bushes, ballastand reconditioning etc., including bailing out water and disposal ofextra soil. Track crossing, Road Crossing by pushing method(HDD method) at culverts/ track / pucca road crossing at a depthnot less than 1 meter with reference to bottom of rail/road surfaceincluding supply of GI pipe with 76 mm dia, Spec. No. - 1239medium grade (for the length of pushing more than 05 meters). | Metre | 175.00 | 2,246 | 3,93,050 |
| 7 | Cement Concrete of proportion 1:3:6 with graded aggregate of size 25mm. and below. | cum | 9.00 | 2,943 | 26,487 |
| 8 | Laying of Signalling Cable/Power/Quad cable / PIJF cablein the excavated trench toDrg.No:CON/SK/T/5.Transportation, supply of 'U' clampsand anchoring of cable at every 10 Mtrs with 'U' clamp toDrg.No:CSTE/C/Cable/81 including back filling withexcavated earth and ramming of trenches after cablelaying. Note: The contractor has to conduct detailed sitesurvey of the cable route, prepare a plan to get approval ofthe Railway, putting white lime powder marking beforeexcavation of earth under supervision of railways authorised representative. | Kilometre | 21.00 | 16,740 | 3,51,540 |
| 9 | The excavation of pit, casting of concrete foundation includingsurrounding earthwork along the foundation, erection, installationand wiring of steel appartus case, fixing of terninals, fuse blocks,signal transformer, current transformer, filament switching unit,track battery chargers, adjustable/fixed resistances, choke coils,Fuses, Relays, E type locks , termination of cables, cableinsertion, wiring to draw 110V AC therefore in the new apparatuscase as required, testing, commissioning including subsequentalterations (if required), bunching of cables, earthing of cable,armours etc. Painting of the apparatus case inside and outsideafter clearing the surface thoroughly and first coating of anti -corrosive paint and subsequent two coatings of Alluminium paintoutside and Red Oxide inside and lettering. 18 mm Hylum sheetfor location box shelf and 12 mm for cable termination in locationbox.Steel appartus case (Large) to Drg.No. CON/SK/T/8 with 4Nos. of foundation bolts 20mm x 460mm to Drg.No. SA-112 A/Mor latest. | Numbers | 11.00 | 17,067 | 1,87,737 |
| 10 | Alteration/ Modifications in the existing location boxes, fixing ofequipments, cable insertion, termination, wiring, testing &commissioning, two coat painting, lettering to suit the circuits asper approved wiring diagrams. This includes filling with sand and plastering the same. | Numbers | 15.00 | 2,548 | 38,220 |
| 11 | Transportation, installation of optical fibre joint closure and splicing of Optical fibre cable (2 x 24 fibres) and testing, Optical fibre cable splicing shall be done in the presence of Railway's representative. Only joint closure shall issued by the Railway. All other tools/test equipments required shall be arranged by the Contractor. This also includes excavation of earth for construction of masonary pit of bricks (inside complete plastered), the inner size of pit 1.2m x 1.2m (depth 0.75m) in all types of soils for keeping cable coils at the location of OFC joints, filling the pit with sand after jointing of cables, ramming and covering with RCC slab as per Drg. and instructions of site incharge of Railway. | Numbers | 12.00 | 19,019 | 2,28,228 |
| 12 | Installation, testing and commissioning of Permanent and Maintenance Free Earth pits.Installation charges : Earthpit (1 Set) It includes: (1) Civil works related to earth pit digging, PMF earth pit installation,,backfilling and chamber making, (2) Materials for chamber including Chamber Cover. | Numbers | 14.00 | 5,882 | 82,348 |
| 13 | Excavation of earth pit, transportation, placing and fixing of earth electrode with construction of cement encloser to Drg.No.CON/SK/T/9 and CON/SK/T/9A and drawal of GI wire wrapped on MS strip (35 x 6 mm) from earth electrode to all signalling equipments, including fixing and soldering of lugs at both end of the wire. | Numbers | 15.00 | 1,941 | 29,115 |
| 14 | Transportation including loading/unloading of HDPE pipe from the stores of railway to the work site, laying of the same in excavated trench/already laid GI/RCC pipes/tubes, jointing, levelling and end sealing the pipes. | Kilometre | 5.00 | 7,762 | 38,810 |
| 15 | Transportation, loading/unloading of OFC from the stores of railway to the work site with care, pushing/pulling OFC through the HDPE pipes, sealing of the duct by sealling /caps plugs. The cable is to be laid by mechanised means. At inaccessible places where mechanised laying is not possible, the cable is to be laid manually. This also includes testing of cable drums in the store premises before transportation and submissions of results thereof. Empty cable drums to be returned by the contractor. The cable drums with unused cable at site to be returned by the contractor to the stores depot of Consignee. | Kilometre | 4.00 | 18,672 | 74,688 |
| 16 | Transportation & Execution of following kinds of joints on Quad Cable using thermoshrink jointing kit. This also includes excavation of cable joint pit of size 1.2m x 1.2m x 1.0m in all types of soil for jointing of copper cables, back filling and ramming after jointing. (b) straight through joint on Quad cable/10-20-50 pairs PIJF Cable. | Numbers | 22.00 | 1,385 | 30,470 |
| 17 | Excavation of trench and clearing of roots of trees, bushes, ballast and reconditioning etc., including bailing out water and disposal of extra soil. Track crossing, Road Crossing by pushing method (HDD method) at culverts/ track / pucca road crossing at a depth not less than 1 meter with reference to bottom of rail/road surface including supply of GI/HDPE pipe. (a) HDPE pipe/DWC pipe(4 inch dia) | Metre | 100.00 | 1,080 | 1,08,000 |
| 18 | Fixing of concrete cable route marker at 30-40 meter andat diversion point including supply & transportation of cableroute marker at site. Detail size & fixing of cable route marker should be followed as per drawing no. SDO/Cablelaying/020. | Numbers | 47.00 | 415 | 19,505 |
| 19 | Laying of Power cable in the same excavated trench to Drg.No:CON/SK/T/5.Transportation, supply of 'U' clamps and anchoring of cable at every 10 Mtrs with 'U' clamp to Drg.No:CSTE/C/Cable/81. Transportation, supply and placement of 2nd class bricks in the trench length wise between power cable & other signalling/quad cable in the same trench all along the trench (4.5 bricks approx per Mtr.) including back filling with excavated earth and ramming of trenches after cable laying. | Kilometre | 1.00 | 25,526 | 25,526 |
| 20 | Transportation of released materials from site to the stores ofSSE(Sig/Tele)/R or BIA or BYT or DRZ or to GSD. This includesloading, unloading and stacking of materials. | Per Trip | 7.00 | 3,661.1 | 25,627.7 |
| 21 | Shifting of cables in roll with or without wooden drums from other than nominated consignee depot and meggering before loading and after laying, and recording the values in cable insulation register along with representative of Railways. NOTE: Unit 'Numbers' stands for 'Drum/Roll'. | Numbers | 5.00 | 1,282 | 6,410 |
| 22 | Alteration of existing Q-series/Composite Relay Racks and cable termination racks. | Numbers | 16.00 | 19,785 | 3,16,560 |
| 23 | Installation of signal posts for Multiple Aspect Colour LightSignals complete with signal units, bases, LED unit, fixingand wiring of current transformers of LED units, ladders &other fittings, excavation of pit, casting of cement concretefoundations with necessary water outlets, erection andfixing of complete fittings of the signal/signal post withnecessary earthed screen protection arrangement,including drawing of cable through signal posts,termination of cables, wiring, testing and commissioning,two coat painting and lettering, supply and fixing of speedboards if required for the following:- NOTE:- Thefoundation for Multiple Aspect Colour Light Signal Postdrg. No. Con/SK/T/12 and and the foundation bolts shallbe of sizes 24 mm x 915 mm to Drg. No. SA- 116A/M andbolts for each foundation for above shall be of size 20 mmx 305 mm to Drg. No. SA- 110A/M ( 4 nos. for each) withtwo nuts and two washers each per bolt. (a) 3 ASPECT/4ASPECT | Numbers | 5.00 | 19,551 | 97,755 |
| 24 | Design & Preparation of SWR & GWR in English & Hindi for execution to be made by the contractor as per SECRly practice in conformity with GR, SR & SEM provisions and in accordance with CSTE/OL/GRC's circular No.3 of 1984 with the latest alterations & amendments based on IP (tentative/approved) (to be supplied by the Rlys). | Numbers | 5.00 | 8,197.6 | 40,988 |
| 25 | Execution to be made by the contractor in Autocad as perfollowing :-1. SECRailwayPractice in conformity with GR,SR& SEM. 2 . As per latest typicalcircuit diagram andguidelinesof SEC railway. Design &Preparation ofCircuits and drawingsDesign,Preparation & checking of documents and Circuit diagram and drawings(a) Design and development of Circuit Diagram in size B(A3) as per SEM sheet including contact analysis. | Sheet | 100.00 | 1,004 | 1,00,400 |
| 26 | Transportation, installation of Track Lead Junction Box along with lead wires for replacement / lifting as advised by Railway representative. All materials like TLJB, angles, lead wires, channel pins, ARA terminals as may be required shall be supplied by the Railways. The nut & bolts & washer shall be supplied by contractor. | Numbers | 8.00 | 171.6 | 1,372.8 |
| 27 | Installation, Testing and Commissioning of Digital Axle Counter and field training (One man day per set) at site and training to the field staff at site for three days. | Set | 2.00 | 48,608 | 97,216 |
| 28 | Dismantling of Lifting barrier complete and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 4.00 | 3,623 | 14,492 |
| 29 | Dismantling of operation cum indication panel and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 3.00 | 2,415 | 7,245 |
| 30 | Dismantling of Signal posts/BSLB/SLB/Stop Board and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 12.00 | 232 | 2,784 |
| 31 | Dismantling of Relay racks with all fittings, battery racks complete, Equipment rack complete, SM's slide and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 10.00 | 360 | 3,600 |
| 32 | Dismantling of Steel apparatus case with fittings and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 10.00 | 232 | 2,320 |
| 33 | Dismantling of Emergency sliding barrier and stacking asper instruction of Rep.of Sr.DSTE/R. | Set | 3.00 | 3,556.8 | 10,670.4 |
| 34 | Dismantling of Location Foundation(By hydraulic breaker). | Numbers | 8.00 | 1,087 | 8,696 |
| 35 | Dismantling of Signal Foundation(upto ground level by hydraulic breaker). | Numbers | 8.00 | 2,174 | 17,392 |
| 36 | Installation, cable termination, testing and commissioning of 10/20/50 Pair CT Boxes. | Numbers | 56.00 | 786 | 44,016 |
| 37 | Installation of signal posts (2 Aspect) for Multiple Aspect Colour Light Signals complete with signalunits,bases, LED unit, fixing and wiring of current transformers of LED units, ladders & other fittings, excavation of pit, casting of cement concrete foundations with necessary water outlets, erection and fixing of complete fittings of the signal/signal post with necessary earthed screen protection arrangement, including drawing of cable through signal posts, termination of cables, wiring, testing and commissioning, two coat painting and lettering, supply and fixing of speed boards if required for the following:- NOTE:- The foundation for Multiple Aspect Colour Light Signal Post drg.No. Con/SK/T/12 and and the foundation bolts shall be of sizes 24 mm x 915 mm to Drg. No. SA-116A/M and bolts for each foundation for above shall be of size 20 mm x 305 mm to Drg. No. SA-110A/M ( 4 nos. for each) with two nuts and two washers each per bolt.3 ASPECT/4 ASPECT Note:Payment can be released in a part for the abovesaid works after completion of- (i) Foundation-30%, (ii) Erection - 15%,(iii) Wiring, testing,painting, sand filling, plastering, earthing &writings etc - 45%, (iv) Commissioning - 10% ofthe rate. | Numbers | 2.00 | 17,378 | 34,756 |
| 38 | Fixing of calling-on signals/dependent shunt signals with enameled markers including drawing of cable through the signal post, termination of cables, wiring, fixing of calling- on/dependent shunt signal legend board, LED, two coat painting and lettering, testing and commissioning as required. | Numbers | 2.00 | 4,629 | 9,258 |
| 39 | Fixing, cable drawing and termination, wiring, painting, lettering, testing and commissioning of Junction type Route indicator complete along with lamp/LED unit-3/4 Way | Numbers | 2.00 | 3,086 | 6,172 |
| 40 | Physical tracing and opening/locating of existing working cables by precession digging for diversion of cables in connection with cable clearance for engineering earth work without interfering the circuits as per the advice of Railway site engineer. | Metre | 150.00 | 241 | 36,150 |
| 41 | Design, Preparation & checking of documents and Circuitdiagram and drawings - Design & development of cable corage plan in size U(A3) as per SEM. | Station | 1.00 | 2,511 | 2,511 |
| 42 | Design, Preparation & checking of documents and Circuit diagram and drawings - Design & development of cable route plan in size U(A3) as per SEM. | Station | 1.00 | 1,256 | 1,256 |
| 43 | Design, Preparation & checking of documents and Circuit diagram and drawings - Design and development of Station working rule Diagram (SWRD) based on SIP of station in size U(A3) as per SEM. | Station | 1.00 | 5,024 | 5,024 |
| 44 | Design, Preparation & checking of documents and Circuit diagram and drawings - Development of SIP based on ESP on size W(A1) | Station | 1.00 | 5,024 | 5,024 |
| 45 | Transportation, fixing & commissioning of different type of Dominos complete with button assemblies and indication to suit the modification of the existing operation cum indication panel. | Numbers | 30.00 | 565.4 | 16,962 |
| 46 | Alteration/modification, testing, commissioning, two coat painting, lettering of the existing 2 Aspect/3 Aspect/4 aspect signals/shunt signals/calling on signal/ LC gate to suit the circuit per approved wiring diagram including fixing of LED/Singal lamps and their wiring. | Numbers | 3.00 | 1,274 | 3,822 |
| 47 | Modification in existing EI System of MEDHA make at RVH Station as per RDSO spec no. RDSO/SPN/192/2019, in connection with the closure of LC Gate No: RV(6) & RV(7). | Job | 1.00 | 31,96,700 | 31,96,700 |
| 48 | Modification in existing EI System of Kyosan make of Raipur Station in connection with closure of LC No 417. This includes: (1) Interconnecting cables, connectors, terminals, mounting arrangements, fixtures & accessories to make EI system alteration functional, (2) Alteration of existing Application Logic Programme to suit modified SIP, (3) Alteration to existing interface circuit diagram to suit modified SIP, (4) Factory Acceptance Test of EI System, (5) Site Acceptance Test of EI System, (6) Installation, testing & commissioning of EI system as per modified SIP etc. | Job | 1.00 | 58,15,026 | 58,15,026 |
| 49 | Installation (including over hauling) of Electric pointmachines on MS plate fixed on wooden/PSC sleeperscomplete with crank handle key Interlocking arrangementas per the drawing approved by Railways, junction boxes(as suggested by the railway) with 1 ½'' dia G.I.pipe/HDPEpipe of required length up to point machine, ground connections, including smithy works involved, insulation ofMS plate on which the point machine is to be fixed from the gauge tie plate involving revetting/welding of angle, cleats, termination of cables, wiring, preliminary adjustment for operation of point by crank handle and subsequent final adjustment, painting and lettering as required, testing and commissioning of the same. | Each | 128.00 | 12,859 | 16,45,952 |
| 50 | Dismantling of point machine and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 128.00 | 603 | 77,184 |
| 51 | Dismantling & Installation and fixing of Ground connectionof point machine for replacement / repairing of existingGround connection as advised by Rep.of Sr.DSTE/R. ItIncludes smithy works involved, drilling of holes in TongueRail / Stock Rail LH or RH or both site asper siterequirement if required, preliminary adjustment foroperation of point by crank handle and subsequent final adjustment, painting and lettering as required, testing and commissioning of the same. ( any type of IRS Point machine) | Numbers | 150.00 | 4,899.6 | 7,34,940 |
| 52 | Transportation, Fixing & commissioning of wall mounting Rack (9U) as per instructions of site in- charge. | Numbers | 1.00 | 933.96 | 933.96 |
| 53 | Installation, Testing & Commissioning of Layer- 2 PoE Switch (minimum 8+2 port manageable) with 8 nos. 10/100/1000 Mbps Ethernet port,PoE and 2 nos. 1000BaseX SM SFP port with optical modules .All the accessories and fixing materials required for this installation are to be supplied by contractor within the same cost. | Numbers | 2.00 | 2,451.25 | 4,902.5 |
| 54 | Supply and fixing of PVC casing caping 25mm x 25mmsizefor indoor wiring. This includes drawal of wires in thecasingcaping and termination of wire at end point.Thework shouldbe carried out as per the instruction of Railway site Engineer. | Metre | 100.00 | 43 | 4,300 |
| 55 | Laying/Drawl of data cable/CAT-6 cable/communication cable/power cable/OFC/other cables through PVC pipe/casing & capping as per sire requirement and instruction of sire in-charge. | Metre | 400.00 | 7.05 | 2,820 |
| 56 | Installation, Testing & Commissioning of rack mountable 24 port manageable Layer -2 switch with 4 nos 1000 Base X SM SFP port and 24 nos GE port .All the accessories and fixing materials required for this installation are to be supplied by contractor within the same cost. | Numbers | 2.00 | 2,451.25 | 4,902.5 |
| Schedule total | ₹1,47,20,864.86 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .