Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹82,146.88Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹82,146.88 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹82,146.88Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹82,146.88 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹91,183.03+₹9,036.16 (11.0%)Admitted-Fee/PreQual/Technical/Finance MIRMAIDAN DOORU TEHSIL DOORU JAMMU AND KASHMIR | -0.10% | ₹91,183.03+₹9,036.16 (11.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹91,000
EMD Value
₹2,730
Closing Date
27 Jul 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O FOOT PATH FROM XING TO AB RASHID BHAT WARD NO. 7 BLOCK BRENG
2026_RDPR_316818_47
ENIT69of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹2,730
29 Jul 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1 metres: Ordinary soil | - | Cum | - | - |
| 0.0 | P/L of stone soling in bed tightly hand packed including carriage of 15 km | - | Cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6). | - | Cum | - | - |
| 0.0 | P/F of shuttering using ordinary timber planks of wood including its removal. | - | SQM | - | - |
| 0.0 | carriage of materials by M.T | - | - | - | - |
| 0.0 | Sand /AGGREGATE carriage Lead 40kms | - | cum | - | - |
| 0.0 | cement shuttering carriage and execution of any unforseen items | 1 | job | - | - |
| 0.0 | Provision for signboard & photographs , | 1 | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1035970.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .