Tender Value
Refer Docs
Closing Date
1 Jul 2021, 3:00 pmClosed
PR & CC
Evaluation Criteria : Schedule Wise lowest Cost Basis.Award Criteria: 100% to L1 for respective
21000222-HD-10157
21000222-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
1 Jul 2021
10 Jun 2021
1 Jul 2021
1 Jul 2021
10 Jun 2021 - 19 Jun 2021
18 Jun 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SPLY&TRANSPT OF 12IN | SPLY&TRANSPT OF 12IN — SUPPLY AND TRANSPORTATION OF 12 IN PIPELINE: MANUFACTURING, INSPECTION, TESTING, SUPPLY, TRANSPORTATION, UNLOADING AND STACKING OF 12 IN OUTSIDE DIAMETER, 6.4 MM THICKNESS CARBON STEEL LINE PIPES WITH 3LPE COATING, CONFORMING TO API 5L GR. X56, PSL 2, OF HFW OR SEAMLESS TYPES TO STORAGE YARD IN SPECIFIED REGION AS DEFINED IN BID DOCUMENT. | - | Meters |
| 2 | DEVEL OF PL STRG YRD : | DEVEL OF PL STRG YRD : — DEVELOPMENT AND MAINTENANCE OF STOCKYARD GA-50, STORAGE AND HANDLING OF 4 INCH PIPE, MECHANICAL/PIPE LAYING: DEVELOPMENT OF PIPELINE STORAGE YARD INCLUDING ACQUISITION/RENTAL/PURCHASE/LEASED ADEQUATE OF LAND PARCEL FOR A PERIOD OF 12 MONTHS BEYOND A DURATION OF 3 MONTHS FROM DATE OF LOA IN GA-50 FOR STORAGE 4 INCH DIAMETER X 14000 METERS AND 12 INCH DIAMETER X 52500 METERS. THE SCOPE ALSO INCLUDES MAINTENANCE OF THE STOCK YARD, STORAGE OF PIPES, PRESERVATION AND SAFETY, MAINTENANCE OF STOCK REGISTER AND LOADING/UNLOADING OF PIPES ON OR FROM TRAILERS OF PIPE LAYING CONTRACTOR AS AND WHEN THE LAYING CONTRACTOR APPROACHES/REPORTS AT THE STOCK YARD. NECESSARY MANPOWER FOR OPERATING AND MAINTENANCE OF STOCK YARD INCLUDING THE MACHINERIES REQUIRED ARE IN THE SCOPE OF VENDOR. THE VENDOR ALSO NEEDS TO INDEMNIFY HPCL FOR ANY LOSS OR DAMAGE OF PIPELINE STORED IN THE STOCKYARD IN THE FORM OF BG EQUIVALENT OF THE COST OF MATERIAL STORED IN THE STOCK YARD VALID FOR A PERIOD OF (12+3) MONTHS FROM THE DATE OF COMMENCEMENT. | - | Running Meter |
| 3 | DEVEL OF PL STRG YRD | DEVEL OF PL STRG YRD — DEVELOPMENT AND MAINTENANCE OF STOCKYARD GA-50, STORAGE AND HANDLING OF 12 INCH PIPE, MECHANICAL/PIPE LAYING: DEVELOPMENT OF PIPELINE STORAGE YARD INCLUDING ACQUISITION/RENTAL/PURCHASE/LEASED ADEQUATE OF LAND PARCEL FOR A PERIOD OF 12 MONTHS BEYOND A DURATION OF 3 MONTHS FROM DATE OF LOA.. THE SCOPE ALSO INCLUDES MAINTENANCE OF THE STOCK YARD, STORAGE OF PIPES, PRESERVATION AND SAFETY, MAINTENANCE OF STOCK REGISTER AND LOADING/UNLOADING OF PIPES ON OR FROM TRAILERS OF PIPE LAYING CONTRACTOR AS AND WHEN THE LAYING CONTRACTOR APPROACHES/REPORTS AT THE STOCK YARD. NECESSARY MANPOWER FOR OPERATING AND MAINTENANCE OF STOCK YARD INCLUDING THE MACHINERIES REQUIRED ARE IN THE SCOPE OF VENDOR. THE VENDOR ALSO NEEDS TO INDEMNIFY HPCL FOR ANY LOSS OR DAMAGE OF PIPELINE STORED IN THE STOCKYARD IN THE FORM OF BG EQUIVALENT OF THE COST OF MATERIAL STORED IN THE STOCK YARD VALID FOR A PERIOD OF (12+3) MONTHS FROM THE DATE OF COMMENCEMENT. Schedule B Manadatory: No | - | Running Meter |
| 1 | SUPPLY OF CARBON STEEL | SUPPLY OF CARBON STEEL — MANUFACTURING, INSPECTION, TESTING, SUPPLY, TRANSPORTATION, UNLOADING & STACKING OF 8 INCH, 6.4MM THK CARBON STEEL LINE PIPES WITH 3LPE COATING, CONFORMING TO API 5L GR. X52, PSL 2, OF HFW OR SEAMLESS TYPES TO STORAGE YARD IN SPECIFIED REGION AS DEFINED IN BID DOCUMENT. Schedule C Manadatory: No | - | Meters |
| 1 | SPLY&TRANSPT OF 10IN | SPLY&TRANSPT OF 10IN — SUPPLY OF CARBON STEEL 10 IN DIAMETER: MANUFACTURING, INSPECTION, TESTING, SUPPLY, TRANSPORTATION, UNLOADING AND STACKING OF 10 INCH, 6.4 MM THICKNESS CARBON STEEL LINE PIPES WITH 3 LPE COATING, CONFORMING TO API 5L GR. X56, PSL 2, OF HFW OR SEAMLESS TYPES TO STORAGE YARD IN SPECIFIED REGION AS DEFINED IN BID DOCUMENT. | - | Meters |
| 2 | DEVEL OF PL STRG YRD : | DEVEL OF PL STRG YRD : — DEVELOPMENT AND MAINTENANCE OF STOCKYARD GA-47, STORAGE AND HANDLING OF 4 INCH PIPE, MECHANICAL/PIPE LAYING: DEVELOPMENT OF PIPELINE STORAGE YARD INCLUDING ACQUISITION/RENTAL/PURCHASE/LEASED ADEQUATE OF LAND PARCEL FOR A PERIOD OF 12 MONTHS BEYOND A DURATION OF 3 MONTHS FROM DATE OF LOA IN GA-47 FOR STORING 4 INCH DIAMETER X 4000 METERS, 8 INCH DIAMETER X 44100 METERS AND 10 INCH DIAMETER X 31500 METERS. THE SCOPE ALSO INCLUDES MAINTENANCE OF THE STOCK YARD, STORAGE OF PIPES, PRESERVATION AND SAFETY, MAINTENANCE OF STOCK REGISTER AND LOADING/UNLOADING OF PIPES ON OR FROM TRAILERS OF PIPE LAYING CONTRACTOR AS AND WHEN THE LAYING CONTRACTOR APPROACHES/REPORTS AT THE STOCK YARD. NECESSARY MANPOWER FOR OPERATING AND MAINTENANCE OF STOCK YARD INCLUDING THE MACHINERIES REQUIRED ARE IN THE SCOPE OF VENDOR. THE VENDOR ALSO NEEDS TO INDEMNIFY HPCL FOR ANY LOSS OR DAMAGE OF PIPELINE STORED IN THE STOCKYARD IN THE FORM OF BG EQUIVALENT OF THE COST OF MATERIAL STORED IN THE STOCK YARD VALID FOR A PERIOD OF (12+3) MONTHS FROM THE DATE OF COMMENCEMENT. | - | Running Meter |
| 3 | DEVEL OF PL STRG YRD : | DEVEL OF PL STRG YRD : — DEVELOPMENT AND MAINTENANCE OF STOCKYARD GA-47, STORAGE AND HANDLING OF 8 INCH PIPE, MECHANICAL/PIPE LAYING: DEVELOPMENT OF PIPELINE STORAGE YARD INCLUDING ACQUISITION/RENTAL/PURCHASE/LEASED ADEQUATE OF LAND PARCEL FOR A PERIOD OF 12 MONTHS BEYOND A DURATION OF 3 MONTHS FROM DATE OF LOA IN GA-47 FOR STORAGE 4 INCH DIAMETER X 4000 METERS, 8 INCH DIAMETER X 44100 METERS AND 10 INCH DIAMETER X 31500 METERS. THE SCOPE ALSO INCLUDES MAINTENANCE OF THE STOCK YARD, STORAGE OF PIPES, PRESERVATION AND SAFETY, MAINTENANCE OF STOCK REGISTER AND LOADING/UNLOADING OF PIPES ON OR FROM TRAILERS OF PIPE LAYING CONTRACTOR AS AND WHEN THE LAYING CONTRACTOR APPROACHES/REPORTS AT THE STOCK YARD. NECESSARY MANPOWER FOR OPERATING AND MAINTENANCE OF STOCK YARD INCLUDING THE MACHINERIES REQUIRED ARE IN THE SCOPE OF VENDOR. THE VENDOR ALSO NEEDS TO INDEMNIFY HPCL FOR ANY LOSS OR DAMAGE OF PIPELINE STORED IN THE STOCKYARD IN THE FORM OF BG EQUIVALENT OF THE COST OF MATERIAL STORED IN THE STOCK YARD VALID FOR A PERIOD OF (12+3) MONTHS FROM THE DATE OF COMMENCEMENT. | - | Running Meter |
| 4 | DEVEL OF PL STRG YRD | DEVEL OF PL STRG YRD — DEVELOPMENT AND MAINTENANCE OF STOCKYARD GA-47, STORAGE AND HANDLING OF 10 INCH PIPE, MECHANICAL/PIPE LAYING: DEVELOPMENT OF PIPELINE STORAGE YARD INCLUDING ACQUISITION/RENTAL/PURCHASE/LEASED ADEQUATE OF LAND PARCEL FOR A PERIOD OF 12 MONTHS BEYOND A DURATION OF 3 MONTHS FROM DATE OF LOA IN GA-47 FOR STORAGE 4 INCH DIAMETER X 4000 METERS, 8 INCH DIAMETER X 44100 METERS AND 10 INCH DIAMETER X 31500 METERS. THE SCOPE ALSO INCLUDES MAINTENANCE OF THE STOCK YARD, STORAGE OF PIPES, PRESERVATION AND SAFETY, MAINTENANCE OF STOCK REGISTER AND LOADING/UNLOADING OF PIPES ON OR FROM TRAILERS OF PIPE LAYING CONTRACTOR AS AND WHEN THE LAYING CONTRACTOR APPROACHES/REPORTS AT THE STOCK YARD. NECESSARY MANPOWER FOR OPERATING AND MAINTENANCE OF STOCK YARD INCLUDING THE MACHINERIES REQUIRED ARE IN THE SCOPE OF VENDOR. THE VENDOR ALSO NEEDS TO INDEMNIFY HPCL FOR ANY LOSS OR DAMAGE OF PIPELINE STORED IN THE STOCKYARD IN THE FORM OF BG EQUIVALENT OF THE COST OF MATERIAL STORED IN THE STOCK YARD VALID FOR A PERIOD OF (12+3) MONTHS FROM THE DATE OF COMMENCEMENT. Schedule D Manadatory: No | - | Running Meter |
| 1 | SUPPLY OF CARBON STEEL | SUPPLY OF CARBON STEEL — MANUFACTURING, INSPECTION, TESTING, SUPPLY, TRANSPORTATION, UNLOADING & STACKING OF 4 INCH, 6.4MM THK CARBON STEEL LINE PIPES WITH 3LPE COATING, CONFORMING TO API 5L GR. X52, PSL 2, OF HFW OR SEAMLESS TYPES TO STORAGE YARD IN SPECIFIED REGION AS DEFINED IN BID DOCUMENT. | - | Meters |
| 2 | SUPPLY OF CARBON STEEL | SUPPLY OF CARBON STEEL — MANUFACTURING, INSPECTION, TESTING, SUPPLY, TRANSPORTATION, UNLOADING & STACKING OF 4 INCH, 6.4MM THK CARBON STEEL LINE PIPES WITH 3LPE COATING, CONFORMING TO API 5L GR. X52, PSL 2, OF HFW OR SEAMLESS TYPES TO STORAGE YARD IN SPECIFIED REGION AS DEFINED IN BID DOCUMENT. | - | Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000222-HD-10157.pdf
TENDER_DOCUMENT • 11.99 MB
Download all tender documents and submit your bid