| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 CrAccepted-AOC | ₹12.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹13.1 CrRejected-Finance | ₹13.1 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹13.9 CrRejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹13.9 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Rejected by Committee |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Rejected by Committee |
Tender Value
₹14 Cr
EMD Value
₹28 L
Closing Date
11 Jun 2020, 4:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Widening and Strengthening of Chhaprauli Kishanpur Biral, Via Gangnauli, Doghat, Pusar up to Barnawa road (ODR) From Ch. 11.550 to 23.000 in District Baghpat.
2020_CEMRT_472054_1
1163/11 Cashier (CB BAG) MRT CIR/20 DT. 04.05.2020
Open Tender
Civil Works
365 days
EE CD PWD BAGHPAT
CLASS A
3 documents required · 3 mandatory
₹2,354
EE CD PWD BAGHPAT
₹28 L
Yes
SE MEERUT CIRCLE PWD MEERUT
14 Jul 2020
19 May 2020
12 Jun 2020
19 May 2020
11 Jun 2020
19 May 2020
19 May 2020
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Construction of embankment with approved material obtained from borrow pits with all lifts (Distance 2.00 km) and all leads, transporting to site, spreading, grading to required slope and mechanicalley compacting to meet requirement of table 300-2. (Ref. to Mort&H Specification No.305) Rate as per PWD SI No.253. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Dismantling of existing structures,like Interlocking Tiles, culverts, bridges, retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202..Rate as per PWD SI No.10.29 New Item 4. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Resoling with dismantelled Bricks assumming 60% of the dismanteleed bricks to be non-usable (60% of Item 12)(Labur Only) .Rate as per PWD SI No10.29 New Item 20. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including all taxes, labour, material & T.P. but excluding cost of G.S.T.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Wet Mix Macadam (Staibilization Layer) Providing, laying, spreading and compacting graded stone ggregate to wet mix macadam mixing 3.50% emulsion SS and 1% cement (as per ENC letter no. 368dSEi&iz0v0 fodkl@01 ljdqyj@16 fnukad 04-09-16½ specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Providing and applying tack coat with bitumen VG -10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including all taxes, labour, cess material & T.P. but excluding cost of G.S.T
Providing and applying tack coat with bitumen VG -10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Excavation in foundation in ordinary soil (loam clay and sand) including lift upto 1.50 M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation treches as per S.I. No. 251. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Cement concrete with 2 cm gauge approved stone aggregate, coarse sand and cement in proportion 4:2:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. 279A. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
M-150 class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (as per PWD SI No. 307). Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
12 mm thick plaster with 1 part of cement and 3 part of coarse sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. As per PWD SI No. 583). Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
R.C.C. work with cement, approved coarse sand and 20 mm gauge approved stone grit in proportion of 1:1.5:3 in slabs excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. required for proper completion of work, binding wire to be supplied by the contractor free of cost. as per SI 288. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
M.S. torsteel in plain work such as R.C.C. or R.B. work including binding for proper shape and including supply of steel and its wastage, bend hooks and autorised overlapping shall be measured. As per SI 504. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
P.C.C. 1:4:8 with stone ballast. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Coarse Sand Below pipe. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
RCC Developers ltd.
Preeti Buildcon Private Limited
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF