| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | L1 | Accepted-Finance L1 | |
| 2 | L2₹17.0 L+₹1.8 L (11.9%)Rejected-Finance VILL ODDI P O KIAR TEHSIL THEOG DISTT SHIMLA H P | L2 | Rejected-Finance L2 | |
| 3 | L3₹17.4 L+₹2.2 L (14.4%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹17.5 L+₹2.3 L (15.3%)Rejected-Finance VILLAGE GOLHUIEN PO KILOD TEHSIL DISTT CHAMBA HP | CHAMBA | CHAMBA | HIMACHAL PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹18.7 L+₹3.5 L (23.2%)Rejected-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | L5 | Rejected-Finance L5 |
Tender Value
₹28.9 L
EMD Value
₹43,870
Closing Date
14 Sept 2023, 5:00 pmClosed
Executive Engineer
Jal Shakti Division No-I Kasumpati Shimla-9
.
2023_HPIPH_78545_1
Kasumpti/Shimla/FIS Patara/28.87
Open Tender
Civil Works - Water Works
Item Rate
180 days
Shimla
Please refer Tender documents.
6 documents required · 6 mandatory
₹400
EE Jal Shakti Division No-I
₹43,870
Yes
28 Dec 2023
6 Sept 2023
15 Sept 2023
6 Sept 2023
14 Sept 2023
6 Sept 2023
Amount
Excavation in drains and channels etc. in earth work for pipes upto all depth in all classification of earth work such as pick work, jumper work, saturated soil i/c balling or pumping out water , blasting soft /hard rock or chiseling soft/ hard rock where blasting is prohibited in all lifts including jungle clearance wherever required, trimming and dressing of sides ,levelling of beds to correct grade including shoring /struting ,planking ,timbering and dewatering wherever required stacking the useable /unusable material/soil seperately and after laying,jointing and testing of pipes ,returning the useable soil in treches in 15 cm layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including restoration of un-metalled surfaces to its orginal condition and including cost of diversion for traffic, night signals,fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respect whithin all leads and lifts as per direction of the Engineer-in-charge.
Laying and jointing high density polyethelene pipes for use of buried water mains and services duly ISI marked (IS: 4984-1995 as amended upto date in the following grades of material, pressure rating and nominal dia. Material grade PE-80 PN-6 including all leads and lifts as directed by the Engineer-in-charge.
75 mm dia
90 mm dia
110 mm dia
125 mm dia
140 mm dia
Excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work,jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.
Providing and laying cement concrete 1:4:8 (1cement:4sand:8graded stone agg. 40 mm nominal size)and curing complete excluding cost of form work i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge in :-a) Foundation and plinth.
Providing and laying cement concrete work 1:1 1/2: 3(1cement:1 1/2sand:3 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-charge.
a) In foundation and plinth.
b) Walls (any thickness) but not less than 0.1m thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level.
Providing and laying cement concrete work 1:2:4(1cement:2sand:4 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-charge:-
a) Suspended floors, roofs, landings,shelves and their supports balconies, beams, girders, bressumers and cantilevers upto floor two level.
Providing Mild steel/Tor steel reinforced for RCC work including bending, binding and placing in position complete upto floor two level i/c all leads and lifts complete in all respect. :-a) Tor steel.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting , strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge.
Vertical surfaces such as circular walls (any thickness) ,partitions and the like including attached pillasters,buttresses, plinth and string courses and the like.
Flat surfaces such as soffits of suspended floors,roofs, landings, and the like:-i)Floors etc. upto 200mm in thickness.
Edges of slabs and breaks in Floor and walls :- Under 20cm wide.
Sandeep Verma
BALDEV CHAUHAN
Kamlesh Kumar
Suresh Kumar
Rajesh Bhandari
HARSHIT SHARMA
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .