| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC KHASRA NO 974 NH 24 MEHRAULI GHAZIABAD UTTAR PRADESH | MEHRAULI | GHAZIABAD | UTTAR PRADESH | ₹3.9 Cr | L1 | Accepted-AOC FIRST LOWEST |
| 2 | L2₹4.1 Cr+₹25.5 L (6.59%)Rejected-Finance NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹4.1 Cr+₹25.5 L (6.59%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹4.2 Cr+₹32.3 L (8.34%)Rejected-Finance | ₹4.2 Cr+₹32.3 L (8.34%) | L3 | Rejected-Finance THIRD LOWEST |
| 4 | L4₹4.3 Cr+₹41.4 L (10.7%)Rejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹4.3 Cr+₹41.4 L (10.7%) | L4 | Rejected-Finance FOURTH LOWEST |
| 5 | L5₹4.5 Cr+₹62.1 L (16.1%)Rejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹4.5 Cr+₹62.1 L (16.1%) | L5 | Rejected-Finance FIFTH LOWEST |
| Sl No | Description | Qty | Unit | M/S KOSHER CONSTRUCTION PVT. LTD. L1 | M/S J.V. CONSTRUCTION L3 | Durga Engineers and Earth Movers L5 | M/S UNITE ENTERPRISES L4 | GSB DEVELOPERS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds & Moonj with proper disposal including back filling & dressing ete complete all as specified and as directed by engineer in charge. | 11,832 | Nos | 30 ₹3,54,960 | 16 ₹1,89,312 | 10 ₹1,18,320 | 4.8 ₹56,793.6 Lowest | 20 ₹2,36,640 |
| 2.00 | Earth Work in Excavation of Foundation in dry ordinary soil including lift upto 1.5 M and Lead upto 30 M and including filling, watering and ramming excavated earth into the trenched or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth. complete all as specified and as directed by engineer in charge. | 4,686 | cum | 65 ₹3,04,590 | 70 ₹3,28,020 | 55 ₹2,57,730 | 62.1 ₹2,91,000.6 | 50 ₹2,34,300 Lowest |
| 3.00 | Laying C.C (M-10) with cement, coarse sand & stone grit with all cost of labour, material and T & P etc complete all as specified and as directed by engineer in charge | 1,350 | cum | 4,500 ₹60,75,000 | 640 ₹8,64,000 Lowest | 4,400 ₹59,40,000 | 4,750 ₹64,12,500 | 4,200 ₹56,70,000 |
| 4.00 | 1st class brick (M-100) work in 1:4 cement and coarse sand mortar with all cost of material, labour and T&P etc. complete all as specified and as directed by engineer in charge | 604 | cum | 5,500 ₹33,22,000 | 5,000 ₹30,20,000 Lowest | 5,200 ₹31,40,800 | 5,445 ₹32,88,780 | 5,100 ₹30,80,400 |
| 5.00 | Supplying and Laying 125 Micron LDPE Film under CC Lining Side Slope of Canal including cost of all material, labour and T&P ete, complete all as specified and as directed by engineer in charge | 26,034 | Sqm | 10 ₹2,60,340 Lowest | 11 ₹2,86,374 | 30 ₹7,81,020 | 12.5 ₹3,25,425 | 50 ₹13,01,700 |
| 6.00 | Supplying Fine Sand Filter including cost of all material, labour and T&P etc. complete all as specified and as directed by engineer in charge. | 1,925 | Sqm | 200 ₹3,85,000 | 15 ₹28,875 Lowest | 170 ₹3,27,250 | 32 ₹61,600 | 50 ₹96,250 |
| 7.00 | Laying 75 mm thick C. C Lining in (M-15) with cement, coarse sand & stone grit (10 to 20 mm size) with all cost of materal labour, shuttring and T & P etc complete all as specified and as directed by engineer in charge. | 14,769 | Sqm | 430 ₹63,50,670 Lowest | 600 ₹88,61,400 | 650 ₹95,99,850 | 480 ₹70,89,120 | 550 ₹81,22,950 |
| 8.00 | Chequerred precast cement concrete double tiles 22 mm thick, jointed with neat cement slurry mixed with ordinary cement without any pigment of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar & 15 mm thick sand witch & over 5mm thick C.M. 1:4 (1 cement: 4 coarse sand). etc all complete all as specified and as directed by engineer in charge. | 22,380 | sqm | 540 ₹1,20,85,200 Lowest | 800 ₹1,79,04,000 | 600 ₹1,34,28,000 | 672 ₹1,50,39,360 | 600 ₹1,34,28,000 |
| 9.00 | C.C. (M-15) for Toe wall with cement, coarse sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour. shuttring and T&P complete all as specified and as directed by engineer in charge. | 1,500 | Cum | 5,500 ₹82,50,000 | 6,000 ₹90,00,000 | 5,450 ₹81,75,000 | 5,650 ₹84,75,000 | 5,000 ₹75,00,000 Lowest |
| 10.00 | C.C. (M-15) for sleeper with cement, coarse sand, Crushed stone Aggregate 10 to 25 min i/c cost of all Material Labssur, shuttring and T&P complete all as specified and as directed by engineer in charge. | 180 | Cum | 6,000 ₹10,80,000 | 6,000 ₹10,80,000 | 5,000 ₹9,00,000 Lowest | 6,850 ₹12,33,000 | 5,000 ₹9,00,000 Lowest |
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
31 Oct 2025, 3:00 pmClosed
SE IWC MATHURA
SE IWC CIVIL LINE MATHURA
C.C. Lining work from Km 0.000 to Km 1.500 of Mat Feeder.
2025_UPIDC_1084062_2
08/SE/2025-26
Open Tender
Civil Works
Item Wise
180 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,944
₹11.2 L
SE IWC MATHURA
8 Dec 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
27 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
all.pdf
Tender Documents • 5.29 MB
BOQ_1986342.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .