Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAdmitted-Finance NO 354 2ND CROSS VARADARAJNAGAR VIDYARANYAPURA POST BANGALORE 5600 097 | 5600097 | ₹19.5 L | L1 | Admitted-Finance |
| 2 | L2₹22.6 L+₹3.1 L (16.0%)Admitted-Finance HOUSE NO 95 STREET NO 08 JAWAHAR COLONY NEAR LAXMI DAIRY FARIDABAD SECTOR 22 HARYANA 121005 | FARIDABAD | HARYANA | 121005 | ₹22.6 L+₹3.1 L (16.0%) | L2 | Admitted-Finance |
| 3 | L3₹28.0 L+₹8.5 L (43.5%)Admitted-Finance 403 GH MANSADEVI COMPLEX PANCHKULA 134109 HARYANA | PANCHKULA | HARYANA | 134109 | ₹28.0 L+₹8.5 L (43.5%) | L3 | Admitted-Finance |
| 4 | L4₹28.5 L+₹9.0 L (46.1%)Admitted-Finance | ₹28.5 L+₹9.0 L (46.1%) | L4 | Admitted-Finance |
| 5 | L5₹29.5 L+₹10.0 L (51.3%)Admitted-Finance BUDOOBAGH NOWPORA 0 KHANYAR SRINAGAR JAMMU KASHMIR 190003 | SRINAGAR | JAMMU AND KASHMIR | 190003 | ₹29.5 L+₹10.0 L (51.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Top Mind Industries Pvt Limited L5 | Intrernational Engineers L4 | RND ENGINEERS & CONTRACTORS L2 | EESSI L3 | S S BUILDERS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Labour only for attending of break down/day to day complaint or call on attending any break down or maint work in CHS of capacity 20 Lakh kcal/hr located in GH, checking the serviceability of AHU's/Boilers/fluid lines/AHU's motors of any capacity for having continuous serviceability of CHS Plant in GH for any number of time as desired by Engr-in-Charge including servicing of GI Duct usef for flowing of Hot air and replacement of minor spare parts required at site and maint of Fluid Pipe line anywhere about the premises to have continuous flow of Thermic fluid, repairing insulation of pipe line of any size, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with AHu's Panel / Main Electrical Panel / AHU remote Control Panel including all other related complaints to the entire satisfaction of Engr-in-Charge complete all as directed at site. | 165 | Each Job | 300 ₹49,500 | 1,995 ₹3,29,175 | 2,500 ₹4,12,500 | 2,000 ₹3,30,000 | 100 ₹16,500 Lowest |
| 2.00 | Material and labour for dismantling of burner rod assy and removing of top cover of boiler capacity 20 lakh kcal/hr model TPA-20/L/P/17 and complete servicing the boiler by using coil shine chemical and removing the complete carbon/oil deposits including repair to coil assy if there is any leakage found and reassembling/testing the same complete all as specified and/ or as directed by Engr-in-Charge. | 3 | Each Job | 85,000 ₹2,55,000 | 25,000 ₹75,000 | 70,000 ₹2,10,000 | 1,00,000 ₹3,00,000 | 3,000 ₹9,000 Lowest |
| 3.00 | Material and labour for dismantling of burner rod assy and complete servicing the burner capacity 20 lakh kcal/hr model TPA-20/L/P/17 and removing the complete carbon/oil deposits including repairing the burner and reassembling/testing the same complete all as specified and/ or as directed by Engr-in-Charge. | 3 | Each Job | 45,000 ₹1,35,000 | 18,000 ₹54,000 | 32,000 ₹96,000 | 15,000 ₹45,000 | 3,000 ₹9,000 Lowest |
| 4.00 | Material and labour for servicing of Air Handling Unit capacity 15000 CFM including repair to coil assy by welding if there is any leakage found and testing the same, replacement bearings of motor capacity 7.5 HP/10HP, reassembling/ testing the same including painting of AHU with two coats of aluminium paint over a coat of red oxide primer and cleaning of AHU room complete all as specified and/ or as directed by Engr-in-Charge. | 11 | Each Job | 14,500 ₹1,59,500 | 10,000 ₹1,10,000 | 19,000 ₹2,09,000 | 3,000 ₹33,000 Lowest | 14,000 ₹1,54,000 |
| 5.00 | All as per Srl Item No. 4 above, but of capacity 10000 CFM with electric motor 5.5 HP. | 11 | Each Job | 14,500 ₹1,59,500 | 8,000 ₹88,000 | 14,000 ₹1,54,000 | 3,000 ₹33,000 Lowest | 10,000 ₹1,10,000 |
| 6.00 | Supply only V Belt B-77/B-100 suitable for AHU as per sample. | 7 | Each | 4,500 ₹31,500 | 1,850 ₹12,950 | 2,000 ₹14,000 | 2,000 ₹14,000 | 500 ₹3,500 Lowest |
| 7.00 | Supply only fuel injection nozzle suitable for working on 20 Lakh K Cal/Hr oil fired hot water boiler capacity burner. | 3 | Each | 4,500 ₹13,500 | 4,650 ₹13,950 | 3,500 ₹10,500 Lowest | 8,000 ₹24,000 | 4,000 ₹12,000 |
| 8.00 | Material and labour for control wiring of complete AHU of capacity 15000/10000 CFM connecting blower motor of capacity 7.5/10 HP with auto control panel with PVC Copper conductor of not less than 4/6 Sqmm. Make : Finolex/Havells including binding of complete wiring with tie, concealed channel as required at site complete all as directed and testing to the entire satisfaction of Engr-in-Charge. | 5 | Each Job | 15,000 ₹75,000 | 4,600 ₹23,000 | 2,000 ₹10,000 Lowest | 5,000 ₹25,000 | 2,000 ₹10,000 Lowest |
| 9.00 | Material and labour for removing of old unserviceable refractory compound from Diesel /oil fired hot water boiler at GH and applying refactory compound evenly inside the surface of oil fired hot water boiler complete all as specified and/ or as directed by Engr-in-Charge. | 80 | Kg | 220 ₹17,600 | 475 ₹38,000 | 50 ₹4,000 Lowest | 400 ₹32,000 | 100 ₹8,000 |
| 10.00 | Supply only star coupling with Rubber Love joint coupling F225 Suitable for 60 HP TF Pump. | 10 | Each | 8,500 ₹85,000 | 1,950 ₹19,500 | 1,500 ₹15,000 | 3,000 ₹30,000 | 1,000 ₹10,000 Lowest |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
29 Aug 2026, 6:00 pmClosed
CWE, HQ 138 WE
CWE, HQ 138 WE
REPAIR/REPLACEMENT AND MAINTENANCE OF CENTRAL HEATING PLANT AT GH UNDER AGE E/M-II OF GE 865 EWS
2026_MES_782207_1
138WE/L-79/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE 865 EWS
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE 865 EWS
₹70,000
Yes
8 Sept 2026
1 Aug 2026
5 Sept 2026
1 Aug 2026
29 Aug 2026
15 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour only for attending of break down/day to day complaint or call on attending any break down or maint work in CHS of capacity 20 Lakh kcal/hr located in GH, checking the serviceability of AHU's/Boilers/fluid lines/AHU's motors of any capacity for having continuous serviceability of CHS Plant in GH for any number of time as desired by Engr-in-Charge including servicing of GI Duct usef for flowing of Hot air and replacement of minor spare parts required at site and maint of Fluid Pipe line anywhere about the premises to have continuous flow of Thermic fluid, repairing insulation of pipe line of any size, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with AHu's Panel / Main Electrical Panel / AHU remote Control Panel including all other related complaints to the entire satisfaction of Engr-in-Charge complete all as directed at site. | 165 | Each Job | - | - |
| 2 | Material and labour for dismantling of burner rod assy and removing of top cover of boiler capacity 20 lakh kcal/hr model TPA-20/L/P/17 and complete servicing the boiler by using coil shine chemical and removing the complete carbon/oil deposits including repair to coil assy if there is any leakage found and reassembling/testing the same complete all as specified and/ or as directed by Engr-in-Charge. | 3 | Each Job | - | - |
| 3 | Material and labour for dismantling of burner rod assy and complete servicing the burner capacity 20 lakh kcal/hr model TPA-20/L/P/17 and removing the complete carbon/oil deposits including repairing the burner and reassembling/testing the same complete all as specified and/ or as directed by Engr-in-Charge. | 3 | Each Job | - | - |
| 4 | Material and labour for servicing of Air Handling Unit capacity 15000 CFM including repair to coil assy by welding if there is any leakage found and testing the same, replacement bearings of motor capacity 7.5 HP/10HP, reassembling/ testing the same including painting of AHU with two coats of aluminium paint over a coat of red oxide primer and cleaning of AHU room complete all as specified and/ or as directed by Engr-in-Charge. | 11 | Each Job | - | - |
| 5 | All as per Srl Item No. 4 above, but of capacity 10000 CFM with electric motor 5.5 HP. | 11 | Each Job | - | - |
| 6 | Supply only V Belt B-77/B-100 suitable for AHU as per sample. | 7 | Each | - | - |
| 7 | Supply only fuel injection nozzle suitable for working on 20 Lakh K Cal/Hr oil fired hot water boiler capacity burner. | 3 | Each | - | - |
| 8 | Material and labour for control wiring of complete AHU of capacity 15000/10000 CFM connecting blower motor of capacity 7.5/10 HP with auto control panel with PVC Copper conductor of not less than 4/6 Sqmm. Make : Finolex/Havells including binding of complete wiring with tie, concealed channel as required at site complete all as directed and testing to the entire satisfaction of Engr-in-Charge. | 5 | Each Job | - | - |
| 9 | Material and labour for removing of old unserviceable refractory compound from Diesel /oil fired hot water boiler at GH and applying refactory compound evenly inside the surface of oil fired hot water boiler complete all as specified and/ or as directed by Engr-in-Charge. | 80 | Kg | - | - |
| 10 | Supply only star coupling with Rubber Love joint coupling F225 Suitable for 60 HP TF Pump. | 10 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TENDERL79202627.pdf
Tender Documents • 1.09 MB
BOQ_876302.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .