Loading…
Loading…
Tender Value
₹28.0 L
EMD Value
₹27,970
Closing Date
16 Jul 2026, 5:00 pm4d left
Divisional Officer
RURAL WORKS DIVISION, DHENKANAL
Deopada - Talbarkote road_Road_Paver Block and RCC Drain _1.400 to 1.800 1.400 to 1.600
2026_CERWI_134600_1
Online TCN-04/26-27
Open Tender
Civil Works - Roads
60 days
Dhenkanal
2 documents required · 2 mandatory
₹6,000
₹27,970
Yes
7 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
7 Jul 2026 - 15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 but excluding the charges of GST etc. complete & as per direction of the Engineer-in-Charge. | 700 | sqm | 8.63 | ₹6,041 |
| 2 | Earthwork in excavation for foundation of in hard soil including dressing and leveling the bed fit for laying concrete and deposited the excavated materials away from work site etc complete. | 244.25 | cum | 282.88 | ₹69,093.44 |
| 3 | Filling Foundation & Plinth with sand watered and rammed including cost of sand, conveyance of material, labour, T & P etc. complete. | 133.92 | cum | 830.75 | ₹1,11,254.04 |
| 4 | Cement Concrete (1:3:6) using 40mm and down graded hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 80.85 | cum | 5,861.63 | ₹4,73,912.79 |
| 5 | Cement Concrete (1:2:4) using 12mm hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 106.78 | cum | 7,682.19 | ₹8,20,304.25 |
| 6 | Supplying cutting bending straightening placing & binding of uncoated HYSD bar reinforcement complete as per drawing and technical specification. | 53.39 | qtl | 9,686.26 | ₹5,17,149.42 |
| 7 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required attern etc. complete in all respect conforming to IRC
SP - 63:2018. | 1,312.5 | sqm | 608.4 | ₹7,98,525 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 1.60 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_599925.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid