| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.1 LAccepted-AOC | ₹12.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹12.4 LRejected-AOC 23 VEERAPANDIYAPURAM WEST STREET VEERAPANDIYAPURAM WEST DEVAKOTTAI SIVAGANGAI 630302 TAMILNADU | SIVAGANGA | TAMIL NADU | 630302 | ₹12.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ALAGAR AND CO L2 | MARUTHI AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Providing BT road from Udumalai munar main road (Revenue nagar) to Kalaigar nagar main road at Bodipatti Panchayat. | 1 | Nos | - | - |
| 2.00 | Clearing the Light jungle including all labour charges for burying and burning etc., complete. | 252 | Sqm | 9 ₹2,268 | 6.36 ₹1,602.72 Lowest |
| 3.00 | Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders | 73.5 | Cum | 515 ₹37,852.5 | 510.88 ₹37,549.68 Lowest |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. ll other incidental charges etc., complete | 164.06 | Nos | 2,580 ₹4,23,274.8 | 2,576.21 ₹4,22,653.01 Lowest |
| 5.00 | Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,312.5 | Sqm | 95 ₹1,24,687.5 | 89.51 ₹1,17,481.88 Lowest |
| 6.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,312.5 | Sqm | 25 ₹32,812.5 | 21.12 ₹27,720 Lowest |
| 7.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 1,312.5 | Sqm | 325 ₹4,26,562.5 | 320.62 ₹4,20,813.75 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,88,542 ₹1,88,542 | 1,85,008 ₹1,85,008 Lowest |
Tender Value
₹12.3 L
EMD Value
₹12,300
Closing Date
26 Feb 2026, 3:00 pmClosed
BDO VP, Udumalpet
Union Office, Udumalpet
Providing BT road from Udumalai munar main road (Revenue nagar) to Kalaigar nagar main road at Bodipatti Panchayat.
2026_RDTN_662824_1
605/2026/B4 14.02.2026
Open Tender
Civil Works
Works
Udumalpet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,300
Yes
24 Jun 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
Providing BT road from Udumalai munar main road (Revenue nagar) to Kalaigar nagar main road at Bodipatti Panchayat.
Clearing the Light jungle including all labour charges for burying and burning etc., complete.
Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. ll other incidental charges etc., complete
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
TB1.pdf
Tender Documents • 0.59 MB
BOQ_795724.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].