Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
15 Jun 2026, 11:00 am
Executive Engineer
Jal Shakti Division Arki
SH_ Laying Jointing Testing and Commissioning of HDPE and GI Pipe of various dia Class and Grades in distribution network including of field outlet assemblies in 1st call
2026_HPIPH_135454_2
ARK-SOL01-425-8213-63
Open Tender
Civil Works
180 days
Arki
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
₹1.6 L
3 Jun 2026
3 Jun 2026
15 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in trenches,drain chamber in earth work for pipes up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including balling or pumping out water, blasting soft/hard rock of chiseling soft/hard rock where blasting is prohibited in all lifts including jungle clearance wherever required, trimming and dressing of sides, levelling of bends to correct grade including shoring/strutting, planking, timbering & dewatering wherever required stacking the useable/ unusable material/soil separately and after laying, jointing & testing of pipes, returning the useable soil in trenches in 15cm layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil/unusable material as directed by the Engineer-in-Charge with in all leads and lifts complete in all respects with in all leads and lifts as per directions of the Engineer-in-charge. | 10,490 | Cubic Meter | - | - | itemH1Code1 |
| 2Laying, jointing, testing and commissioning at site in trenches ( to level or grade) G.I. pipes of following dia. Heavy/Medium Class confirming to IS-1239 ( Part-1)( latest up to date amendments) of grade and wall thickness as specified below suitable to withstand required hydraulic test pressure as per BIS code in random length of 4m to 6m with plain ends and jointed with MS Flanges conforming to IS-6392-1971 ( latest up to date amendments) and welding of flanges as per IS-816-1969 with electrodes as per IS-814-1991 including required no. and size of MS nut and bolts as per IS-1369-1967 and compressed asbestos fiber jointing gaskets sheets not less than 3mm in thickness as per IS-2712-1998 and butt welded joints. The welding of flanges to be done on both faces in two layers on outer face and one layer on inner face to make the joints leak proof and to the entire satisfaction of the engineer-in-charge. The laying of pipes should be confirmed to IS-5822-1994 ( with latest up to date amendments) and as per CPHEEO manual and will include all operation such as cutting, welding DP tests of butt welded joints , making pipe bevelled for butt welding , fabrication of bends, tees, specials reducers etc. and jointing including flushing, cleaning and hydraulic testing complete in all respect to the entire satisfaction of engineer-in-charge including entire carriage of materials up to all leads and lifts. (Earthwork in trenches, MS Flanges and butt welded joints to be measured and paid for separately) | ||||||
| 2.01 | G.I. Pipe as per IS:1239 (Part-I) :- (Dia-65 mm)(Medium) | 1,913 | Running Meter | - | - | itemH1Code3 |
| 3Laying, jointing and commissioning of HDPE pipe ( High Density Polyethylene pipes) of following diameter and class confirming to IS 4985-2016 with butt fusion welding process including all necessary fitting in all leads and lifts to the entire satisfaction of Engineer-in-charge satisfaction of Engineer-in-charge.( Earth work in trenches to be measured and paid separately). | ||||||
| 3.01 | HDPE pipe, PN-4.0, Pipe grade PE-80, Pipe dia 63 mm | 5,083 | Running Meter | - | - | itemH1Code5 |
| 3.02 | HDPE pipe, PN-4.0, Pipe grade PE-80, Pipe dia 75 mm | 1,110 | Running Meter | - | - | itemH1Code6 |
| 3.03 | HDPE pipe, PN-4.0, Pipe grade PE-80, Pipe dia 90 mm | 284 | Running Meter | - | - | itemH1Code7 |
| 3.04 | HDPE pipe, PN-4.0, Pipe grade PE-80, Pipe dia 110 mm | 231 | Running Meter | - | - | itemH1Code8 |
| 3.05 | HDPE pipe, PN-6.0, Pipe grade PE-100, Pipe dia 63 mm | 2,004 | Running Meter | - | - | itemH1Code9 |
| 3.06 | HDPE pipe, PN-6.0, Pipe grade PE-100, Pipe dia 90 mm | 295 | Running Meter | - | - | itemH1Code10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Form_6_LIS_Bhumti_HDPE.pdf
Tender Documents • 0.50 MB
Form_8_LIS_Bhumti_HDPE.pdf
Tender Documents • 1.44 MB
Term_Condition_LIS_Bhumti_HDPE.pdf
Tender Documents • 0.36 MB
BOQ_200629.xls
BOQ • 0.36 MB