Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹136.4 CrAccepted-AOC | L-1 | Accepted-AOC ok | |
| 2 | L-2₹145.0 Cr+₹8.6 Cr (6.30%)Rejected-Finance | L-2 | Rejected-Finance Decision for L1 is in process. Hence, EMD amount of L2 and L3 is being released | |
| 3 | L-3₹151.0 Cr+₹14.5 Cr (10.7%)Rejected-Finance 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | L-3 | Rejected-Finance Decision for L1 is in process. Hence, EMD amount of L2 and L3 is being released |
Tender Value
₹56.4 Cr
EMD Value
₹28.2 L
Closing Date
10 Sept 2022, 5:55 pmClosed
Executive Engineer
Municipal Corporation Singrauli
Survey, Design, Construction and commissioning of Sewerage Network in SINGRAULI Municipal area
2022_UAD_216489_1
2022/UAD/2869
Open Tender
Civil Works - Others
Lump-sum
540 days
Municipal Corporation Singrauli
refertenderdoc
4 documents required · 4 mandatory
₹50,000
₹28.2 L
Municipal Corporation Singrauli
10 Jul 2023
12 Aug 2022
12 Sept 2022
12 Aug 2022
10 Sept 2022
12 Aug 2022
18 Aug 2022
Amount
Survey, Design, Construction and commissioning of Sewerage Network in SINGRAULI Municipal area including, 1.0 Providing laying and jointing of sewerage pipelines including construction of manholes and sewer appurtenances. 2.0 Construction, supply, erection and commissioning of Sewerage treatment plant and RCC sumpwell along with providing and installation of pumps from sumpwell to STP. 3.0 Providing house sewer chambers and laterals for connecting sewer to consumer sewer lines 4.0 Providing and laying of HT feeder connection upto Sewerage treatment plants 5.0 Providing house sewerage connections
Operation and Maintenance Cost next 10 years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR) (B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consumption
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking Discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Eiffil Construction
KRISHNA CONSTRUCTION CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_253953.xls
BOQ Document • 0.31 MB
103337073.pdf
Tender Document • 0.36 MB
Tenderdocs.pdf
Tender Document • 1.51 MB
AnnexureEdocs.pdf
Tender Document • 0.99 MB
NetworkLayoutandDrawingmerged.pdf
Tender Document • 4.38 MB
103337076.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .