Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹3.6 L (2.10%)Admitted-Finance | ₹1.8 Cr+₹3.6 L (2.10%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 02 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S MUDRAWATI L2 | M/S BABA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Erection Work | |||||
| 2.00 | Erection of ST single Pole | 19 | Nos | 44,365 ₹44,365 | 44,270 ₹44,270 Lowest |
| 3.00 | Erection of single PCC Pole with all accessaries | 634 | Nos | 23,52,140 ₹23,52,140 | 23,45,800 ₹23,45,800 Lowest |
| 4.00 | Erection of PCC double Pole with all accessaries | 17 | Nos | 51,170 ₹51,170 | 51,000 ₹51,000 Lowest |
| 5.00 | Grounting of Pole | 596 | Nos | 6,61,560 ₹6,61,560 | 6,55,600 ₹6,55,600 Lowest |
| 6.00 | Nozling, grouting of stay | 146 | Nos | 2,42,360 ₹2,42,360 | 2,40,900 ₹2,40,900 Lowest |
| 7.00 | Earthing Complete | 557 | Nos | 3,70,405 ₹3,70,405 | 3,62,050 ₹3,62,050 Lowest |
| 8.00 | T-off Channel size 125x65x1300 mmFitting with Pole | 79 | Nos | 57,275 ₹57,275 | 56,880 ₹56,880 Lowest |
| 9.00 | Lying,spreding, Tighting &binding of conductor H.T. Line 3 Phase 3 Wire | 34.52 | KM | 2,49,476.04 ₹2,49,476.04 | 2,48,544 ₹2,48,544 Lowest |
| 10.00 | Tree Cuting | 25 | Nos | 7,500 ₹7,500 | 7,250 ₹7,250 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹3.3 L
Closing Date
29 Mar 2023, 2:00 pmClosed
SUPERINTENDING ENGINEER
Superintending Engineer, Electricity Distribution Circle Malviya Road Basti
Construction of 11 KV, LT Line and capacity enhancement for Nagar Panchayt Munderwa, Bankati and Gayghat kudraha Under EDD IIIrd Basti
2023_PVVNV_788883_1
60/EDC(B)/2022-23
Open Tender
Electrical Works
Lump-sum
BASTI
as per tender
2 documents required · 2 mandatory
₹1,180
S.E.EDC Basti
₹3.3 L
3 Apr 2023
23 Mar 2023
30 Mar 2023
23 Mar 2023
29 Mar 2023
23 Mar 2023
Erection Work
Erection of ST single Pole
Erection of single PCC Pole with all accessaries
Erection of PCC double Pole with all accessaries
Grounting of Pole
Nozling, grouting of stay
Earthing Complete
T-off Channel size 125x65x1300 mmFitting with Pole
Lying,spreding, Tighting &binding of conductor H.T. Line 3 Phase 3 Wire
Tree Cuting
V-type x-arm fitting
Construction of Plinth of size 2x2x1.5
Construction of Fencing of Plinth
Unmounting of existing 250 KVA T/F
Mounting of 400 KVA T/F on Plinth
Making of All Connection for 400 KVA T/F
Safe Carrige of Old 250 KVA T/F from work site to Store Center Basti
Safe Mounting & charging of 63 KVAT/F on double Pole
Safe Mounting & charging of 100 KVA T/F on Double
Centrilize Material
STP Pole 11 Mtr
PCC Pole 8.5 Mtr
ACSR Wesal Conductor
11 KV V X-Arm
11 KV Pin insulator with Pin
11 KV Disc Insulator with fiting
Top Channel
Earthing Complete
Stay set Complete
11/0.4 KV 63 KVA Trasformer
11/0.4 KV 100 KVA Trasformer
11/0.4 KV 400 KVA Trasformer
T-Off Channel
Danger Board
De-Centrilized Material
X-Arm Holding Clamp
T-Off Channel Clamp
F-Bracket with Nbut & Bolt
M.S. Nut & Bolt of Varius Type
Alluminium Lug for 400 KVA
Guarding Channel
Guarding Wire
X-Arm Holding Clamp
I Hook
Suspenion Clamp
Barbed Wire
T-Off Channel Clamp
F-Bracket
M.S. Nut & Bolt of Varius Type
PG Clamp
Gaurding Wire
Gaurding Channel
Clamp with Nut & Bolt for top channel
Clamp with Nut & Bolt for Guarding channel
M/S MUDRAWATI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .