| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | L1 | Accepted-AOC Agreement With L1 | |
| 2 | L2₹25.0 L+₹30,625.87 (1.24%)Rejected-Finance | L2 | Rejected-Finance Agreement with L1 | |
| 3 | L3₹25.1 L+₹34,064.36 (1.38%)Rejected-Finance | L3 | Rejected-Finance Agreement with L1 | |
| 4 | L4₹25.9 L+₹1.2 L (4.76%)Rejected-Finance | L4 | Rejected-Finance Agreement with L1 | |
| 5 | L5₹27.5 L+₹2.7 L (11.0%)Rejected-Finance | L5 | Rejected-Finance Agreement with L1 |
| Sl No | Description | Qty | Unit | M/S MUNIS RAZA CONSTRUCTION L3 | M/S MOHD. IDRIS CONTRACTOR L5 | Akash Contractor L1 | M/S N.K. CONTRACTOR L2 | M/S YOGESH ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60M as per direction of Engineer-in-charge | 36.8 | M3 | 440 ₹16,192 | 500 ₹18,400 | 300 ₹11,040 | 81 ₹2,980.8 Lowest | 401.45 ₹14,773.36 |
| 2.00 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 314.93 | M3 | 60 ₹18,895.8 | 90 ₹28,343.7 | 45 ₹14,171.85 Lowest | 71 ₹22,360.03 | 77.5 ₹24,407.08 |
| 3.00 | Providing and laying Cement concrete A20 M10 (1:3:6) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work as directed by engineer-in-charge. | 33.98 | M3 | 4,200 ₹1,42,716 | 4,786 ₹1,62,628.28 | 5,250 ₹1,78,395 | 4,200 ₹1,42,716 | 4,090.68 ₹1,39,001.31 Lowest |
| 4.00 | Providing and laying First class (M-150) Brick work in 1:4 CM with coarse sand F.M. more than 2.20 including all labour, material, T&P etc required for proper completion of work as directed by engineer-in-charge. | 120.56 | M3 | 4,500 ₹5,42,520 | 5,250 ₹6,32,940 | 5,000 ₹6,02,800 | 4,300 ₹5,18,408 Lowest | 4,314.96 ₹5,20,211.58 |
| 5.00 | Providing and laying Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 187.64 | M3 | 6,000 ₹11,25,840 | 5,786 ₹10,85,685.04 | 5,900 ₹11,07,076 | 5,400 ₹10,13,256 Lowest | 5,445.22 ₹10,21,741.08 |
| 6.00 | Providing and Fixing Centering and shuttering of RCC/CC work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 442.21 | M2 | 300 ₹1,32,663 | 400 ₹1,76,884 | 200 ₹88,442 Lowest | 379 ₹1,67,597.59 | 230 ₹1,01,708.3 |
| 7.00 | Providing & Laying Reinforcement Fe 550 (SAIL/TATA/JINDAL etc.) in cutting, binding , bending, placing in position i/c all cost of material, labour, T&P etc. completion of work as per direction by Engineer -In charge. (per M.T.) | 2.23 | MT | 7,000 ₹15,610 Lowest | 70,786 ₹1,57,852.78 | 68,000 ₹1,51,640 | 59,590 ₹1,32,885.7 | 71,200 ₹1,58,776 |
| 8.00 | Providing & Dumping of boulder 20 to 40 kg size in D/S of cutnoff wall in bed of AB canal including cost of material, labour, T&P etc. Complete of work. | 244.71 | M3 | 1,500 ₹3,67,065 | 1,200 ₹2,93,652 | 1,000 ₹2,44,710 Lowest | 1,321 ₹3,23,261.91 | 1,650 ₹4,03,771.5 |
| 9.00 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) | 252 | M2 | 110 ₹27,720 | 135 ₹34,020 | 65 ₹16,380 Lowest | 110 ₹27,720 | 105.63 ₹26,618.76 |
| 10.00 | 12.5 mm. Thick cement plaster In 1:4 C.M. i/c cost of all material , labour and T & P etc. | 80.96 | M2 | 130 ₹10,524.8 | 170 ₹13,763.2 | 85 ₹6,881.6 Lowest | 140 ₹11,334.4 | 133.45 ₹10,804.11 |
Tender Value
₹33.4 L
EMD Value
₹66,860
Closing Date
14 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-08/EE/2026-27 Restoration of damaged concrete structures for the protection of banks downstream of Akbarpur Cross Regulator located at Km 27.246 of Anupshahar Branch Canal. LOT-02
2026_UPIDC_1192818_2
TN-08/E.E/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹66,860
6 Nov 2026
5 Oct 2026
14 Oct 2026
5 Oct 2026
14 Oct 2026
5 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60M as per direction of Engineer-in-charge | 36.8 | M3 | - | - |
| 2 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 314.93 | M3 | - | - |
| 3 | Providing and laying Cement concrete A20 M10 (1:3:6) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work as directed by engineer-in-charge. | 33.98 | M3 | - | - |
| 4 | Providing and laying First class (M-150) Brick work in 1:4 CM with coarse sand F.M. more than 2.20 including all labour, material, T&P etc required for proper completion of work as directed by engineer-in-charge. | 120.56 | M3 | - | - |
| 5 | Providing and laying Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 187.64 | M3 | - | - |
| 6 | Providing and Fixing Centering and shuttering of RCC/CC work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 442.21 | M2 | - | - |
| 7 | Providing & Laying Reinforcement Fe 550 (SAIL/TATA/JINDAL etc.) in cutting, binding , bending, placing in position i/c all cost of material, labour, T&P etc. completion of work as per direction by Engineer -In charge. (per M.T.) | 2.23 | MT | - | - |
| 8 | Providing & Dumping of boulder 20 to 40 kg size in D/S of cutnoff wall in bed of AB canal including cost of material, labour, T&P etc. Complete of work. | 244.71 | M3 | - | - |
| 9 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) | 252 | M2 | - | - |
| 10 | 12.5 mm. Thick cement plaster In 1:4 C.M. i/c cost of all material , labour and T & P etc. | 80.96 | M2 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2251475.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .