Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance NO 18 DUVARAGAPILYAR KOIL STREET TIRUPATHUR 635601 | TIRUPATHUR | TAMIL NADU | 635601 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹11.0 L+₹18,812.78 (1.74%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹11.8 L+₹97,189.68 (8.98%)Admitted-Fee/PreQual/Technical/Finance TAMIL NADU | SIVAGANGA | TAMIL NADU | 630301 | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Lakshmipathy m L2 | ANU CONSTRUCTION L1 | Sankar Contractor L3 |
|---|---|---|---|---|---|---|
| 1.00Providing Cement Concrete Drain from Jalagamparai road to Sowlur at Sowlur H/O Kurumbakeri (316 Meter) | ||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 165.51 | cu.m | 150 ₹24,826.5 | 242 ₹40,053.42 | 130 ₹21,516.3 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 27.8 | cu.m | 5,300 ₹1,47,340 | 4,200 ₹1,16,760 Lowest | 4,500 ₹1,25,100 |
| 4.00 | Supplying And Erection Of Steel Centering For Sides And Soffits Inclduing Cost And Conveyance Of All Charges | 513.19 | Sq.m | 310 ₹1,59,088.9 Lowest | 387.73 ₹1,98,979.16 | 480 ₹2,46,331.2 |
| 5.00 | Cement concrete 1:3:6mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum | 58.74 | cu.m | 5,600 ₹3,28,944 | 5,324.36 ₹3,12,752.91 Lowest | 5,500 ₹3,23,070 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.06 | MT | 90 ₹5.4 Lowest | 82,285 ₹4,937.1 | 88,000 ₹5,280 |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.54 | cu.m | 7,800 ₹4,212 | 7,260.49 ₹3,920.66 Lowest | 7,500 ₹4,050 |
| 8.00RCC NON PRESSURE SPUN PIPE AS PER IS 458/2003 RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints | ||||||
| 9.00 | 300mm dia pipe | 86 | RM | 900 ₹77,400 Lowest | 968.08 ₹83,254.88 | 1,000 ₹86,000 |
| 10.00 | Lowering Rcc pipes and specials into the trenchesand laying to proper grade and alignment all labour charges for mixing, laying and curing etc complete for bed blocks for Rcc pipes etc. complete. | 43 | EACH | 400 ₹17,200 | 193.61 ₹8,325.23 | 90 ₹3,870 Lowest |
Tender Value
Refer Docs
EMD Value
₹27,600
Closing Date
18 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development Officer BP
Tirupathur Block
Tirupathur District 15th CFC Block Panchayat - 2025-2026 Providing Cement Concrete Drain from Jalagamparai road to Sowlur at Sowlur H/O Kurumbakeri Panchayat (316 Meter) Tirupattur Block Package No.01
2026_RDTN_721596_1
A3/193/2025
Open Tender
Civil Works
Item Rate
180 days
Tirupathur Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹27,600
19 Nov 2026
4 Nov 2026
19 Nov 2026
4 Nov 2026
18 Nov 2026
4 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Cement Concrete Drain from Jalagamparai road to Sowlur at Sowlur H/O Kurumbakeri (316 Meter) | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 165.51 | cu.m | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 27.8 | cu.m | - | - |
| 4 | Supplying And Erection Of Steel Centering For Sides And Soffits Inclduing Cost And Conveyance Of All Charges | 513.19 | Sq.m | - | - |
| 5 | Cement concrete 1:3:6mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum | 58.74 | cu.m | - | - |
| 6 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.06 | MT | - | - |
| 7 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.54 | cu.m | - | - |
| 8 | RCC NON PRESSURE SPUN PIPE AS PER IS 458/2003 RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints | - | - | - | - |
| 9 | 300mm dia pipe | 86 | RM | - | - |
| 10 | Lowering Rcc pipes and specials into the trenchesand laying to proper grade and alignment all labour charges for mixing, laying and curing etc complete for bed blocks for Rcc pipes etc. complete. | 43 | EACH | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 0.62 MB
BOQ_866506.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .