| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC 52 1 RAKSHIT PARA RD KOLKATA 61 WEST BENGAL | KOLKATA | WEST BENGAL | 700061 | ₹7.6 L Quoted ₹7.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.5 L+₹32,155.32 (4.50%)Rejected-Finance 6 3 EAST PHOOL BAGAN KOLKATA KOLKATA 700086 | KOLKATA | WEST BENGAL | 700086 | ₹7.5 L+₹32,155.32 (4.50%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.6 L+₹45,017.45 (6.30%)Rejected-Finance AKRA KRISHNANAGAR MAHESHTALA KOLKATA 140 | KOLKATA | WEST BENGAL | 700001 | ₹7.6 L+₹45,017.45 (6.30%) | L3 | Rejected-Finance L3 |
Tender Value
₹7.1 L
EMD Value
₹14,300
Closing Date
14 Feb 2026, 9:00 amClosed
D.G. (UTTARAN SERVICES)
516, D. H. ROAD, KOL-34
CONSTRUCTION OF SANITARY LATRINE AT SARSUNA DIFFERENT LOCATIONS ( SLUM AREA ) IN WARD NO-127.
2026_KMC_1000267_1
KMC/DG(US)/XIV/127/162/25-26
Open Tender
CIVIL WORKS
Percentage
30 days
WARD-127
PLEASE REFER TENDER DOCUMENTS.
5 documents required · 5 mandatory
₹0
₹14,300
3 May 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
14 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 7.83 | CUBIC METER PERCENT | 119.27 | ₹933.51 |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor | 1.57 | CUBIC METER PERCENT | 77.54 | ₹121.37 |
| 3 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(1).25mm.
thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Waterproofing as per item 9, polymer based paint as per item 8 (a) of subhead C of Section (C). | 1.5 | CUBIC METER PERCENT | 936.21 | ₹1,406.95 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 33.84 | SQUARE METER | 358 | ₹12,114 |
| 5 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND
FLOOR AS PER RELEVANT IS CODES | 2 | CUBIC METER | 4,572 | ₹9,161.15 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor
steel/Mild Steel.I. SAIL/ TATA/RINL. | 5.59 | CUBIC METER | 4,373 | ₹24,442.88 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing
and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by
150%. | 8.44 | CUBIC METER | 5,575 | ₹47,049.52 |
| 8 | SECTION 1 BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 4.2 | CUBIC METER | 5,798 | ₹24,351.6 |
| 9 | SECTION 1 BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster | 4.68 | SQUARE METER | 186 | ₹870.71 |
| 10 | SECTION 1 BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster | 48.77 | SQUARE METER | 724 | ₹35,311.29 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
civil.pdf
Additional Documents • 3.53 MB
TForm.pdf
Tender Documents • 0.38 MB
BOQ_2450599.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .