Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance | -1.05% | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 LAdmitted-Finance 1454 C JAGRAN MAIDAN LOWADIH NAMKUM RANCHI JHARKHAND 834010 | RANCHI | RANCHI | JHARKHAND | 834010 | +0.00% | ₹7.4 L | L2 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹14,700
Closing Date
12 Feb 2026, 5:00 pmClosed
EE RMC
RMC
Construction of RCC Culvert in mahavir nagar under Ward No-36
2026_UDD_110097_4
196/ENG 2026
Open Tender
Civil Works
60 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹14,700
28 Apr 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
Labour for cleaning the work site before and after work etc.
Labour for site clearance before and after the work etc
Earthwork in excavation in foundation trenches in ordinary soil(vide classification of soil item -A)and disposal of excavated earth as obtained to a distance upto 50 m including all lifts,levelling,ramming the foundation trenches,removing roots of trees,shrubs all complete as per approved design,building specification and direction of E/I
Stone crusher dust finer than 3mm with not more than 10% passing of 0.075 sieve at quarry. Basic rate =300 add 15.95%(CP+O.H+W.C)=347.85
Supplyig and laying(properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials,royality all taxes etc but excluding the cost of carriage,all complete as per specification and direction of E/I
Reinforced cement concrete work in wall(any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutments,posts and struts etc above plinth level upto floor five level,excluding cost of centering,shuttering,finishing and reinforcement 1:1.5:3 (1 cement:1.5 coarse sand(zone-III):3graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beam suspended floor,roof having slope upto 15 degree landings,balconies,shelves,chajjas,lintel,band,pain window sills,staircases and spiral stair case above plinth level upto floor five level,excluding the cost of centering,shuttering,finishing and reinforcement with 1:1.5:3 (1 cement:1.5 coarse sand(zone-III):3graded stone aggregate 20 mm nominal size)
Providing Tor steel reinforced of 8mm bar 10 mm bar as per approved design and drawing excluding carriage of rods (straight or in coils)to work site,cutting,bending and binding with annealed wire with cost of wire,removal of rust,placing the rods in position all complete as per building specification and direction of E/I. 8mm dia bar (40%)
10 mm dia bar (60%)
Centering and shuttering includig struting,propping etc and removal of form for foundation,footing,bases of columns,etc for mass concrete
Sand(lead upto 49 km)
Stone dust(22km)
Stone boulders(36km)
Stone chip(22km)
Earth(1km)
Good & Service Tax (GST)
Labour Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 1.72 MB
BOQ_148743.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid