| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.7 Cr+₹4.9 L (2.97%)Rejected-Finance | ₹1.7 Cr+₹4.9 L (2.97%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.8 Cr+₹18.8 L (11.4%)Rejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.8 Cr+₹18.8 L (11.4%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.8 Cr+₹19.1 L (11.6%)Rejected-Finance 00 SHIVPURI BRIJRAJ NAGAR MARTHNA ETAWAH | ETAWAH | ETAWAH | UTTAR PRADESH | ₹1.8 Cr+₹19.1 L (11.6%) | L-4 | Rejected-Finance L-4 |
| 5 | Rejected-Technical GAVE UPEDA PO FIROZABAD UTTAR PRADESH | FIROZABAD | UTTAR PRADESH | 224172 | - | - | Rejected-Technical All Bid Rejected in Technical Evaluation |
Tender Value
Refer Docs
EMD Value
₹4.5 L
Closing Date
24 Jul 2024, 3:00 pmClosed
Superintending Engineer
Irrigation Work Circle Banda
Restoration of Alona Dy. from km 10.000 to km 30.800 District Banda Under Ken Canal Division Banda. (LOT-02) Retender
2024_UPIDC_932513_2
01/SE/2024-25
Open Tender
Civil Works
Item Wise
180 days
Banda
please refer tender documents.
2 documents required · 2 mandatory
₹2,354
₹4.5 L
Irrigation Work Circle Banda
17 Sept 2024
16 Jul 2024
24 Jul 2024
16 Jul 2024
24 Jul 2024
16 Jul 2024
16 Jul 2024
Amount
Dismantling of P.C.C, brick or stone masonry including disposal of refuse as directed by Engineer in charge within 60 mtr. distance and cost of all labour, T&P etc complete.
Dismantling of Reinforced cement concrete including disposal of refuse as directed by Engineer in charge within 60 mtr distance and cost of all labour, T&P etc.
Earth work in excavation of foundation in all type of soil including lead upto 30 m and lift 1.5 mtr with levelling, dressing and manual compaction etc required for proper completion of work as per direction of Engineer in charge.
Supplying and laying fine sand FM-1.25 including all cost of material, cartage, labour T&P etc all complete.
Supplying and laying coarse sand FM-2.60 including all cost of material, cartage, labour T&P etc all complete.
Laying C.C 1:3:6 with cement, coarse sand and 22.40-53mm stone grit including mixing, laying ramming, curing and all cost of material, labour, T&P etc all complete.
First class-150 Brick work in 1:4 CM with cement, coarse sand including all cost of material, labour, T&P, curing etc all complete.
R.C.R stone masonary in 1:4 CM with cement, coarse sand and 20 cm x 20cm x 15cm size of Khanda stone including all cost of material, labour, T&P curing etc all complete.
Laying C.C. 1:2:4 with Cement, coarse sand and 11.20-19 mm stone grit including mixing with machine, laying, curing and all cost of material, labour, T&P etc all complete.
Laying C.C. 1:1½:3 with cement, coarse sand and 11.20-19 mm gauge stone grit including mechanical mixing, vibrator, laying, curing and all cost of material, labour, T&P etc all complete.
Laying R.C.C. 1:1½:3 with cement, coarse sand and 11.20-19 mm stone grit including mechanical mixing vibration, laying, curing and all cost of labour, material, T&P etc all complete.
Supply & Laying Dry Khanda stone (20cm×20cm×15cm) in pitching, then grounting in 1:4 cm with cement and coarse sand including prepration of sub base with all cost of materials, labour, T&P etc all complete.
Centering and shuttering for R.C.C work including all cost of labour, materials, T&P etc complete.
Centering and shuttering for C.C work including all cost of labour, materials, T&P etc complete.
Steel reinforcement for RCC work including cutting, bending, binding and placing in position with all cost of material, labour, T&P etc required for proper completion of work.
Struck raised cement pointing with 1:2 cm with cement and coarse sand including all cost of material, labour, T&P etc all complete.
Earth work in filling for strengthening and restoration of banks in all type of soil by transported earth including all lead and lift with levelling, dressing, manual compaction, cartage and cost of borrowed earth etc required for proper completion of work as per direction of Engineer in charge.
Earth work in excavation for correcting internal section in all type of soil including lead upto 30 m and lift 1.5 m with levelling, dressing and manual compation etc. required for proper completion of work.
Earth work in excavation in making diversion and correcting internal section in all type of soil including lead upto 30m and lift 1.5 m with levelling, dressing and manual compation etc. required for proper completion of work embankment of Bank more than 1.5 mtr hight above G.L. as per direction of Engineer in charge.
Painting walls with premium Acrylic smooth exterior paints with silicone additives of required shade. New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm.
Supplying and laying dry stone boulder in pitching on approach road including all cost of materials, labour, T&P etc all complete.
Supplying, laying and jointing NP-3 R.C.C. hume pipe 150 mm dia with collar including all cost of material, labour, T&P, cartage etc required for proper completion of work as per direction of Engineer in charge.
Supply & Fixing M.S. sign board (1.20m×0.90m) during construciton of work with Angle (40mm×40mm×6mm) and 25X3mm flat iron bracing with 18 S.W.G. M.S. sheet with one coat of red oxide primer to be fixed at 0.9m above ground & 0.6m deep into ground including all cost of material, labour, T&P etc.
M/s HARI CONSTRUCTION
BHAMAR SINGH
M/S Yuraj construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .