Reconstruction Renovation and Modernisation of Ventillation and AC system of Kopili PS KHEP NEEPCO Ltd
2021_NEEPC_81013_1
LNIT_11_HVAC_KHEP DTD 30.06.2021
Limited
Construction Works
Works
168 days
as per NIT
as per NIT
2 documents required · 2 mandatory
₹0
Exempted
17 Aug 2021
30 Jun 2021
22 Jul 2021
2 Jul 2021
20 Jul 2021
3 Jul 2021
Amount
AIR CONDITIONING SYSTEM
40 TR ductable split air cooled conditioning units (each with 2W + 1S compressor) complete with all accessories, auxiliaries, including first charge of refrigerant and lubricating oil etc. for control room, conference room and control panel area.
30000 CMH Air handling units (each with 1W +1S) for control panel area and control room
45000 CMH Fresh air centrifugal blowers for power house:
9000 CMH Exhaust air blowers for power house:
Exhaust air fans for exhaust of air from the two battery rooms each of 100% of required capacity. One unit serves as standby
Air Conveyance Pre-fabricated Ducting complete with duct hangers, supports and accessories etc., for the air conditioning and ventilation systems.
Supply & exhaust air grilles/ diffusers complete with volume control damper and frame work for the air conditioning and ventilation systems.
Acoustic/ thermal insulation material for the air conditioning and ventilation systems.
Electrical and Control & Instrumentation Works
Central microprocessor based/computerised control panel for HVAC system complete with all wiring, instrumentation and associated accessories etc
415 V, 3 Phase, 4 wire distribution MCC Panel, non-draw out type complete with incoming & outgoing feeders for catering power supply, as required to various equipment’s of the ventilation and air conditioning loads.
Necessary pressure, temperature, flow/humidity sensing devices/instruments, meters etc.
Coordination and provision of necessary contacts and/or ports for integration with plant SCADA system. (common auxiliaries controller) and Firefighting system
Coordination and provision of necessary contacts and/or ports for integration with Firefighting system providing necessary means and pressure to stop the supply of air to the affected area and to evacuate smoke and toxic particles from the place of origin to the outdoors in a manner that it does not interfere with the operation of plant and to allow for emergency access and egress
Multi stranded power and control cable as per requirement.
Erection and commissioning
Carrying out erection and commissioning of various equipment of the ventilation and air conditioning system
Assembly and erection of air conveyance ducting .
Fixing of acoustic & thermal insulation on ducting
Erection of MCC panels and laying of electrical and data communication cables.
All cabling storage and local transportation /shifting at site .
Roots Cooling Systems Pvt. Ltd.
M/s G.D. Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .