Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹19.4 L+₹3,437.12 (0.18%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹19.7 L+₹34,996.18 (1.81%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical The Bidder has been non responsive |
Tender Value
₹31.3 L
EMD Value
₹62,500
Closing Date
24 Jun 2026, 4:00 pmClosed
Er. Mohd Qasim
Executive Engineer PWD R and B Division Billawar
Please refer in BOQ
2026_PWDJK_312887_1
e-NIT No 33 of 2026-27 dated 18-06-2026
Open Tender
Civil Works
Percentage
365 days
Billawar
Please refer Tender documents
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division Billawar
₹62,500
2 Jul 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement.
A) 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 44.35 | Cum | 9,395.7 | ₹4,16,699.3 |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement withA) 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 68.82 | Cum | 9,821.85 | ₹6,75,939.72 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level A) Cold twisted bars. | 10,468.23 | kg | 123.2 | ₹12,89,685.94 |
| 4Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 4.01 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 165.61 | sqm | 577.55 | ₹95,648.06 |
| 4.02 | Columns, pillars, piers, abutments, posts and struts. | 147.21 | sqm | 742.55 | ₹1,09,310.79 |
| 4.04 | Suspended floors, roofs, landings, balconies and access platforms | 451.67 | sqm | 718.2 | ₹3,24,389.39 |
| 4.05 | Edges of slabs and breaks in floors and walls Under 20 cm wide | 87.8 | mtr | 262.2 | ₹23,021.16 |
| 5 | Providing and laying Inugration stone,complete job.(LMR) | 1 | no. | 10,000 | ₹10,000 |
| 6 | Providing and fixing electric points, complete job.(LMR) | 1 | no. | 1,00,000 | ₹1,00,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_1012662.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .