| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 CrAdmitted-Finance CMS ATS GSO KALPAKKAM 603 102 CHENGALPATTU DISTRICT TAMIL NADU | CHENGALPATTU | TAMIL NADU | 603102 | ₹9.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.9 Cr+₹49.5 L (5.27%)Admitted-Finance | ₹9.9 Cr+₹49.5 L (5.27%) | L2 | Admitted-Finance |
| 3 | L3₹10.0 Cr+₹65.8 L (7.01%)Admitted-Finance | ₹10.0 Cr+₹65.8 L (7.01%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not meeting the NIT eligibility criteria of similar works |
| Sl No | Description | Qty | Unit | M/s. Ashok constructions L1 | SEKAR CONSTRUCTIONS L2 | A.KULANDAI RAJ AND CO. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Area cleaning in and around the site by cleaning the bushes, debris, fallen trees, waste materials, garbages etc., collecting, conveying and disposing the same at places as shown by the department with a lead of 100 metres all complete as per specification and as directed by the Engineer-in-charge. | 2,500 | Sq.m | 9 ₹22,500 Lowest | 12 ₹30,000 | 10 ₹25,000 |
| 2.00Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge.(if water encountered during excavation , it shall be drained out by proper dewatering arrangements and power supply required for dewatering shall borne by the contractor.) | ||||||
| 2.10 | All kinds of soil with depth up to 1.5m below average Ground level and disposing surplus excavated earth up to a lead of 1.00 Kilometres. | 7,500 | Cum | 600 ₹45,00,000 Lowest | 690 ₹51,75,000 | 720 ₹54,00,000 |
| 2.20 | All kinds of soil with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth up to a lead of 1.00 Kilometres. | 7,500 | Cum | 650 ₹48,75,000 Lowest | 790 ₹59,25,000 | 820 ₹61,50,000 |
| 2.30 | All kinds of soil with depth exceeding 3m but not exceeding 4.5m below average Ground level and disposing surplus excavated earth up to a lead of 1.00 Kilometres. | 4,500 | Cum | 752 ₹33,84,000 Lowest | 950 ₹42,75,000 | 925 ₹41,62,500 |
| 3.00 | Extra Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc.., all as per drawing / specification and as directed by Engineer In Charge. (Measurements to be taken of the face area timbered): | 700 | Sqm | 1,000 ₹7,00,000 Lowest | 2,500 ₹17,50,000 | 1,850 ₹12,95,000 |
| 4.00 | Supply, fixing and laying bi-axial geo-grids, stiching as per specification at junction, Leveling and laying at site as per drawing and direction by Engineer-in-charge. The reqired testing for qualofication will be carried out by the contractor at his cost. (Payment will be made as per actual measurement at site, laps will also be measured for payment) | 4,700 | Sq.m | 290 ₹13,63,000 Lowest | 300 ₹14,10,000 | 310 ₹14,57,000 |
| 5.00 | Providing and laying plain cement concrete M20 grade using 300 kg/cum of PPC, 20mm maximum size graded aggregates and washed crushed stone sand including mechanical mixing, transporting and placing in required position, ramming, compaction, levelling, curing, shuttering, dewatering if any, complete all as per specification for levelling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. Dosage of PCE based admixture as per workability requirment at site conditions.
Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Polycarboxylate ether (PCE) based chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility.
2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor.
3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/ downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F. | 150 | Cum | 9,500 ₹14,25,000 Lowest | 9,600 ₹14,40,000 | 9,700 ₹14,55,000 |
| 6.00Providing and laying cast insitu controlled reinforced cement concrete of specified grade at all levels and lifts mentioned below using 20mm maximum size hard granite machine washed crushed graded stone aggregates and washed crushed stone sand including testings as per QAP, weigh batching, charges for mixing & cost of admixture, mechanical mixing, transporting and placing at all lifts, vibrating, consolidating, 14 days curing and finishing smooth of all exposed faces complete for column footing, columns, lintels, sunshades, gutter slabs, beams, slabs, water tank, machine foundation and all other structural elements including dewatering wherever necessary (Formwork and reinforcement will be paid for separately) all as per specification and all as shown in drawings and as directed by the Engineer-in-charge for all insitu item. Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Polycarboxylate ether (PCE) based chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility. 2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor. 3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/ downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F. | ||||||
| 6.10 | M30 grade with 380 kg of PPC per cu.m. of concrete upto plinth level | 850 | Cum | 10,500 ₹89,25,000 Lowest | 10,800 ₹91,80,000 | 10,900 ₹92,65,000 |
Tender Value
₹9.3 Cr
EMD Value
₹18.6 L
Closing Date
7 Nov 2022, 4:00 pmClosed
Project Director
Office of the Project Director, FRFCF-NRB, Kalpakkam.
Construction of Allied service duct supporting structure at FRFCF project site, Kalpakkam
2022_BARC_716414_1
NRB/FRFCF/CIVIL/2022/075
Open Tender
Civil Works - Others
Item Rate
365 days
FRFCF, Kalpakkam
Please refer tender document
8 documents required · 8 mandatory
₹0
₹18.6 L
FRFCF, Kalpakkam
15 Mar 2023
7 Oct 2022
9 Nov 2022
7 Oct 2022
7 Nov 2022
28 Oct 2022
7 Oct 2022 - 17 Oct 2022
21 Oct 2022
Amount
Area cleaning in and around the site by cleaning the bushes, debris, fallen trees, waste materials, garbages etc., collecting, conveying and disposing the same at places as shown by the department with a lead of 100 metres all complete as per specification and as directed by the Engineer-in-charge.
All kinds of soil with depth up to 1.5m below average Ground level and disposing surplus excavated earth up to a lead of 1.00 Kilometres.
All kinds of soil with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth up to a lead of 1.00 Kilometres.
All kinds of soil with depth exceeding 3m but not exceeding 4.5m below average Ground level and disposing surplus excavated earth up to a lead of 1.00 Kilometres.
Extra Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc.., all as per drawing / specification and as directed by Engineer In Charge. (Measurements to be taken of the face area timbered):
Supply, fixing and laying bi-axial geo-grids, stiching as per specification at junction, Leveling and laying at site as per drawing and direction by Engineer-in-charge. The reqired testing for qualofication will be carried out by the contractor at his cost. (Payment will be made as per actual measurement at site, laps will also be measured for payment)
Providing and laying plain cement concrete M20 grade using 300 kg/cum of PPC, 20mm maximum size graded aggregates and washed crushed stone sand including mechanical mixing, transporting and placing in required position, ramming, compaction, levelling, curing, shuttering, dewatering if any, complete all as per specification for levelling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. Dosage of PCE based admixture as per workability requirment at site conditions. Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Polycarboxylate ether (PCE) based chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility. 2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor. 3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/ downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F.
Providing and laying cast insitu controlled reinforced cement concrete of specified grade at all levels and lifts mentioned below using 20mm maximum size hard granite machine washed crushed graded stone aggregates and washed crushed stone sand including testings as per QAP, weigh batching, charges for mixing & cost of admixture, mechanical mixing, transporting and placing at all lifts, vibrating, consolidating, 14 days curing and finishing smooth of all exposed faces complete for column footing, columns, lintels, sunshades, gutter slabs, beams, slabs, water tank, machine foundation and all other structural elements including dewatering wherever necessary (Formwork and reinforcement will be paid for separately) all as per specification and all as shown in drawings and as directed by the Engineer-in-charge for all insitu item. Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Polycarboxylate ether (PCE) based chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility. 2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor. 3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/ downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F.
M30 grade with 380 kg of PPC per cu.m. of concrete upto plinth level
M30 grade with 380 kg of PPC per cu.m. of concrete for all floors
Supplying, fabricating, erecting and fixing in position at all levels, centering and shuttering to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. The measurement for the formwork will be the actual area of forms in contact with concrete surfaces. Shuttering with plywood panels alone will be permitted.
Providing straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts. Note: The rate shall be including the cost and testing of reinforcement steel at thrid party NABL lab. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 11 of Section VIII, General Information for Guidance of Tenderers.
Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment's/pipe and sleeves/penetration etc. Using MS angles, channels, I-sections, plates, tees, flats, rounds, square sections etc. including chamfering and rounding off the edges, applying a coat of Red lead paint primer / Zinc chromate primer of approved make and 2 coats of flat oil paint / sythetic enamel paint of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge. Note: Lifting device arrangements if any required also arranged by the contractor at his own cost.
Providing F3 finish over concrete surface in cement mortar 1:1.5 using crushed stone sand (1 part cement : 1.5 part fine sand) including wetting the surface, labours, curing, all materials, scaffolding, at all elevations complete all as per specification and as directed by the Engineer-in-charge.
Providing and applying painting Two coats at all levels including ceiling with Acrylic emulsion paint Internal/External (ACE or Equivalent approved brand, colour and manufacturer) to give an even shade including one under coat of suitable primer, applying putty, preparation of the surfaces, scaffolding complete all as per specifications and as directed by the Engineer-in-charge.
Providing and fixing in position 50mm thick Thermocole board heavy density minimum 18.00 Kg/Cu.m weight wrapped in 200micron thickness polythene sheets and placing in machine foundation works complete all as per specifications, drawings & as directed by the Engineer-in-charge.
Providing Structural steel work in M.S plain plates and chequrred Plates in Embedded Parts, Trench Covers, Connection plates etc. including cutting, hoisting, fixing in position and applying a priming coat of approved zinc chromate steel primer etc. including cost of structural steel Plates, welding all labour charges etc. complete as per drawings and specifications. Structral steel plates to be used shall be of approved make.
SS Plate EPs: Including Supply, transportation of AISI S.S.304L quality plates with thickness varying from 6 to 25mm and including supply of 10 to 25mm dia anchor rods conforming to IS 2062 marking, cutting, surface treatment, fabrication and erection of embedded parts as per tender drawings. The welding of S.S. plate with anchor rods shall be using SMA welding process with E 309 electrodes. The Liquid penetrant Examination shall be carried out on 10 % final pass of all weld joints after thorough cleaning. All embedment S.S. plate EPs shall be stamped legibly with EP number.
SEKAR CONSTRUCTIONS
A.KULANDAI RAJ AND CO.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .