| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.4 LAccepted-AOC TAMIL NADU | PONDICHERRY | PUDUCHERRY | 605007 | ₹41.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹41.8 L+₹38,402.60 (0.93%)Rejected-AOC | ₹41.8 L+₹38,402.60 (0.93%) | L2 | Rejected-AOC Rejected |
| 3 | l3₹42.4 L+₹96,006.48 (2.32%)Rejected-AOC UNIT 22 ZONE08 WARD COUNCILLOR FUND | WEST | DELHI | 110008 | ₹42.4 L+₹96,006.48 (2.32%) | l3 | Rejected-AOC Rejected |
Tender Value
₹40 L
EMD Value
₹40,100
Closing Date
5 Mar 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
Construction of Womens Gym Building in first floor of existing building (Mens Gym) at Aadhi Andhra nagar in Div-97, Unit 21, Zone-08. (Central MP Fund)
2026_CoC_670083_1
Z.O.VIII.C.NO.E1/147/2026
Limited
Civil Works
Works
270 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40,100
10 Aug 2026
4 Mar 2026
6 Mar 2026
4 Mar 2026
5 Mar 2026
4 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all kinds ...lling the sides with excavated earth etc. complete | 11.03 | CUM | 151.3 | ₹1,668.84 |
| 2 | Plain Cement concrete work 1:4:8 (1 cement, 4 Crus..., etc. complete for foundation, etc. upto basement | 4.38 | CUM | 5,832 | ₹25,544.16 |
| 3 | Supplying and erecting shuttering including necess...dia spaced at 75cmcentre to centre etc. complete.. | 205.59 | SQM | 836.55 | ₹1,71,986.31 |
| 4 | Supplying and erecting centering for sides and sof...dia spaced at 75cm centre to centre etc. complete. | 201.16 | SQM | 945.66 | ₹1,90,228.97 |
| 5 | Supplying, fabricating and placing in position Rib...ngements for the supply of steel and binding wire) | 7,849.67 | KGS | 94 | ₹7,37,868.98 |
| 6 | Providing and laying in position ,Standardised Con... the Department for the excess usage of materials) | 65.17 | CUM | 9,018 | ₹5,87,703.06 |
| 7 | Brick work using best quality II class table moul...tc complete complying with standard specification | 88.44 | CUM | 8,357 | ₹7,39,093.08 |
| 8 | Plastering with cement mortar 1:3 ( 1 cement and 3... sand)15mm thick including curing ,etc., complete. | 1,131.03 | SQM | 310.84 | ₹3,51,569.37 |
| 9 | Scaffolding charges for every additional height of 2.5 M height over the initial height of 3 M. | 52 | R/M | 295.93 | ₹15,388.36 |
| 10 | White washing one coat over a new plastered surface.. | 1,108.53 | SQM | 27.84 | ₹30,861.48 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_805259.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .