| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC AS PER WO | |
| 2 | L2₹3.8 L+₹13,792 (3.79%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance AS PER TCR | |
| 3 | L3₹3.9 L+₹21,698 (5.97%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance AS PER TCR |
Tender Value
₹3.6 L
EMD Value
₹5,000
Closing Date
11 Jul 2022, 10:00 amClosed
GM, BANKOLA AREA
OFFICE OF THE GM, BANLOLA AREA, UKHRA, PIN-713363
Installation of underground substation at 0L/5R for CM Section at Shyamsundarpur Colliery under Bankola Area
2022_ECL_248283_1
ECL/GM/BA/E TENDER/22-23/Enm/47 28.06.2022
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
BANKOLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
27 Sept 2022
29 Jun 2022
12 Jul 2022
29 Jun 2022
11 Jul 2022
30 Jun 2022
29 Jun 2022 - 4 Jul 2022
Amount
Item Description/ Heading
Collection of Trolley from CM Section and lifting to surface and loading of TSU Transformer and TSU Breaker and two nos. of Prabhu Make VCB on trolley and lifting them upto pit top.
Lowering of Transwitch Transformer from Pit top to Pit Bottom after dismantling of Cage and again fitting of Cage after lowering.
Lifting of three roll of PVC armoured cable of 150 sq. mm , 200 meter length each roll to Pit top from workshop and then Lowering of 2 Nos. of Prabhu Make VCB, TSU Breaker and three roll of PVC armoured Cable (3 x 200 meter = 600 meter) from Pit top to Pit Bottom.
Transportation of TSU Transformer, TSU Breaker, two nos. of Prabhu Make VCB from Pit Bottom to 0L/5R by manually pulling on trackline and unloading and placing at substation. (assembling of TSU)
Unreeling of three roll of cable of 150 sq. mm, 200 meter length each roll at Pit Bottom and laying it from 0L/5R substation to 12L/1WD substation by manually carrying over shoulder and then hanging the cable.
Transportation of 3 Nos. of Prabhu Make VCB’s from 28L/22ED to Pit Bottom by haulage and from Pit Bottom to 0L/5R by manually pulling on trackline and then unloading and placing at substation.
Transportation of 2 nos of ACB’s from 20L/30ED to 0L/5R substation
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .