Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.1 LAdmitted-Finance | -35.00% | ₹35.1 L | L1 | Admitted-Finance |
| 2 | L2₹39.1 L+₹4.0 L (11.5%)Admitted-Finance | -27.55% | ₹39.1 L+₹4.0 L (11.5%) | L2 | Admitted-Finance |
| 3 | L3₹45.9 L+₹10.8 L (30.8%)Admitted-Finance | -14.99% | ₹45.9 L+₹10.8 L (30.8%) | L3 | Admitted-Finance |
Tender Value
₹54 L
EMD Value
₹1.1 L
Closing Date
8 Jun 2026, 4:00 pmClosed
Er Rajesh Kumar
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2026_PWDJK_311043_1
e-NIT No. 17 of 2026-27 dated 26-05-2026
Open Tender
Civil Works
Percentage
180 days
Basohli
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer PWD R and B Division Basohli
₹1.1 L
Executive Engineer PWD R and B Division Basohli
9 Jun 2026
26 May 2026
9 Jun 2026
27 May 2026
8 Jun 2026
30 May 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables, etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed lead upto 1mtr. from cutting edge. | |||||
| 1.01 | All kinds of soil. = 70% | 137.61 | cum | 479.3 | ₹65,956.47 |
| 1.02 | Hard Rock (Blasting prohibited) = 30% | 58.98 | cum | 2,261.8 | ₹1,33,400.96 |
| 2 | Providing and laying cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: a) 1:5:810 (1 cement:5 coarse sand:10 graded stone aggregate 40mm nominal size). | 37.52 | cum | 4,826.5 | ₹1,81,090.28 |
| 3 | Providing and laying cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: a) 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) | 76.63 | Cum | 5,733.6 | ₹4,39,365.77 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring ,shuttering, finishing and reinforcement. All work upto plinth level with: a) 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size). | 18.71 | Cum | 7,788.4 | ₹1,45,720.96 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. a) 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 4.59 | Cum | 9,395.7 | ₹43,126.26 |
| 6 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately). a) Sal Wood. | 1.06 | cum | 1,42,085.65 | ₹1,50,610.79 |
| 7 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete. A) Fixed to openings / wooden frames with rawl plugs screws etc. | 408 | Kg | 231.15 | ₹94,309.2 |
| 8 | Brick work with common burnt clay (non modular) bricks of class designation 7.5 in foundation and plinth including curing in cement mortar 1:6 (1 cement:6 coarse sand). | 60.9 | Cum | 7,571.55 | ₹4,61,107.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1006935.xls
BOQ • 0.31 MB
Corrigendum17on04-06-2026.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .