Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹3.2 L (2.50%)Admitted-Finance | ₹1.3 Cr+₹3.2 L (2.50%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹7.8 L (6.12%)Admitted-Finance | ₹1.3 Cr+₹7.8 L (6.12%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹8.3 L (6.53%)Admitted-Finance | ₹1.4 Cr+₹8.3 L (6.53%) | L4 | Admitted-Finance |
| 5 | L5₹1.4 Cr+₹11.2 L (8.82%)Admitted-Finance | ₹1.4 Cr+₹11.2 L (8.82%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NACHIKETA TECHNOLOGY L3 | JAY AAR ENTERPRISES L5 | Ms R K Gupta and Co L4 | JAIMA ELECTRICALS L1 | R R CONSTRUCTION L6 | M/s cee kay Traders L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | 1. PITC of 1 No. Submersible Pumping Units 4000 GPH × 80 mtr head for existing T/well Targwal under WSS SUNAIL JAYANTI
2. PITC of H C Pump set (2 no.) unit for existing T/well Targwal under WSS SUNAIL JAYANTI
3. PITC of 100 KVA voltage stabilizer for existing T/well targwal under WSS SUNAIL JAYANTI
4. Design, installation, testing and commissioning of LT control/dry starter panel for the operation of H.C. induction Motor and Submersible motor for existing T/well Targwal under W S S SUNAIL JAYANTI
5. PITC of H C Pump set (1 no.) unit for existing P/Stn. Kumar Mohalla Old under WSS SUNAIL JAYANTI
6. PITC of 100 KVA voltage stabilizer for existing P/ Stn Kumar Mohalla Old under WSS SUNAIL JAYANTI
7. Design, installation, testing and commissioning of LT control panel for the operation of H.C. induction Motor for existing p/stn. Kumar Mohalla Old under WSS SUNAIL JAYANTI
8. PITC of H C Pump set (1 no.) unit for existing .P/Stn. Jyanti Old under WSS SUNAIL JAYANTI
9. PITC of 100 KVA voltage stabilizer for existing P/ Stn Jyanti Old under WSS SUNAIL JAYANTI
10. Design, installation, testing and commissioning of LT control panel for the operation of H.C. induction Motor for existing P/stn. Jyanti Old under WSS SUNAIL JAYANTI | 1 | Nos | 53,99,449 ₹53,99,449 | 71,00,000 ₹71,00,000 | 46,25,000 ₹46,25,000 Lowest | 51,28,000 ₹51,28,000 | 71,00,000 ₹71,00,000 | 57,29,000 ₹57,29,000 |
| 2.00 | 1. Upgradation of existing transformer 63 K V A to 100 k V A Transformer P/Stn. Jyanti Old under WSS SUNAIL JAYANTI
2. PITC of 3000 GPH x 80 mtr head Submersible pump sets along with allied works =2 nos.at T/Well Chage da Mohalla (New Borewell)
3. Designing fabrication, installation, testing and commissioning of 1 no.(one incoming and one outgoing) LT control panel fully automatic LT control panel for. Chage da Mohalla (New Borewell)
4. PITC of 63 KVA voltage stabilizeralong with allied works. Chage da Mohalla (New Borewell)
5. PITC of 3000GPH x120 mtr head Submersible pump sets along with allied works =2 nos.at Station A (Ram lal Mohalla) new borewell
6. Designing fabrication, installation, testing and commissioning of 1 no (one incoming and one outgoing) LT control panel fully automatic LT control panel for. Station A (Ram lal Mohalla) new borewell
7. PITC of 63 KVA voltage stabilizer along with allied works. Station A (Ram lal Mohalla) new bore
8. PITC of 3000GPH x 120 mtr head Submersible pump sets along with allied works =2 nos.at Malpur Chandian (New Borewell)
9. Designing fabrication, installation, testing and commissioning of 1 no. (one incoming and one outgoing) LT control panel fully automatic LT control panel for Malpur Chandian (New Borewell)
10. PITC of 100 KVA voltage stabilizer along with allied works Malpur Chandian (New Borewell)
11. Upgradation of existing substation to 250 KVA along with allied works at Malpur Chandian (new borewell)
12. PITC of 3000GPH x 80 mtr head Submersible pump sets along with allied works =2 nos. at Station B (Near high school Chandian) new borewell
13. Designing fabrication, installation, testing and commissioning of 1 no. (one incoming and one outgoing) LT control panel fully automatic LT control panel for. Station B (Near high school Chandian) new borewell.
14. PITC of 63 KVA voltage stabilizer along with allied works at Station B (Near high school Chandian) new borewell | 1 | Nos | 54,99,449 ₹54,99,449 | 52,00,000 ₹52,00,000 Lowest | 64,25,000 ₹64,25,000 | 54,48,000 ₹54,48,000 | 52,50,000 ₹52,50,000 | 54,29,000 ₹54,29,000 |
| 3.00 | 1. PITC of 2 No. Submersible Pumping Units for new B/well-I Garkhal under WSS Garkhal
2. Design, fabrication, installation, testing and commissioning of dry starter panel for the operation of Submersible motor for new B/well-I Garkhal under WSS Garkhal
3. PITC of 100 KVA voltage stabilizer for new B/well-l Garkhal under WSS Garkhal
4. PITC of 2 No. Submersible Pumping Units for new B/well-II Garkhal under WSS Garkhal
5. Design, fabrication, installation, testing and commissioning of dry starter panel for the operation of Submersible motor for new B/well-II Garkhal under WSS Garkhal | 1 | Nos | 25,49,449 ₹25,49,449 | 14,90,000 ₹14,90,000 Lowest | 24,50,000 ₹24,50,000 | 20,96,800 ₹20,96,800 | 16,50,000 ₹16,50,000 | 18,31,000 ₹18,31,000 |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
19 Feb 2024, 4:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti PHE Division Akhnoor
PITC of pumping machinery under WSS Sunail Jayanti, WSS Malpur Chandian and WSS Garkhal
2024_PHE_244755_2
ENIT 71
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
120 days
Akhnoor
as per SBD and SOW
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti PHE Division Akhnoor
₹2.7 L
Yes
26 Feb 2024
10 Feb 2024
20 Feb 2024
10 Feb 2024
19 Feb 2024
12 Feb 2024
Amount
1. PITC of 1 No. Submersible Pumping Units 4000 GPH × 80 mtr head for existing T/well Targwal under WSS SUNAIL JAYANTI 2. PITC of H C Pump set (2 no.) unit for existing T/well Targwal under WSS SUNAIL JAYANTI 3. PITC of 100 KVA voltage stabilizer for existing T/well targwal under WSS SUNAIL JAYANTI 4. Design, installation, testing and commissioning of LT control/dry starter panel for the operation of H.C. induction Motor and Submersible motor for existing T/well Targwal under W S S SUNAIL JAYANTI 5. PITC of H C Pump set (1 no.) unit for existing P/Stn. Kumar Mohalla Old under WSS SUNAIL JAYANTI 6. PITC of 100 KVA voltage stabilizer for existing P/ Stn Kumar Mohalla Old under WSS SUNAIL JAYANTI 7. Design, installation, testing and commissioning of LT control panel for the operation of H.C. induction Motor for existing p/stn. Kumar Mohalla Old under WSS SUNAIL JAYANTI 8. PITC of H C Pump set (1 no.) unit for existing .P/Stn. Jyanti Old under WSS SUNAIL JAYANTI 9. PITC of 100 KVA voltage stabilizer for existing P/ Stn Jyanti Old under WSS SUNAIL JAYANTI 10. Design, installation, testing and commissioning of LT control panel for the operation of H.C. induction Motor for existing P/stn. Jyanti Old under WSS SUNAIL JAYANTI
1. Upgradation of existing transformer 63 K V A to 100 k V A Transformer P/Stn. Jyanti Old under WSS SUNAIL JAYANTI 2. PITC of 3000 GPH x 80 mtr head Submersible pump sets along with allied works =2 nos.at T/Well Chage da Mohalla (New Borewell) 3. Designing fabrication, installation, testing and commissioning of 1 no.(one incoming and one outgoing) LT control panel fully automatic LT control panel for. Chage da Mohalla (New Borewell) 4. PITC of 63 KVA voltage stabilizeralong with allied works. Chage da Mohalla (New Borewell) 5. PITC of 3000GPH x120 mtr head Submersible pump sets along with allied works =2 nos.at Station A (Ram lal Mohalla) new borewell 6. Designing fabrication, installation, testing and commissioning of 1 no (one incoming and one outgoing) LT control panel fully automatic LT control panel for. Station A (Ram lal Mohalla) new borewell 7. PITC of 63 KVA voltage stabilizer along with allied works. Station A (Ram lal Mohalla) new bore 8. PITC of 3000GPH x 120 mtr head Submersible pump sets along with allied works =2 nos.at Malpur Chandian (New Borewell) 9. Designing fabrication, installation, testing and commissioning of 1 no. (one incoming and one outgoing) LT control panel fully automatic LT control panel for Malpur Chandian (New Borewell) 10. PITC of 100 KVA voltage stabilizer along with allied works Malpur Chandian (New Borewell) 11. Upgradation of existing substation to 250 KVA along with allied works at Malpur Chandian (new borewell) 12. PITC of 3000GPH x 80 mtr head Submersible pump sets along with allied works =2 nos. at Station B (Near high school Chandian) new borewell 13. Designing fabrication, installation, testing and commissioning of 1 no. (one incoming and one outgoing) LT control panel fully automatic LT control panel for. Station B (Near high school Chandian) new borewell. 14. PITC of 63 KVA voltage stabilizer along with allied works at Station B (Near high school Chandian) new borewell
1. PITC of 2 No. Submersible Pumping Units for new B/well-I Garkhal under WSS Garkhal 2. Design, fabrication, installation, testing and commissioning of dry starter panel for the operation of Submersible motor for new B/well-I Garkhal under WSS Garkhal 3. PITC of 100 KVA voltage stabilizer for new B/well-l Garkhal under WSS Garkhal 4. PITC of 2 No. Submersible Pumping Units for new B/well-II Garkhal under WSS Garkhal 5. Design, fabrication, installation, testing and commissioning of dry starter panel for the operation of Submersible motor for new B/well-II Garkhal under WSS Garkhal
M/s cee kay Traders
NACHIKETA TECHNOLOGY
Ms R K Gupta and Co
JAY AAR ENTERPRISES
R R CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
SOW2.pdf
Tender Documents • 2.01 MB
BOQ_716559.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .