| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC HOUSE NO 40 CHOTTI BARADARI PART I GARHA ROAD NEAR MEDICAL COLLEGE JALANDHAR PB 144022 | JALANDHAR | JALANDHAR | PUNJAB | 144022 | L1 | Accepted-AOC Bidder is L1 | |
| 2 | L2₹22.9 L+₹1.6 L (7.39%)Rejected-AOC | L2 | Rejected-AOC Bidder is L2 | |
| 3 | L3₹24.6 L+₹3.3 L (15.3%)Rejected-AOC | L3 | Rejected-AOC Bidder is L3 |
Tender Value
₹29.7 L
EMD Value
₹59,420
Closing Date
7 Apr 2025, 6:00 pmClosed
CWE Jalandhar Cantt
HQ CWE Jalandhar Cantt PIN 144005
Provn of OTM accn for Engr Regt arboriculture work at Jalandhar Cantt Phase-II under GE East JRC
2025_MES_700715_1
8324/86/E8
Open Tender
Civil Works
Item Rate
180 days
HQ CWE Jalandhar Cantt
Class D Category a(i) or d (iii) for contractors enlisted with MES
9 documents required · 9 mandatory
₹500
Yes
GE (East) Jalandhar Cantt
₹59,420
Yes
19 Jun 2025
8 Mar 2025
15 Apr 2025
8 Mar 2025
7 Apr 2025
24 Mar 2025
Amount
Surface dressing n.exc. 15 cm deep and getting out in soft/loose soil complete all as sepcified and directed.
M&L 100 mm thick plain cement concrete 1:4:8 type D-2 (using 40mm graded stone agg as in sub base finishing the surface even and rough to receive floor finishes complete all as specified and directed.
M & L for 60mm thick machine pressed precast concerte interlocking paver block M-35 grade complete all as specified.
M & L for sand filling under floors or in talies including watering and consolidation complete all as specified and directed.
M & L for PCC 1:2:4 Type B-1 ( using 20 mm graded stone agg) as in Kerbs , haunching etc. rounded or chamfered on edges complete all as specified and as directed.
Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in soft/loose aoil, seprate the roots/grass and good earth by sieving size, stacking of good earth & mixed with suitable manure of ratio 5.1 including supply of manure, screened through sieve of 1.5 designation 4.75 mm and spreading the mixture of good earth & manure , applying suitable pesticides, watering to a depth of 15cms , including removal of roots/grass out of site material and laying of " DOOB GRASS'/Carpet Grass plantng complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting " Bottle Palm Tree" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting " Bottle brush Tree" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Golden Dorenta Hedge" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Mulberry Tree " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Aricapalm " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Ficus (black) " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Ficus (Panda) " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Champange " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Thuja " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Starlight Ficus" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Snack Plant" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "China Palm" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Bougainvillea" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Rose" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Champa" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Ratrani" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Hibiscus" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Fristle Palm Tree" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Mango Tree" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Sheesham Tree " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Mulberry Tree " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Ashoka " with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Guava" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Keenu" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Lemon" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Neem Plant" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
Excavation in post hole of size not less than 60 cm x 60cm x 60 cm deep or according to the plant size & getting out the existing earth and planting the trees straight inside the pit and filling up the pit with and including the approved earth along with and manure (composit) in the proportion (3:1) and including supply and planting "Amla Tree" with proportionate girth, remove and spread the surplus excavated soil complete as approved and as directed by the Garrison Engineer.
(MAINT AND UPLEEPING OF NEWLY DEVELOPED PLANTS/GARDERN UNDER ITEM NO 6 TO 33 FOR 11 MONTHS)
Day to day maint of newly developed plants/gardens/Tree plants by deploying minimum 01 gardner (experinced Mali) for guarding/ security of the plants/gardern including triming, suitalbe support for trees, etc as required as per standered practice all as specified and all as directed by the Garrison Engineer Note:- (i) Periodical deweeding of unwanted vegitation growth and around the plants and garden area. (ii) Watering all the plants/gardens/trees as required for the proper growth. (iii) Periodical Lawn mowing (iv) Treating the plants and soil with required manure, peesticides and fertilizer including necessary topping of red earth and finally fine dressing , levelling etc. (v) During the maintenance of any plant, if it is found dead , not ture to the name or size as specified or not in stasfactory growth , plant of approved size & shape shall be replaced by the contractor wihout any extra cost to the Department. (vi) Supply and application of manure , sweet earth & pesticides , fertilisers, cartage as required etc are included in quoted unit rate during maint period. (vii) Commencement of maint period of one year will commenced only after certified date of completion of work. (viii) Water will be supplied by MES. (ix) Hose pipe reqd for watering will be provided by the contractor and their cost is deemed to be included in the unit rates quoted by the contractor. (x) Cost of maint and upkeep will be deemed to be included in quoted rates. (xi) Necessary T&P reqd shall be arranged by the contractor
M/S HARBANS SINGH BEDI (BID ID -3274102)
B D BATRA AND SONS (BID ID -3274505)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .