Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹4,900
Closing Date
21 Oct 2026, 3:00 pm
Block Development Officer (V.P),Mandapam
Block Development Office , Mandapam
01/SBM-2026-2027 - Construction of Mini CSC at Govt Hr Sec School in Enmanakondan Panchayat
2026_RDTN_710112_1
T6/1516/2026-SBM-MDM - Pt FC - 2026-2027
Open Tender
Civil Works
Item Rate
Block Development Office, Mandapam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,900
Yes
1 Oct 2026
1 Oct 2026
21 Oct 2026
1 Oct 2026
21 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part I:Construction of Mini Sanitary Complex at Govt Hr Secondry School in Enmanankondan Panchayat | - | - | - | - |
| 2 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation | 13.13 | Cum | - | - |
| 3 | Filling with M.sand as per standard specification including cost and conveyance of all materials to site etc. complete. | 4.11 | Cum | - | - |
| 4 | Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 2.94 | Cum | - | - |
| 5 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all | 12.25 | Cum | - | - |
| 6 | Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete.Below GL | 14.14 | Sq.m | - | - |
| 7 | Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete.Above GL | 28.7 | Sq.m | - | - |
| 8 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 442.63 | kg | - | - |
| 9 | Cement concrete 1:1.5:3 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 5.78 | Cum | - | - |
| 10 | Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 18.95 | Sq.m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Document02.pdf
Tender Documents • 0.39 MB
BOQ_853240.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .