Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹14.1 L
EMD Value
₹15,000
Closing Date
1 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, Ariyalur
Providing CC road 5 nos in Package No.TN 30-20 in Jeyankondam Block of Ariyalur District Under AGAMT II 2021-22
2022_RDTN_247582_1
R.C.No.A4/5304/2021, Date.10.08.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
Jeyankondam
As per tender documents
4 documents required · 4 mandatory
₹0
₹15,000
14 Sept 2022
17 Aug 2022
1 Sept 2022
17 Aug 2022
1 Sept 2022
17 Aug 2022
Amount
1.Providing CC Road at Meensuriti Register Office Opposite street in Gundaveli Pt (36m) Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete.
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name board
2.Providing CC Road at M.S. Madam Thooppu theru in M.S. Madam Pt. (105m) Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete.
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name board
3.Providing CC Road at Reddipalayam Irular Street in M.S.Madam Pt. (58m) Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete.
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name board
4.Providing CC road at T.Kaikalatheru Keelatheru Chinnadurai House to Selvakumar house in Thathanur Pt. (44m) Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete.
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name board
5.Providing CC road j.Naduveli Keelatheru Kolanji House to Manikandan House in Thathanur Pt. (40m) Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete.
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KANNAN.R
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .