Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.4 LAccepted-Finance | ₹69.4 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹70.1 LAccepted-Finance | ₹70.1 L | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Alagesan Contractor L1 | Perumalsamy Contractor L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Minor Bridge at Singarapettai - Puliyanur Road Near Chennammal Kovil H/o Singarapettai Estimate Amount : Rs.70.000 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 544.44 | Cum | 263.67 ₹1.4 L | 266.47 ₹1.5 L |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 34.98 | Cum | 2,148.5 ₹75,154.53 | 2,171.28 ₹75,951.37 |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 60.24 | Cum | 5,582.6 ₹3.4 L | 5,641.8 ₹3.4 L |
| 5.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 507.06 | Cum | 5,852.49 ₹29.7 L | 5,914.55 ₹30.0 L |
| 6.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Below GL ) | 174.72 | Sqm | 547.28 ₹95,620.76 | 553.08 ₹96,634.14 |
| 7.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Above GL ) | 623.54 | Sqm | 1,094.56 ₹6.8 L | 1,106.17 ₹6.9 L |
| 8.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 7.43 | Mt | 91,821.76 ₹6.8 L | 92,795.46 ₹6.9 L |
| 9.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 25.92 | Cum | 6,873.13 ₹1.8 L | 6,946.01 ₹1.8 L |
| 10.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 56.17 | Cum | 9,302.81 ₹5.2 L | 9,401.46 ₹5.3 L |
Tender Value
₹70 L
EMD Value
₹70,000
Closing Date
24 Dec 2025, 3:00 pmClosed
Block Development Officer
Block Development Officer
Krishnagiri District Uthangarai Block Under Mines and Minerals - 2025- 2026 Construction of Minor Bridge at Singarapettai - Puliyanur road Near Chennammal Kovil at Singarapettai Panchayat Package No 46
2025_RDTN_634881_1
Roc_71_2024_A4_date_19.11.2025
Open Tender
Civil Works - Bridges
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹70,000
BDO office Uthangarai
27 Dec 2025
20 Dec 2025
24 Dec 2025
20 Dec 2025
24 Dec 2025
20 Dec 2025
23 Dec 2025
Amount
1.Construction of Minor Bridge at Singarapettai - Puliyanur Road Near Chennammal Kovil H/o Singarapettai Estimate Amount : Rs.70.000 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Below GL )
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ( Above GL )
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Providing and fixing seepage pipes of 100mm dia PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc, to drain of the back fill in between the abutments and returns
Supplying and fixing of Bitumen pad for expansion joints
Provision for Name Board charges
Provision for Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Perumalsamy Contractor (BID ID -1541695)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
pb46.pdf
Tender Documents • 0.60 MB
tb46.pdf
Tender Documents • 0.83 MB
BOQ_759702.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid