Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.8 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹41.3 L+₹49,194.40 (1.20%)Rejected-AOC | L2 | Rejected-AOC ACCEPT |
Tender Value
Refer Docs
EMD Value
₹41,200
Closing Date
16 Feb 2024, 3:00 pmClosed
The block development officer
The block development officer,K.V.Kuppam
VELLORE DISTRICT CONSTRUCTION OF RCC SLAB CULVERT (3.00 MTRS. SPAN) AT JADAKUTTAI COLONY IN NAGAL PANCHAYAT FOR K V KUPPAM BLOCK.FOR K.V KUPPAM BLOCK NNT 2023-24 PACKAGE NO 26
2024_RDTN_424410_1
A2/0098/2024
Open Tender
Civil Works
Item Rate
180 days
The block development office, K.V.Kuppam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹41,200
1 Jun 2024
14 Feb 2024
16 Feb 2024
14 Feb 2024
16 Feb 2024
14 Feb 2024
Amount
VELLORE DISTRICT CONSTRUCTION OF RCC SLAB CULVERT (3.00 MTRS. SPAN) AT JADAKUTTAI COLONY IN NAGAL PANCHAYAT FOR K V KUPPAM BLOCK.FOR K.V KUPPAM BLOCK NNT 2023-24 PACKAGE NO 26
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete (Below Ground Level)
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete (Above Ground Level)
P.C.C 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming etc Complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal includingcost and conveyance of all materials to site and all labour for etc Complete
Letering and Painting Name board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
c.velu
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_504530.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .